HomeMy WebLinkAboutPermit Building 2000-6-8
.
225 North Fifth Street
Springfield, OR 97477
.
.
'Page 1 of3
TRANS#:01-0002075
DATE:JUN 08 2000
AMT RECD:2 $ 534.35
, CHANGE:
CASHIER: 061
I Job# 00-00751-01 I
I
CITY OF SPRINGFIELD~ OREGON
RESIDENTIAL PERMIT
City Of Springfield
Community Services Division
Building Safety
Job Number: 00-00751-01
Office: 726-3759
Inspection Line: 726-3769
Location Of Proposed Site: 2555 Hayden Bridge Rd Spr
Assessors Map#: 17032441
Lot: Block: Addition:
Owner:
Address:
Tax Lot #: 00200
Subdivision:
Roger Hunter
2555 Hayden Bridge Road
Phone Number: 541-747-6178
City/State/Zip: Springfield, OR 97477
New Value: $33,452
Two story shop - has been reviewed in June of 1999. They had not picked it up and plan review
Axnirp.rt. Nnw it mll~t hp. rfuAviAwArt
Office Use
Land Use: Single Family Dwelling
Zoning Code: LDR
Bedrooms:
Range:
Scope Of Work: Garage
Quad Area:
# Of Units:
Constr. Type:
Water Heater:
2RNW
# Of Buildings:
Occupancy Group:
Heat Source:
Sq. Footage:
Accessory Structu
(VN) Wood Frame
To request an inspection call1he 24 hour recording at 726-3769. All inspections requested before 7:00
a.m. will be made the same working day, inspections requested after 7:00 a,m, will be made the following
working day.
Verify Ground Rod
Footing
Foundation
Slab
Ceiling Insulation
Shear Wall Nailing
Framing
Wall Insulation
Drywall
Final Building
Rough Electrical
Electrical Service
Final Electrical
Underfloor Plumbing
Rough Plumbing
Sanitary Sewer Line
Storm Sewer Line
Required Inspections
I Buildinll I., ,_.., '~""~""';J"'" .em it::qUlresyoutt.
-Install ground rod at footing, and call for inspecljoIJr!nl~oDjlJ.9YQ\l\~tttJJ~OR!~9J\ltl~Lqr Bl\\!l9ation i
-After trenches are excavated. <miticatlon Center. Those rules are setforth
-After forms are erected but prior to concrete pla.gemeJ1!2-001-001 0 throuah OAR 952-001-
- To be made after all ins lab building service eqYiP[l1enJ;Jc(m.9uAP'jp.!r,tgol!!@.;Oj~~~S\l~!B!Jl!W iter
- Prior to cover. calling me center. (Note: the telephone
- Before covering sheathing with finish materials~umber torthe Oregon Utilitv Notification
- Prior to cover. r"":,,.;o 1 .<1')n.1?2-2344).
'Prior to Cover
- Prior 10 taping.
- When all required inspections have been approved and the building is complete,
Electrical I
- Prior to cover.
-Must be approved to obtain permanent power.NOTICE'
- When all electrical work is complete, .
THIS PERMIT SHALL EXPIRE IF THE WORK
AUTHORIZED UNDER THIS PERMIT IS NOT
COMMENCED OR IS ABANDONED FOR
ANY 180 DAY PERIOD.
I Plumbinll
-Prior to insulation or decking.
- Prior to cover.
- Prior to filling trench,
-Prior to filling trench,
.
.
I Job# 00-00751-01 I
.
Page 2 of 3
Final Plumbing
Required Inspections
I Plumbing I
- When all plumbing work is complete.
Mechanical
Rough Mechanical
Final Mechanical
-Prior to cover,
-When all mechanical work is complete.
Zoning: LDR
FloodPlain? 0 Wetlands? 0
Journal numbers
1: 2:
Overlay District:
# of Street Trees:
Land Use: Single Family Dwelling
Pave Driveway? 0
3:
Comments:Shop can not exceed the height or square footage of the primary str
Planner:
Urban Growth Boundary?~
Quantity Of Fill:
Supplier:
Drainage:
Floodway FEMA: nla
Additional Requirements:
Glenwood Area? 0 Required Attachments:
Source Locn:
Material:
Flood Plain FEMA: nla
Construction Types:(VN) Wood Frame
Occupancy Groups:Accessory Structure
# Of Buildings:
# Of Bedrooms:
Handicap Access? 0
iArea (Sq. Feet)
I Main: Accessory~824
# Of Stories: 2
Current Units:
Census Code: Does not apply
Height (feet): 22
Proposed Units:
Total:1824
Fee
Paid On Receipt#
Plan Check
06/08/2000 2075
Value/Quantity
Fee Amount
Residential Plan Check
Total Plan Check
33,452
$137.15
$137.15
Building Permil
State Surcharge For Building Permit
Building Administrative Fee
Total Building
Building
06/08/2000 2075
06/08/2000 2075 .
06/08/2000 2075
33,452
$211,00
$14.77
$6.33
$232.10
Permanent: 200 Amps or Less
Branch Circuits With Feeder or Service
State Surcharge For Electrical Permit
Electric Adminislrative Fee
Total Electrical
Electrical
06/08/2000 2075
06/08/2000 2075
06/08/2000 2075
06/08/2000 2075
1
3
$50.00
$6.00
$3.92
$1.68
$61.60
Minimum Plumbing Permit Fee
Number of Fixtures
State Surcharge For Plumbing Permit
Sanitary Sewer Footage
Storm Sewer Footage
PlumbinQ
06/08/2000 2075
06/08/2000 2075
06/08/2000 2075
06/08/2000 2075
06/08/2000 2075
2
$,00
$20.00
$4.90
$25.00
$25.00
20
25
.
.
Job# 00-00751-01
Paid On Receipt#
r Plumbing
06/08/2000 2075
.
Page 3 of 3
Fee
Value/Quantity
Fee Amount
Plumbing Administrative Fee
Total Plumbing
$2.10
$77.00
Minimum Mechanical Permit
Mechanical Administrative Fee
Vent Fan to One Duct
Mechanical Issuance
State Surcharge For Mechanical Permit
Total Mechanical
Grand Total
Mechanical
06/08/2000 2075
06/08/2000 2075
06/08/2000 2075
06/08/2000 2075
06/08/2000 2075
1
$12,00
$,45
$3,00
$10,00
$1.05
$26.50
$534.35
Plan Check Type
'Initial Review-Res
Engineering-Res
Planning-Res
Struclural-Res
Checked By
Lisa Hopper
Steve Templin
AlWard
Wendy Stanley
Date Completed
05/23/2000
06/02/2000
06/02/2000
06/08/2000
By signature, I state and agree that I have carefully examined the completed application and do
hereby certify that all information herein is true and correct, and I further certify that any and all work
performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of
the State of Oregon. I further state that only contractors and employees who are in compliance with
ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are
reque althe proper time, that the project address is readable from the street, that the permil card
is loc ted t the fron of the prope,.rty, and the approved set of plans will remain on the site at all limes
du ' onstruclion. \ ' ()' '
~ =I~ ~- 'B rC9C)
Signaturll Date