Date Performed: October 4, 1999 Report Number: 722-90227 -43
Client: Mr Ron Sather Project Name: Ambleslde SubdivIsion-First Add
CIty of Springfield
225 5th Street Project Location: Spnngfleld, Oregon
Springfield, Oregon 97477
P.O. No.: Job No P3-0115 Permit No.: N/A
Type of Inspection: SOIls Weather: N/A
Field Observations and Comments
PSI representative observed track-hoe stripping of organrcs contaminated SOil along lot line boundary between south
faCing lots on Ambleslde Drive and north faCing lots on Falcon Drive BUried grass strlpplngs and buned rooted grass
and shrubs were revealed and removed throughout the extent of the current excavation which extends approximately 25
feet south of the lot line between lots 94 through 102 (faCing Falcon Dnve) Subgrade elevation was Identified through
thiS excavation and three subgrade elevations were measured as follows at approximately 115 feet south of station
2+00 on Falcon Dnve = 47804 feet, at approximately 105 feet south of station 4+00 on Falcon Drive = 48449, at
approximately 90 feet south of station 5+25 on Falcon Dnve = 490 34 Some strlpplngs were trucked off Site, while
some was stockpiled In lots 27 through 29, and 33 through 37
p~' representative observed excavation of four (4) potholes In the approximate center of lots 96, 98, 99 and 100 Only
I. ,e pothole In lot #100 was buned organics discovered ApprOXimately 18 Inches of primarily wood chips and grass
were found at approximately 6 Inches below current ground elevation The other three potholes were clean
Along the western edge of the Site, buned organic (grass) was seen to "Daylight Out" at approximately the intersection
of the back lot line and the lots 94/95 boundary Please see accompanYing map for depiction of the referenced areas
Inspector: Mike Dewey
If you have any questions regarding thiS report, please feel free to contact us at 541-746-9649
ResPlc~~
~mond V Allpertl, CS Dept Manager
Springfield Branch
Attachment - Site Plan
,\~'92.021~~<J
fo~ Ii.. ~v
~ pC ~
too;: IS-
:it OC1 \~~~ ~
~ Rt~H\~U ;
~ M1
6'19 "tV 0
~~17€l\/
C Ling and ASSOCiates - Mr Glenn Ling
THIS REPORT IS PROVIDED FOR THE INFORMA nON OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED
ProfeSSional Service Industries, Inc. 1040A Shelley St . Springfield, 9R 97477. Phone 5411746-9649. Fax 5411746.7163
,-r-
GROUND ELEVATIONS
AMBLESIDE PHASE 111 AND IV
OCT. 1/98 if) I
SCALE 1" ==~.
LAYERS 39. 40 )
/
43
/~
/0 (1 44 ,2.7-- '102."'2- 1
o "" ~ ('CHH<:"-e5
44
I7'7:A - A f PMY, IMJt1"E
\LLJ - L...A"'"fFj;f...f>,:l- Id ~'"\'et,ll'"
of 5 ~'IJi\1101,j 't 0
C-l..S,N-J "SUR(.;il.N.t;:t
I I
J I
, {
J
/7
(
.,
I
I 6 I
/ I
\ \0
'^' l"
/ (, f
'( 172/
I / J
--
.--' .
"..... I
/ ,/ ,
-----
87 f o/f 85 //
/
I ( ,// 84
19
/ /
r . .
---
--------
45/
/
9
'" \ 1
~