Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 1987-5-19 .INS?ECTION REPORT CLIENT: PROJECT: LOCATION: . BROS. INC. Foundation Hills Subdivision . Job No. 87-2935 Date: May 19, 1987 BREEDEN Lot 54 River . WEATHER: Cloudy, warm WORKMEN ON JOB: None (after work) ADDRESS: 582 Gr~nite.?lace. Backfill completed for footing bearing. Material is compacted to non-yielding density acceptable for support of footings. Excavated material removed resembles. the surface CH clay material. Lot slopes to the west with cut depth located at east wall and fill area located at we$t.wall. Backfill is topped wih crushed rock material for levelling prior to footing construction. The methods and details conform to the original recommend~tions noted in our letter of July 26, 1978 with the conclusions reached with J. Q. Tomkins, Engineering Geologist. One area of concern is the finish grade slope at the west footing to the property line which could result in a steep surface. The base of footing bearing is above adjacent grade and should be protected from possible future erosion. INSPECTOR: . EHSjll ~ (. '- Schaudt, Stemm & Wild, Ine. CONSULTING ENGINEERS. SURVEYORS AND PLANNERS . 503/485.8383 . 388 High Street. ~ '. . I, .( \ i. '~:. - ... Eugene, Oregon 9740] .J