HomeMy WebLinkAboutComments SUB 4/30/2008
! 04/30/2008 11:52 FAX 7477348
WSC FAX
!gJ 0011002
SPRINGFIELD UTILITY BOARD
W~TER ,FRVIC[ C['JTLR 202 South 18th Street SpringfIeld, OR 97477.5240 Tel 541.726 2396 Fax 5417477348 www subutd corn
April 30, 2008
Andy LlmbIrd
CIty of Springfield
225 N. 5th Street
Spnngfield, OR 97477
Dear Andy:
SUBJECT:
DEVELOPMENT ISSUES MEETING #ZON2008-000 18 BUTLER I FUTURE B
Tax Map 17-03-24-31, Tax Lot 2000,2778 19th Street
Listed below are oW" comments for the above referenced develvpwent proposal.
1. The proposed development IS WIthtn the Spnngfield CIty limIts and will receIve water semce
from the SprIngfield Utlhty Board (SUB). For tlus subdiVIsIon, the waterline at 19th Street and
Yolanda Avenue wIll need to be tapped and extended WIth an 8" water mam up 19th Street. The
6" waterhne ill Vera Street WIll also need to be extended to 19th Street.
2. All new water system faclhtIes and modifications to water system facIhties both mSlde and
adjacent to the proposed development shall be placed in street nght-of-way at a location and
depth of bury that meets the standards of the SUB Water DIVIsion.
3. All water facility materials shall be to a standard that must meet SUB Water DIVIsion
speCIfications.
A. All workmanship shall be performed to meet or exceed SUB Water DIVIsion constructlon
standards.
5. Size ofwaterlme and other facIlItIes, including water meters, must meet the needs of the SUB
Water DIVIsion and the long-range needs of the CIty. These needs mclude, but are not hrruted to,
meter locatIon and access, SIzes of water distrIbutIon and transmission lines, pumping facilities,
and commUnicatIOn lines
6. Please ask the developer to contact the SUB Water DiVISIon for detalled mfonnatlon on the
matenals and constructIOn standards, detailed costs for InstallIng SUB water facIhnes, and a
schedule of constructIon. ConstructIon expenses may be reduced WIth good plannmg of requrred
water facIlItIes, good tIming of facIhtles mstall(itIon, and joint trench opportumtles.
7. All water meters will be placed In public nght-of-way at a locatIon identlfied by the developer.
Each lot or parcel must have Its own water ServIce.
S'\SITEPLAN\2778 19th St Jackson SubdlVlslon development Issues 4-30-08.docx
l)Q(~ Nt:iCt:ljved"
Planner: Al
If jJtJ/.1fJ6/
I 04/30/2008 11:53 FAX 7477348
WSC FAX
~ 002/002
8. Water servIce facilItIes will be mstalled upon collection of development charges. Development
polICIes and charges identified m tlns letter are subject to change. Actual charges WIll be those in
effect at the time water servIce IS requested.
9. Spnngfield has several wellhead protectIon areas. Nmety percent of Spnngfield's drinking water
comes from wells. In every mstance, care shall be taken to prevent groundwater contamInatIon.
Contractors/developers/owners shall be responsIble for the safe handhng and storage of
chenucals, petroleum products, fertllizers, and the prevention of groundwater and storm water
runoff contamInatIon.
SpeCIal reqUIrements may be necessary for groundwater protection at tlus development. Contact
Amy Chinitz at Spnngfield UtIlity Board Water Division for detaIls at 726-2396.
PLEASE NOTE:
SUB development charges are paId drrectly to SUB Water DIVISIon and
SUB ElectrIc Division.
sm~ zyk
Rebecca Templin, P .E.
Water Engmeenng SupervJ.sor - Water DiviSIon
RA T:mk
cc: Mike Butler, Future B Homes, P.O. Box 7425, Eugene, Oregon 97401
Dan Jackson, 2778 19th Street, Springfield, Oregon 97477
James Branch, Branch Engmeenng, Inc., 310 FIfth Street, Springfield, Oregon 97477
S \S11 ~rLAN\2778 ) 9th St Jackson SubdtvlslOn development tssues 4-30-08 docx
Date ~ecelved: '1/J~/ltJ"J
Planner: AI.. '