Loading...
HomeMy WebLinkAboutPermit Building 2000-6-8 . 225 North Fifth Street Springfield, OR 97477 . . 'Page 1 of3 TRANS#:01-0002075 DATE:JUN 08 2000 AMT RECD:2 $ 534.35 , CHANGE: CASHIER: 061 I Job# 00-00751-01 I I CITY OF SPRINGFIELD~ OREGON RESIDENTIAL PERMIT City Of Springfield Community Services Division Building Safety Job Number: 00-00751-01 Office: 726-3759 Inspection Line: 726-3769 Location Of Proposed Site: 2555 Hayden Bridge Rd Spr Assessors Map#: 17032441 Lot: Block: Addition: Owner: Address: Tax Lot #: 00200 Subdivision: Roger Hunter 2555 Hayden Bridge Road Phone Number: 541-747-6178 City/State/Zip: Springfield, OR 97477 New Value: $33,452 Two story shop - has been reviewed in June of 1999. They had not picked it up and plan review Axnirp.rt. Nnw it mll~t hp. rfuAviAwArt Office Use Land Use: Single Family Dwelling Zoning Code: LDR Bedrooms: Range: Scope Of Work: Garage Quad Area: # Of Units: Constr. Type: Water Heater: 2RNW # Of Buildings: Occupancy Group: Heat Source: Sq. Footage: Accessory Structu (VN) Wood Frame To request an inspection call1he 24 hour recording at 726-3769. All inspections requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a,m, will be made the following working day. Verify Ground Rod Footing Foundation Slab Ceiling Insulation Shear Wall Nailing Framing Wall Insulation Drywall Final Building Rough Electrical Electrical Service Final Electrical Underfloor Plumbing Rough Plumbing Sanitary Sewer Line Storm Sewer Line Required Inspections I Buildinll I., ,_.., '~""~""';J"'" .em it::qUlresyoutt. -Install ground rod at footing, and call for inspecljoIJr!nl~oDjlJ.9YQ\l\~tttJJ~OR!~9J\ltl~Lqr Bl\\!l9ation i -After trenches are excavated. <miticatlon Center. Those rules are setforth -After forms are erected but prior to concrete pla.gemeJ1!2-001-001 0 throuah OAR 952-001- - To be made after all ins lab building service eqYiP[l1enJ;Jc(m.9uAP'jp.!r,tgol!!@.;Oj~~~S\l~!B!Jl!W iter - Prior to cover. calling me center. (Note: the telephone - Before covering sheathing with finish materials~umber torthe Oregon Utilitv Notification - Prior to cover. r"":,,.;o 1 .<1')n.1?2-2344). 'Prior to Cover - Prior 10 taping. - When all required inspections have been approved and the building is complete, Electrical I - Prior to cover. -Must be approved to obtain permanent power.NOTICE' - When all electrical work is complete, . THIS PERMIT SHALL EXPIRE IF THE WORK AUTHORIZED UNDER THIS PERMIT IS NOT COMMENCED OR IS ABANDONED FOR ANY 180 DAY PERIOD. I Plumbinll -Prior to insulation or decking. - Prior to cover. - Prior to filling trench, -Prior to filling trench, . . I Job# 00-00751-01 I . Page 2 of 3 Final Plumbing Required Inspections I Plumbing I - When all plumbing work is complete. Mechanical Rough Mechanical Final Mechanical -Prior to cover, -When all mechanical work is complete. Zoning: LDR FloodPlain? 0 Wetlands? 0 Journal numbers 1: 2: Overlay District: # of Street Trees: Land Use: Single Family Dwelling Pave Driveway? 0 3: Comments:Shop can not exceed the height or square footage of the primary str Planner: Urban Growth Boundary?~ Quantity Of Fill: Supplier: Drainage: Floodway FEMA: nla Additional Requirements: Glenwood Area? 0 Required Attachments: Source Locn: Material: Flood Plain FEMA: nla Construction Types:(VN) Wood Frame Occupancy Groups:Accessory Structure # Of Buildings: # Of Bedrooms: Handicap Access? 0 iArea (Sq. Feet) I Main: Accessory~824 # Of Stories: 2 Current Units: Census Code: Does not apply Height (feet): 22 Proposed Units: Total:1824 Fee Paid On Receipt# Plan Check 06/08/2000 2075 Value/Quantity Fee Amount Residential Plan Check Total Plan Check 33,452 $137.15 $137.15 Building Permil State Surcharge For Building Permit Building Administrative Fee Total Building Building 06/08/2000 2075 06/08/2000 2075 . 06/08/2000 2075 33,452 $211,00 $14.77 $6.33 $232.10 Permanent: 200 Amps or Less Branch Circuits With Feeder or Service State Surcharge For Electrical Permit Electric Adminislrative Fee Total Electrical Electrical 06/08/2000 2075 06/08/2000 2075 06/08/2000 2075 06/08/2000 2075 1 3 $50.00 $6.00 $3.92 $1.68 $61.60 Minimum Plumbing Permit Fee Number of Fixtures State Surcharge For Plumbing Permit Sanitary Sewer Footage Storm Sewer Footage PlumbinQ 06/08/2000 2075 06/08/2000 2075 06/08/2000 2075 06/08/2000 2075 06/08/2000 2075 2 $,00 $20.00 $4.90 $25.00 $25.00 20 25 . . Job# 00-00751-01 Paid On Receipt# r Plumbing 06/08/2000 2075 . Page 3 of 3 Fee Value/Quantity Fee Amount Plumbing Administrative Fee Total Plumbing $2.10 $77.00 Minimum Mechanical Permit Mechanical Administrative Fee Vent Fan to One Duct Mechanical Issuance State Surcharge For Mechanical Permit Total Mechanical Grand Total Mechanical 06/08/2000 2075 06/08/2000 2075 06/08/2000 2075 06/08/2000 2075 06/08/2000 2075 1 $12,00 $,45 $3,00 $10,00 $1.05 $26.50 $534.35 Plan Check Type 'Initial Review-Res Engineering-Res Planning-Res Struclural-Res Checked By Lisa Hopper Steve Templin AlWard Wendy Stanley Date Completed 05/23/2000 06/02/2000 06/02/2000 06/08/2000 By signature, I state and agree that I have carefully examined the completed application and do hereby certify that all information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon. I further state that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are reque althe proper time, that the project address is readable from the street, that the permil card is loc ted t the fron of the prope,.rty, and the approved set of plans will remain on the site at all limes du ' onstruclion. \ ' ()' ' ~ =I~ ~- 'B rC9C) Signaturll Date