HomeMy WebLinkAboutPermit Signage 1999-5-24
~.=:.--;::-.~
SIGN PERMIT APPLlCATIOit
225 Fifth,Street
Springfield, OR 97477
SPRINGFIELD
JO.MBER 0'1001.0"4- Q11Y#1
Inspectioo Line: 726-3769
Office: 726.3759
SITE ADDRESS:
ASSESSORS MAP:
I 1';=1_
TAX LOT: , _.0 :2.~~
PHONE: 64/ - 74/ - Jqr., ,
ZIP: Cf7<..f7i
DESCRIPTION OF PROPOSEO SIGN{S): (please check and complete all appropriate information)
~Wall
Freestanding
_ Projectiog
Roof
Marquee
~ Single Face
Double Face
Billboard
Other
Square Footage:
,~'
Total Height above Grade:
Vertical Dimension of sign or enclosure:
J ('f
Horizontal Width of sign or enclosure:
Dimension from Grade
to bottom of Sign Enclosure:
STATE:
DR-
ZIP:
Cf7~OL
U /h /2-000
?'/(rl /~J 00
EXPIRES:
CITY BUSINESS LICENSE NUMBER:
Of 6 63g"/
EXPIRES:
OFFICE USE
Sign District: ~A..L'. DFC,<'-.L-
Zoning: (jO
Sign Permit Fee: .$' 40. -
Code Section:
530-0
r.~k! ...j.
+e,,,
o
Quad Area:
(1-..)
\.)i~
I Cold tA..:J
Land Use:
Approved By:
DATE: C; -let, -C1 t;
REOUIRED INSPECTIONS:
Site
to be made prior
to sigo placemeot
Footing
prior to placement
of concrete
'/Attachment
after fasteners are
installed/prior to cover
/Electrical
prior to energizing
electrical installation
/Fioal
completion of sign
installation
Additional Comments and/or Conditions:
By signature, I state aod agree, that I have ctefUIlY examined the completed application and do hereby certify that all information herein
is true and correct, and I further certify that ~ny and all work performed shall be done in accordance wiih the Ordinances of the City of
Springfield, and the Laws of the State of Or~gon pertaining to the work described herein. I further certify that only contractors and
employees who are in compliance with ORS 701.055 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the street, that
the permit card is located at the front of the property, aod the approved set of plans will remain on the site at all times during the installation
of Ihe signls). () ,
'~gnature f?t7P~ <T. b__ ~ Date 5k;,~/Qc,
(I
Validation: Amount Received: -:1J, 40 . Date Paid: c:: -,;)tL _ q 9
Receipt Number: 31-{ , (. '1 Received By: -4::i...u
'\
.'
"-~
.'4l::( ~.
'\' . SIGN. PERMIT APPLICATION
Or"~
--
The application on the reverse side needs to be completed entirely. If vqu are the,sign contractor/installer, or if you are
hiring a contractor, you need to make sure that both the City of Springfield Business License Number and the Registration
Numbe~ from the State of Oregon Construction Contractors ,Board are listed on the application along with the expiration
date of each.
If the sign you are proposing to iostall is illuminated, an electrical permit application also needs to be completed and signed
by either a supervising electrician, Iiniited sign electrical contractor, or if you are the business owner who also owns the
building io which you are occupying, and you will be performing the electrical installation yourself, you may sign the
electrical application.
If there are existing wall and/or freestanding sigos, a photogreph(s) of each existing slgo needs to be attached to the
application. The size of each existing sign also needs to be listed on the application.
PLANS
To submit for a sign permit, you need to prepare two complete sets of drawiogs showiog all dimensions, total height, and
a plot plan indicating where the proposed sign will be located. If you are installing a freestanding sign which exceeds 20
feet in total height, the footiog detail needs to be prepared and stamped by a registered engineer or architect. After the
plan review process is completed, and, if your sign(s) is approved, one set. of plans will be returned to you. The approved
set of drawings need to be at the site when an inspection is requested for the inspectors reference.
INSPECTIONS
Depending on your sign(s), you may be required to request one or all of the following inspections duriog the installation
of your sign: '
Site:
To be requested after indicating on the lot where the proposed sign will be located but prior to any work
being performed for the installation of the sign. This inspection is required if there is a question on the
location of the proposed sign. .
Footing:
To be requested after excavation and the forms are installed, but prior to pouring concrete. If there will be
electrical conduit placed in the footing, it must 'also be in 'place prior to requesting this inspection.
Attachment: To be requested when all fasteners are installed but prior to cover.
Electrical:
"
To be requested after the electrical connection to the sign,is mad~, but prior to energizing. .
\ .
, '.
: Final: .
After all required I~spections are conducted and approved and the sign installation is complete.
~, . ~. ... :
The iri'spections ,that a;e req~ired for your sign installation will be indicated on the application during the plan .review, '
process. Failure to request;~NY of the required inspections. could result in sign{emoyal,in order to inspect the sign at ilie:'
required intervals of work. . , III \ '~! _I I, ...J:" ~
To request ao inspection, phone 726-3769. This is a 24 hour recording. On th~ recording YOU'Will need to'leave y'ourCity
Designated Job Number, location of where the 'sign is being installed, the type of inspection you are requesting, and when
you will be ready for the inspection: All Inspections called In to the recorder'prior to 7:00. a.m. will be made"{hi'sanie
working day, all inspecti~ns'phoned.in after 7:00 a.m. will be'made the following work day. 1.',-.. '.: ;,' ".: ,i.:':
T
If you have any questions regarding the application, required plans or inspections, please feel free to phone the Building
Safety Division at 726'3~59.,: '.' .,., '. '.:.:., ", .,.. ':'. '. . .
. ..'~.; ..}"h If . :.f ...::: I;~ '. ".
,
"
'.
- ----...--.
, .
:,
City of Springfield
Building Safety Division
225 Fifth Street
Springfiel~, OR 97477
" :
.,
"
:' .:
.
-
'.
. .
1"- H.'
. '.
, ..
,., .
~.
.'
.
.
i
i
I
i'
'1
...-
--