HomeMy WebLinkAboutCorrespondence PWE 2/1/2007 (2) Page 1 of2 LlMBIRD Andrew From: ENOS Gene Sent: Thursday, February 01, 2007 8 24 AM To: L1MBIRD Andrew Cc: WRIGHT Denny, Renee@branchenglneerlng com Subject: RE McElhany status Attachments: ENOS Gene vcf As I stated In the 1/8/2007 e-mail to Andrew, the sidewalks on 32nd Street (as explained to the contractor several times) are reqUIred to be "removed and reolaced" as part of the R-O-W inspection required for that address The current construction on the eXisting set-back sidewalks are 4 Inches In depth As per standard drawing #3-21, the required depth is "6 Inches of 3,000 pSI field strength (3,450 pSI lab strength), 6 0 sack mix concrete Dn 2 Inches of compacted 3/4 " minus crushed rock The work was set-up as "one inspection site or address" All inspections remains under the onglnal address, even though the address at the corner appears completed The current site Improvements have Dot been completed, and the status for the R-O-W inspection status remains "pending" until the corrective reqUIrements are satisfied Presently, the sidewalk work does require an additional inspection (which needs to be scheduled), and this too was discussed with the contractor I was fully prepared to conduct the Inspection for the sidewalks when the approaches off 32nd street and the adjoining work were Inspected, but the contractor was not prepared at that time Please advise me when the sidewalk Improvement work has been completed and I will conduct a site VISit to venfy and Inspect at that time If there are any more questions, please feel free to contact me Thank you Gene Enos Const Insp City Of Spnngfield P W Dept / Eng DIV Office 726-6026 Fax 736-1021 From: WRIGHT Denny Sent: Tuesday, January 30, 2007 12 06 To: ENOS Gene Subject: FW: McElhany status Gene - Did you Inspect thiS? Denny From: LIMBIRD Andrew Sent: Tuesday, January 30,2007 11:45 AM To: Renee Clough Cc: WRIGHT Denny Subject: RE: McElhany status 2/1/2007 Page 2 of2 HI Renee, I have received confirmation from the Electncallnspector that Condition 12 has been satisfied However, when I inqUired about the curb and sidewalk work (S 32nd Street frontage) a few weeks ago the Englneenng Inspector adVised that It had not been completed satisfactorily In my estimation Conditions 3 and 4 are outstanding Items that still have to be satisfied before plat If there have been any recent changes, please let me know and I can arrange for a site VISit Thanks Andy From: Renee Clough (mallto:Renee@branchengrneering.com] Sent: Tuesday, January 30, 2007 9:35 AM To: UMBIRD Andrew Subject: McElhany status Andy, I am prepanng to submit a revised plan set to the survey department for the McElhany partition at S 32nd St and Virginia Ave In the pre-submittal meeting on January 5, you said that you would check with the bUlldtng department on the status of Conditions 3, 4, and 12 Does any additional work need to occur to comply with those conditions? Thanks, Renee 2/1/2007