HomeMy WebLinkAboutPermit Miscellaneous 1989-10-17
-.
(0
DEVELOPMENT SERVICES
ADMINISTRATION
PLANNING / BUILDING
PUBLiC WORKS
METROPOLiTAN WASTEWATER MANAGEMENT
225 FIFTH STREET
SPRINGFIELD, OR 9i4ii
(503) 726-3753
.lu..:. ~.Jo"::.:l.:::t'1l>........;
Mr. Vernon Swenson- '~'.. .
1045 North Old Stage'Road .-
Mt. Shasta, CA 96067
V-J !.J~J-~:;;r:;4~ &.....
\.f.- -. "-
;:;>~.i.,;.-_ ....~~_____
C~~~:'ED.~~TT~.;;~
October 17, 1989
_ _ J __oJ
--:.....:-,-...
Re: Vatson Type I Site Plan (Journal No. 89-07-122) - Located at III Main Street in
Springfield, Oregon.
Dear Hr. Swenson,
'Yesterday, Greg Vinterowd, the Development Services Director, and I met with Raelynn
Veiseth of the Springfield Downtown Association in order to 'determine what is
required to obtain final site plan approval. Raelynn has agreed to work on behalf of
you and Hr. Vatson. This letter is addressed to you s~nce,You are the property owner
and must sign required-documents discussed'-in this -let tel'. .
Three items must be completed.
1. PREPARATION OF A FINAL SITE PLAN SHOVING THE FOLLOVING INFORMATION:
~ The "namesJ.o,fG aoH, .J abuUing;stree ts j>1exiS tiilg"'sldewalks ahd planterWs fd'p's ,~~"
alleys and curb cuts (driveways) to include their dimensions.
:U'~..
b.
The individual property lines
square footage of tax lot 6100.
for tax lots
6100 and 6101,
to include the
c. The existing building and its dimensions.
d. The location of catch basins.
e.
Four parking-stalls in the northeast corner of the
wheel stops and dimensions.
- ".-...-,
property,' to
ibclude ~
,
f.
The location of bollards (at 5' intervals) along the southwest property line
of tax lot 6100.
__:..._:................~ ;..,.~...+~~~ ~lor+..,.,.T....,n?
rf"Q-:;O:J'-4~ n:rJ)...l:l;J::')
- g.
A landscape ,plan prepared by a nursery 'person in-'"accordam:'e- wi th--'th'i!" ,-----,
requirements of the Springfield Development Code, Sections 31.140,.31.150 and"
32.050 and the Standard Construction Standards. "The landscape pla'n must s'how'
the following information:
(1) A 30' x 4' landscaped strip along the north property line (Hain Street).
fit
-
Page 2
Swenson
(2) Replacement of street trees in the planter strip along Mill Street.
(3) A 4 foot landscaped strip to include trees 20' on center and 2" caliper
behind the bollards along the southwest property line. An extra 160
,square feet of landscaping forming a triangular area'between the south
-bui~ding line and the landscape strip is needed to compensate for
landscaping lost where required parking has been placed along Main
Street.
(4) An 18' x 4' landscaped strip at the southeast corner of the property.
(5) An irrigation plan.
2. A SIGNED IMPROVEMENT AGREEMENT FOR THE ALLEY. A deed showing the legal
description of tax lot 6100 (111 Main Street) is needed in order to prepare the
improvement agreement. The document will then be sent to you for your signature.
There is a $15.00 recording fee, please make your check payable to Lane County.
,3.. , A SIGNED ,DEVELOPMENT AGREEMENT.
the site plan_discussed above.
signature.
This agreement will_be_prepared.upon approval of
This document-will_then_ be-sent. to you for your
Raelynn stated she will submit the site plan to the City by October 25. All required
impro:~.~I1IE!.!:!lll. ,!!!1lsJ._~~!.nstal1~d....: an.d ..the documents discussed in 2. and 3. above
received by the City by November 17, 1989. These dates are the final time lines
allowed- for ,this- proposal. ~If -items-required-in-"this" letter are not completed by
these dates, this issue will be sent to the City's Code Enforcement Officer to be
processed as a civil infraction.
If you have any questions, please call me at '(503)0726=3777;
Thank you very much for your assistance in this matter.
Sincerely),,-- ~ ~
~,..
Associate Planner
cc: Greg Vinterowd,Development Services Director
Raelynn Veiseth, Springfield Downtown'Association
____Jackie Murdoch,.Code-EnforcementvOff~cer~-- .~=L_ Qn~~ha~~ ~~
.
.,
~ .11~1. It ?IH:l.'.:.l-~:'~ ,,:=-:.H..!J -,nirl;tUv:,,:;>.,~'.i,oS-::>'~,.....~u..~,-,:,,,,.__....; -... _.....J_....._....i-.;._._--