HomeMy WebLinkAboutPermit Building 1991-7-25
COM M ERCiALlI N DUST RIAL;.
PERMIT APPLICATION
SPRINGFIELD . - ~/...-? ~L?
~U6iB JOB NUMBER -f ~ '--/7:>
,. -=-- INSPECTION LINE: 726-3769
. ' OFFICE: 726-3759
225 Fifth Street, Springfield, Oregon 97477
, .
LOCATION OF PROPOSED WORK: ~
1/., erZ/~.H'
;8;z:?-,~- W~_$-'
TAX LOT' ~ ~/c:>Z:>
ASSESSORS MAP:
/7 -0 3 ~ "3 ---==3 S-
.
OWNER:
~PJf!/~F-/r:z-~P~/Z~- C ~
r-;a:::> ,/fA_'rp~~ ?~- ~?-.--
~ ?~7) STATF' o.?i' --
PHONE:
7~7-~/ ~~:;:>;;tc.tf>y'''
ADDRESS:
CITY'
ZIP:
DESCRIPTION OF WORK: /'->IVI/~:r .~A~~ ~, d7~~/H"-:;;;';z1' .~ 5'__
NEW REMODEL -X- ADDITION DEMOLISH OTHER VALUE:
CONTRACTOR'S NAME
GENERAl' I'A..-...v,.<::",if'
ADDRESS
ADDRESS
;. ee,^'~tlITIMd
CO ST,
CO NT RACTO R #
PHONE
NAME
ARCHITECT: I/.!Esr r!"A:<I r ,~/".u
EXPIRES
PHONE
PLUMBING'
MECHANICA' '
ELECTRICA"
PLUMBING I MECHANICAL I
NO. FEE CHARGE I "'" """ r.1-ltr.Qn~ I
Single Fixture I FurnaceJ burner & vent I
< 100,000 BTUs
Relocated Bldg, I Furnacel burner & vent I
(new fix, addtl) > 100,000 BTUs
Water Service I Floor furnace and vent I
ft,
Sanitary Sewer I Suspended wall or floor I
It. mounted unit heater
I' Storm Sewer I Appliance Vent I
It. separate
I I Stationary evap. I
Backflow Device cooler
I I Vent Fan/Single I
duct
I I Vent System apart -,
from AC or hlg.
I I Mechanical exhaust I
hood and duct
I I I
I I Permit Issuance $10,00 I
j TOTAL PERMIT HIA I TOTAL PERMIT H/A I
QUAD AREA: J) \<. '\\ )W - OFFICE USE - HANDICAP ACCESS'
LAN D USE: \ \ \ \ FLOOD RLAIN'
# OF BLDGi" \ # OF UNIT~' ZONING: \ l\~
OCCY GROUP' CONSTR. TYP"' LIGHTING POWER BUDGET:
# OF STORIES: HEAT SOURC"' WATER HEATER' '--- .
sa FT, $/SQ, FT. VALUE
SQ, FTG MAIN X
SQ, FTG ACCESS X
SQ, FTG OTHER ,7f ~.h.z...r;C:>,.e::::;C X
/ a_ e-..c.-,-
.
TOTAL VALUE OF PROJECT
PLAN CHECK FEi: ,e;-z, '::j1~
RCPT#
DAT"
BY
I BUILDING PERMIT
15% State
Surcharoe
I MECHANICAL
15% Stat.e
Surcharoe
I PAVING
~,50
1-.03
PLUMBING
I DEMOLITION
5% State
SurcharQe
FENCE
VALUE $
SIDEWALK
FT,
f/#{ r;!aJ;EtIJ
SUBTOTAL
PERM ITS
SYSTEMS
DEVELOPMENT
5:2.33
CURBCUT
FT.
TOTAL PERMIT FEES I
EXCLUDING ELECTRICA'
/3fo. ~~
.
REQUIRED INSPECTIONS
.
It is the responsibility of the permit holder to. see that all inspections are made at the proper time. To request an Inspection, call
726-3769 (recorder), state your City deslgnated.job number, job address. type of inspection requested and when you will be ready
for InspectIon. Requests received before 7:00 a.m. will be made the same working day. requests made after 7:00 a.m. will be made
the following work day.
SITE INSPECTION: To be
made after excavation, but
prior to setup of forms.
)
ROUGH PLUMBING,
ELECTRICAL & ,
MECHANICAL: No work is to
be covered until these .
inspections have been made
and approved.
PAVING: After gravel is in
place but prior to placing
asphalt or concrete.
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel In place, but
prior to placing concrete.
FIREPLACE: Prior to placing
facing materials and before
framing inspection.
SPECIAL INSPECTIONS: In accordance
Section 306.of the State Specialty Code
a special inspector shall be employed
by the Owner I Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To tie made
before any work I s covered.
ATTIC DRAFT STOPS &
CURTAIN WALLS
)(
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all pipes, Chimneys
and vents are complete and
, th'e rough elec.trical, plumbii).g
and mechanical are approved.
STRUCTURAL CONCRETE: In
excess of 2500 RS.1. (306 a,1)
CONCRETE SLAB: To be
made after all inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are-
In place but before any
concrete is placed.
STRUCTURAL WELDS:
Performed on the job. (2722 f)
"
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are In place but
before any lath or gypsum
board Interior wall covering is
applied, .
'HIGH STRENGTH BOLTING:
During all bolt' installation and
tightening operations, (306
a.6)
SPRAYED ON
FIREPROOFING: UB.C,
Standards 43-8.
x
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork. (306 a.11 &
Chapter 29)
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
floor insulation, decking or
floor sheathing.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterior, is In
place but before any
plastering Is applied or before
gypsum board joints and
fasteners are taped and
finished,
GLU.LAM BEAMS: Inspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.B.G
STDS. 25.10,11).
POST & BEAM: To be made
prior to Installation of floor
Insulation, decking or floor
sheathing.
STRUCTURAL MASONRY: (306
a,7)
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to Installation of
decking or floor sheathing.
,
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
*In addition to the Inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
UBC 2415,
ROOF SHEATHING AND
NAILING: Prior to installing
any roof covering.
CURB AND APPROACH
APRONS: After fo'rms are
erected but prior to placing
concrete.
FINAL PLUMBING
"X.
SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish Inspection. All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesting this Inspection.
FINAL BUILDING: Requested after the final plumbing, eleclrical,
mechanical and Fire Department Inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises.
FINAL ELECTRICAL
FINAL MECHANICAL
,
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENTS'
PLANS REVIEWED BY
~~kJ~
~R' f
DATE ~/ 2. >;/7 /
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all Information
herein is true and correct, and I further certify that any and all work performed shall be done in accordance wlththe Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this project.
I further a9re,t ensure that all required Inspections are requested at the proper time, that project address is readable from the
street, that the permit card Is located at the front of the property, and the approved set of plans will remain on the site at all
~::~9C ;~:~~~~ Date:?-~ql
""Cro~, !J AMO"" ""''?\'' , \ 5iuJ . i ~ M" "'0, 'Li1U'1) ,
" RECEIPT N: ~ )~'8~ ...\ RECEIVED ~k,{1-J