HomeMy WebLinkAboutComments SUB 5/5/2008
0;
SPRINGFIELD UTILITY BOARD
WATER SERVICE CENTER 202 South 18th Street Spnngf,eld, OR 9747715240 Tel 541 7262396 Fax 5417477348 www subutd com
May 5, 2008
Andy LImbIrd
City of Spnngfield
225 N 5th Street
Spnngfield, OR 97477
Dear Andy
SUBJECT
DEVELOPMENT ISSUES #ZON2008=OOO 19 McELHANY/GOLDEN/GALCERAN
Tax Map 17-03-25-12, Tax Lots 7900,8000,8100 &
Tax Map 17-03-24-43, Tax Lot 2100,2407 19th Street & vacant lots, Otto Court Subd.
LIsted below are our comments for the above referenced development proposal'
1 The proposed development IS currently wIthm the servIce temtory of the Rambow Water DIstrIct
and wIll be served by RWD untIl the flfSt day of the July followmg annexatIOn to the City of
Spnngfield, at whIch tIme SUB WIll become the water1servlCe provIder
2 All tie.w water' system facIlItIes and modIficatIOns to water system facIlItIes both mSIde and
adjacent to the proposed development shall be placed m street nght-of-way at a'locatIO,ll and
depth of bury that meets the standards of the SUB Water DIvIsIOn
3 All water facIlIty matenals shall be to a standard that must meet SUB Water DlVlsIOn
specIficatIons
4 All workmanshIp shall be performed to meet or exceed SUB Water DIVISIOn constructIOn
standards.
5 SIze of waterlme and other facIlItIes, mcludmg water meters, must meet the needs of the SUB
Water DIVIsIOn and the long-range needs of the CIty These needs mclude, but are not lImIted to,
meter locatIOn and access, SIzes of water dIstrIbutIon and transmISSIOn lmes, pumpmg facIlItIes,
and commumcatIOn lmes.
6 Please ask the developer to contact the SUB Water DIVIsIOn for detaIled mformatIOn on the
matenals and constructIOn standards, detailed costs for mstallIng SUB water faCilItIes, and a
schedule of constructIOn. ConstructIOn expenses may be reduced wIth good plannmg of reqmred
water faCIlItIes, good tImmg of faCIlItIes mstallatIOn, and Jomt trench opportumtIes.
7 All water-meters wIll be placed m publIc nght-of-way at a locatIon IdentIfied b}!,the developer
Each'lot or parcel must have ItS own wat~r servIce I I . '", "
S \SITEPLAN\2407 19th Street development Issues 5-5-08 docx
/
I
Date ReceiVed:
Planner: Al
r/tJtxJf
/ I
8 Water serVIce facIlItIes wIll be Installed upon collectIOn of development charges Development
polICIes and charges IdentIfied In thIS letter are subject to change Actual charges WIll be those In
effect at the tIme water serVIce IS requested
9
Spnngfield has several wellhead protectIOn areas NInety percent of Spnngfield's dnnkIng water
comes from wells In every Instance, care shall be taken to prevent groundwater contamInatIOn
Contractors/developers/owners shall be responsIble for the safe handlIng and storage of
chemIcals, petroleum products, fertIlIzers, and the preventIOn of groundwater and storm water
runoff contamInatIOn
';
SpeCIal reqUIrements may be necessary for groundwater protectIOn at thIS development. Contact
Amy ChImtz at Spnngfield UtIlIty Board Water DlVlslOn for detaIls at 726-2396
PLEASE NOTE:
SUB development charges are paId dIrectly to SUB Water DIVISIOn and
SUB ElectrIC DIVISIOn
SIncerely,
~ /- ~~
Rebecca TemplIn, P E.
Water EngIneenng SuperVIsor - Water DIVISIOn
RAT mk
cc Earl McElhany, 975 WIllagIllespIe Road, Eugene, Oregon 97401
RIchard & Sandra Golden, 2355 19th Street, Spnngfield, Oregon 97477
Ron & Karen Galceran, 2264 33rd Street, Spnngfield, Oregon 97477
S \SITEPLAN\2407 19th Street development Issues 5-5-08 docx
Date Received:-1:~o~L-_.
Planner: AL