HomeMy WebLinkAboutPermit Building 2004-6-17
.
. Ul i' OF SPRINGFIELD
Building/Combination Permit
PERMIT NO: cOM2004-00603
ISSUED: 06/17/2004
APPLIED: OS/20/2004
EXPIRES: 12/17/2004
VALUE: $ 23,574,00
Status
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
SITE ADDRESS: 2300 HENDERSON AVE
ASSESSOR'S PARCEL NO.: 1803032000600
Eugene
TYPE OF WORK: Storage Building
TYPE OF USE:
Industrial
PROJECT DESCRIPTION: Equipment storage building
Owner: PETERSON MACHINERY COMPANY INC
Address: 2300 HENDERSON AVENUE EUGENE OR 97405
Phone Number: 541-465-8406
I CONTRACTOR INFORMATION I
Contractor Type
Architect
General
Contractor
ERIC HALL ARCHITECTS, INC.
1996 LLC
L,icense
Expiration Date Phone
541-688-5594
05/30/2007 541-687-9445
,
114258
, BUILDING INFORMATION I
#ofUn;ts: #of . ,,\l.~
Primary Occupancy Group: S-3 ~\l'Ilft~~
Secondary Occupancy Grou~: -' ~'\'5ljle C, t'il@\~;
Primary Construction TYP~~ ~r ~~ ~
SecondaryConslructionTy~ ~ =5 ~ \f~',~
# of Bedrooms: ~I'f\'\~ ~P8~~.\~
~--=..~ ~d'~~'~n nfa
...~::-.d'J~k '_....~_.....;..
-~~~r:; " - , ,~,<,-u.~DRMATION I
~tJ .~.
~ Overlay Dist:
# Slreel Trees Rqd:
Paved Drive Rqd:
% of Lot Coverage:
I
16.00
Lot Size:
Sq Ft 1st Floor: 800
Sq Ft 2nd Floor:
Sq Ft Basement:
Sq Ft Garage/Carport
Sq Ft Other:
Occupant Load:
Frontyard Setback:
Side I Setback:
Side 2 Setback:
Rearyard Setback:
Solar Setbacks:
REQUIRED PARKING
Total:
Handicapped:
Compact:
Description
Type of Construction
~~l.
~\. ~ ~~,
Sidewalk 1lv~: o*-, \~ d
~~YiJ,~'" (,.~"
:~.:~.,:\~~ ~~~
~\~~. ~,~\)~<;)~~ ~,o:~
'\~~~~~~~<;) <;)~~<;)<;),
"~I, vJ~"
I r": ~I'V V"
Valuation DescriD~ \~~
, G.\"
$ Per Sq Ft Square Footage
or multiplier or Bid Amount
Value
Date Calculated
I PUBLIC IMPROVEMENTS I
Street Improvements:
Storm Sewer Available:
Special Instruction:
Notes:
Page 1 of3
. Ll1 t' OF SPRINuI<lJj,LlJ
Building/Combination Permit
PERMIT NO: cOM2004-00603
ISSUED: 06/17/2004
APPLIED: 05120/2004
EXPIRES: 12/17/2004
VALUE: $ 23,574.00 .
.
Status
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
Estimate
Paving
Estimate
Use Bid Amount
$1.00
$1.00
22,424.00
1,150.00
Total Value of Project
L.Fpp. P..W
$22,424,00
$1,150,00
$23,574.00
06/11/2004
0611112004
Fee Description Amount Paid Date Paid Receipl Number
Plan Review Comm/Ind/Public $100.23 5/20/04 2200400000000000617
+ 10% Administrative Fee $25.38 6/17/04 1200400000000000924
+ 7% State Surcharge $14,62 6/17/04 1200400000000000924
Building Permit $208.80 6/17/04 1200400000000000924
Paving $45,00 6/17/04 1200400000000000924
Plan Review - Planning $71.00 6/17/04 1200400000000000924
Plan Review Comm/Ind/Public $40.56 6/17/04 1200400000000000924
Plan Review Fire & Life Safety $86.64 6/17104 1200400000000000924
SDC MWMC Administration $10.00 6/17/04 1200400000000000924
SDC MWMC Improvement $48.97 6/17/04 1200400000000000924
SDC MWMC Reimbursement $71,92 6/17/04 1200400000000000924
SDC SanitarylStorm Admin $14.20 6/17/04 1200400000000000924
SDC Transpo Admin $21.52 6/17/04 1200400000000000924
SDC Transpo Improvement $286.53 6/17/04 1200400000000000924
SDC Transpo Reimbursement $64,95 6/17/04 1200400000000000924
Storm Drainage Impervious Area $232,00 6/17/04 1200400000000000924
Total Amount Paid $1,342.32
I Plan Reviews I
Fire Department Review
05/25/2004
05/26/2004
OK GRG'
Initial Review
Planning Review
05/21/2004
05/25/2004
05/21/2004
05/26/2004
APP LLH
APP EMM
Public Works Review
05/25/2004
05/25/2004
APP SO
Structural Review
OS/21/2004
05/25/2004
WE JMP
Page 2 of3
See attached document for fire
department plan review comments.
Approved by Mel Oberst with no
planning application required.
Building to be built over an existing
pad of equipment.
SDCs added, Downspouts must be
PIPED to adjacent storm sewer, not
splash blocked. SWBB
Received 5/25/2004, See attached
fax sent to Ted Corbin requesting
special inspection forms and missing
information. 5/27/2004 Met with
Dave Hoffman and received forms
and letter stating that there will be
no deferred submittals. Faxed
energy code forms to Jack Foster for
approval. Still waiting on written
verification of cost/value.
.
. CITY OF ~rKlNGFIELD
Building/Combination Permit
PERMIT NO: cOM2004-00603
ISSUED: 06/1712004
APPLIED: 05120/2004
EXPIRES: 12/17/2004
VALUE: $ 23,574.00
Status
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
Structural Review
06/11/2004
06/11/2004
APP JMP
Received fax from Dave Hoffman
with Chambers Budget Proposal.
Had to adjust all fees. Called Dave
for pickup witb fees and counter
bours,
No energy code issues, no
inspections.
SUB Review
05/25/2004
06/0112004
APP JF
To Request an inspection call the 24 hour recording at 726-3769. All inspection requested before 7:00 a.m.
will be made the same working day, inspections requested after 7:00 a.m. will be made the following work
day,
Ufer Electrical Ground: Install ground rod at footing and call for inspection in conjunction with footing and/or
foundation Inspection.
Footing: After trenches are excavaled,
Slab: To he made after all inslab building service equipment, conduit piping and other equipment items are in
place but prior to concrete,
Framing Inspection: Prior to cover and after all rough in inspections have been approved,
Roofing: Prior to installing any roof covering.
Bolts Installed In Concrete: To be done by a State Certified Special Inspector. Provide inspection test reports to
City Building Inspector.
High Strength Bolting: To be done during construction by a State Certified Special Inspector. Provide Inspection
results to City Building Inspector.
Final Fire Department. After all requirements of the Fire Department have been met.
Final Building: After all required inspections have been requested and approved and the building is complete.
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all
Information hereon Is true and correct, and I further certify that any and all work performed shall be done in accordance with
the Ordinances of the City of Springfield and tbe Laws of the State of Oregon pertaining to the work described herein, and
that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety.
I further certify that only contractors and employees who are in compliance with ORS 701.005 will be used on this project.
I further agree to ensure that all required Inspections are requested at the proper time, that each address Is readable from the
street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all
times during construction.
~':D P W-t ( __
O~er or Contractor~re
b-(,-oL{.
Date
Page 3 of3
225 Fifth Street
Springfield, Oregon 97477
\ 541-726-3759 Phone
.
8!"'1~. NG!'~ ','..,_:
WiL .,.
I
,
-.-. '
JiijJy of Springfield Official Receipt
.velopment Services Department
Public Works Department
Job/Journai Number
COM2004-00603
COM2004-00603
COM2004-00603
COM2004-00603
COM2004-00603
COM2004-00603
COM2004-00603
COM2004-00603
COM2004-00603
COM2004-00603
COM2004-00603
COM2004-00603
; COM2004-00603
COM2004-00603
COM2004-00603
Payments:
Type or Payment,
CredilCard
6/17/2004
RECEIPT #:
1200400000000000924
Date: 06/17/2004
Descrlpllon
+ 10% Administralive Fee
Plan Review - Planning
Storm Drainage Impervious Area
SDC Transpo Reimbursemenl
SDC Transpo Improvemenl
SDC MWMC Reimbursemenl
SDC MWMC Improvemenl
SDC MWMC Administralion
SDC Sanitary/Slorm Admin
SDC Transpo Admin
Plan Review Comrn/IndlPublic
Plan Review Fire & Life Safely
Building Permit
Paving
+ 7% State Surcharge
Paid By
DAVID HOFFMAN
lIem Totai:
Check Number Authorization
Received By Batch Number Number How Received
djb 000413 004708 In Person
Payment Total:
Page I ofl
9:45:35AM
Amount Due
25.38
71.00
232,00
64,95
286,53
71.92
48,97
10,00
14,20
21.52
40,56
86,64
208,80
45,00
14,62
$1,242,09
Amount Paid
$1,242,09
$1,242.09
A AlTACHMENTA
, ' . CITY ~GFIELD SYSTEMS DEVELOPMENT CHARGE .SHEET
JOURNAL OR JOB NUMBER COM2004-00603
NAME OR COMPANY: PETERSON MACHINERY
LOCATION: 2300 HENDERSON AVE
MAP & TAX LOT NUMBER: 18 03 03 20 00600 '
DEVELOPMENT TYPE: NEW BI.JlLER STORAGE BLOO
NEW DEVELOPED AREA (S,F,): 800,00
EXISTING DEVELOPED AREA (S,F,):
TOTAL IMPERVIOUS SURFACE (S,F,):
ITE:
ITE:
LOT SIZE (S,F,):
150
o
,1 STORM ~Q.AINAGE
IMPERVIOUS SQ, FT,
x
$ 0,290 PER SF
TOTAL STORM DRAINAGE SDq $ 232,00 1070
800
2 SANITARY SFWFR-CITY
A, REIMBURSEMENT COST:
NUMBER OF DFU's 0
B. IMPROVEMENT COST:
NUMBER OF DFU's 0
(SEE REVERSE SIDE)
.
;l 2
...
~.~.S'
,::~oo.~
.
.
~ m
la
x $ 22,64 PER DFU , $ I $ 1091
x $ 17.21 PER DFU , $ I $ 1092
TOTAL WCAL W ASTEW A TER SOC:' $
3 TRANSPORTATION
BLOO AREA TGSF x TRIP RATE x COST PER ADT x NEW TRIP FACTOR
NEW
A. REIMBURSEMENT COST:
0,800 x 4,96 x $ 17.23 PER TRIP x 0,95 NTF 1$ 64,95 I
B. IMPROVEMENT COST:
0,800 x 4,96 x $ 76,01 PER TRIP x 0,95 NTF 1$ 286,53 I
EXISTING
A. REIMBURSEMENT COST:
0,000 x 0 x $ 17.23 PER TRIP x 0 NTF 1$
B. IMPROVEMENT COST:
0,000 x 0 x $ 76,0\ PER TRIP x 0 NTF 1$
TOTAL TRANSPORTATION REIMBURSEMENT SIX:' $
TOTAL TRANSPORTATION IMPROVEMENT SIX:' $
$
TOTAL TRANSPORTATION SOC:' $ 351,481
64,95 1093
286,53 1094
351,48
4 SANITARY SEWER - MWMC
NEW:
A. REIMBURSEMENT COST:
NUMBER OF FEU's 0,800 x $89,89 PER FEU 1$
B, IMPROVEMENT COST:
NUMBER OF FEU's 0,800 x $61.21 PER FEU 1$
EXISTING:
A. REIMBURSEMENT COST:
NUMBER OF FElYs 0,000 x $0,00 PER FEU 1$
B, IMPROVEMENT COST:
NUMBER OF FElYs 0,000 x SO,OO PER FEU 1$
MWMC CREDIT IF APPLICABLE (SEE REVERSE)
71,92 I
48,97 I
I
$
TOTAL MWMC REIMBURSEMENT FEE: $
TOTAL MWMC IMPROVEMENT FEE: $
MWMC ADMINISTRATIVE FEE: $
, TOTALMWMCSOC:I $ 130,89 ~
SUBTOTAL (ADD ITEMS 1,2,3, & 4) I $ 714,37 ~
5 ADMINISTRATIVE FEES:
BASE CHARGE (SUBTOTAL ABOVE)
$
714.37 x 5% $ 35,72
TOTAL TRANSPORTATION ADMINISTRATION FEE:' $
TOTAL SEWER ADMINISTRATION FEE:1 $
1054
71.92 1054
48,97 1055
10.00 1056
21,52 1078
14.20 1079
steve"" W, lSeoL<drl:j lSor"'-<S 5/25/2004
C(j~~I\sON MACHINERY, 231)Q HEN~mN,xls
TOTAL SOC CHARGES
, $
750,09 I
JULY 2001