Loading...
HomeMy WebLinkAboutPermit Building 2004-6-17 . . Ul i' OF SPRINGFIELD Building/Combination Permit PERMIT NO: cOM2004-00603 ISSUED: 06/17/2004 APPLIED: OS/20/2004 EXPIRES: 12/17/2004 VALUE: $ 23,574,00 Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line SITE ADDRESS: 2300 HENDERSON AVE ASSESSOR'S PARCEL NO.: 1803032000600 Eugene TYPE OF WORK: Storage Building TYPE OF USE: Industrial PROJECT DESCRIPTION: Equipment storage building Owner: PETERSON MACHINERY COMPANY INC Address: 2300 HENDERSON AVENUE EUGENE OR 97405 Phone Number: 541-465-8406 I CONTRACTOR INFORMATION I Contractor Type Architect General Contractor ERIC HALL ARCHITECTS, INC. 1996 LLC L,icense Expiration Date Phone 541-688-5594 05/30/2007 541-687-9445 , 114258 , BUILDING INFORMATION I #ofUn;ts: #of . ,,\l.~ Primary Occupancy Group: S-3 ~\l'Ilft~~ Secondary Occupancy Grou~: -' ~'\'5ljle C, t'il@\~; Primary Construction TYP~~ ~r ~~ ~ SecondaryConslructionTy~ ~ =5 ~ \f~',~ # of Bedrooms: ~I'f\'\~ ~P8~~.\~ ~--=..~ ~d'~~'~n nfa ...~::-.d'J~k '_....~_.....;.. -~~~r:; " - , ,~,<,-u.~DRMATION I ~tJ .~. ~ Overlay Dist: # Slreel Trees Rqd: Paved Drive Rqd: % of Lot Coverage: I 16.00 Lot Size: Sq Ft 1st Floor: 800 Sq Ft 2nd Floor: Sq Ft Basement: Sq Ft Garage/Carport Sq Ft Other: Occupant Load: Frontyard Setback: Side I Setback: Side 2 Setback: Rearyard Setback: Solar Setbacks: REQUIRED PARKING Total: Handicapped: Compact: Description Type of Construction ~~l. ~\. ~ ~~, Sidewalk 1lv~: o*-, \~ d ~~YiJ,~'" (,.~" :~.:~.,:\~~ ~~~ ~\~~. ~,~\)~<;)~~ ~,o:~ '\~~~~~~~<;) <;)~~<;)<;), "~I, vJ~" I r": ~I'V V" Valuation DescriD~ \~~ , G.\" $ Per Sq Ft Square Footage or multiplier or Bid Amount Value Date Calculated I PUBLIC IMPROVEMENTS I Street Improvements: Storm Sewer Available: Special Instruction: Notes: Page 1 of3 . Ll1 t' OF SPRINuI<lJj,LlJ Building/Combination Permit PERMIT NO: cOM2004-00603 ISSUED: 06/17/2004 APPLIED: 05120/2004 EXPIRES: 12/17/2004 VALUE: $ 23,574.00 . . Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line Estimate Paving Estimate Use Bid Amount $1.00 $1.00 22,424.00 1,150.00 Total Value of Project L.Fpp. P..W $22,424,00 $1,150,00 $23,574.00 06/11/2004 0611112004 Fee Description Amount Paid Date Paid Receipl Number Plan Review Comm/Ind/Public $100.23 5/20/04 2200400000000000617 + 10% Administrative Fee $25.38 6/17/04 1200400000000000924 + 7% State Surcharge $14,62 6/17/04 1200400000000000924 Building Permit $208.80 6/17/04 1200400000000000924 Paving $45,00 6/17/04 1200400000000000924 Plan Review - Planning $71.00 6/17/04 1200400000000000924 Plan Review Comm/Ind/Public $40.56 6/17/04 1200400000000000924 Plan Review Fire & Life Safety $86.64 6/17104 1200400000000000924 SDC MWMC Administration $10.00 6/17/04 1200400000000000924 SDC MWMC Improvement $48.97 6/17/04 1200400000000000924 SDC MWMC Reimbursement $71,92 6/17/04 1200400000000000924 SDC SanitarylStorm Admin $14.20 6/17/04 1200400000000000924 SDC Transpo Admin $21.52 6/17/04 1200400000000000924 SDC Transpo Improvement $286.53 6/17/04 1200400000000000924 SDC Transpo Reimbursement $64,95 6/17/04 1200400000000000924 Storm Drainage Impervious Area $232,00 6/17/04 1200400000000000924 Total Amount Paid $1,342.32 I Plan Reviews I Fire Department Review 05/25/2004 05/26/2004 OK GRG' Initial Review Planning Review 05/21/2004 05/25/2004 05/21/2004 05/26/2004 APP LLH APP EMM Public Works Review 05/25/2004 05/25/2004 APP SO Structural Review OS/21/2004 05/25/2004 WE JMP Page 2 of3 See attached document for fire department plan review comments. Approved by Mel Oberst with no planning application required. Building to be built over an existing pad of equipment. SDCs added, Downspouts must be PIPED to adjacent storm sewer, not splash blocked. SWBB Received 5/25/2004, See attached fax sent to Ted Corbin requesting special inspection forms and missing information. 5/27/2004 Met with Dave Hoffman and received forms and letter stating that there will be no deferred submittals. Faxed energy code forms to Jack Foster for approval. Still waiting on written verification of cost/value. . . CITY OF ~rKlNGFIELD Building/Combination Permit PERMIT NO: cOM2004-00603 ISSUED: 06/1712004 APPLIED: 05120/2004 EXPIRES: 12/17/2004 VALUE: $ 23,574.00 Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line Structural Review 06/11/2004 06/11/2004 APP JMP Received fax from Dave Hoffman with Chambers Budget Proposal. Had to adjust all fees. Called Dave for pickup witb fees and counter bours, No energy code issues, no inspections. SUB Review 05/25/2004 06/0112004 APP JF To Request an inspection call the 24 hour recording at 726-3769. All inspection requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following work day, Ufer Electrical Ground: Install ground rod at footing and call for inspection in conjunction with footing and/or foundation Inspection. Footing: After trenches are excavaled, Slab: To he made after all inslab building service equipment, conduit piping and other equipment items are in place but prior to concrete, Framing Inspection: Prior to cover and after all rough in inspections have been approved, Roofing: Prior to installing any roof covering. Bolts Installed In Concrete: To be done by a State Certified Special Inspector. Provide inspection test reports to City Building Inspector. High Strength Bolting: To be done during construction by a State Certified Special Inspector. Provide Inspection results to City Building Inspector. Final Fire Department. After all requirements of the Fire Department have been met. Final Building: After all required inspections have been requested and approved and the building is complete. By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all Information hereon Is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and tbe Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.005 will be used on this project. I further agree to ensure that all required Inspections are requested at the proper time, that each address Is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. ~':D P W-t ( __ O~er or Contractor~re b-(,-oL{. Date Page 3 of3 225 Fifth Street Springfield, Oregon 97477 \ 541-726-3759 Phone . 8!"'1~. NG!'~ ','..,_: WiL .,. I , -.-. ' JiijJy of Springfield Official Receipt .velopment Services Department Public Works Department Job/Journai Number COM2004-00603 COM2004-00603 COM2004-00603 COM2004-00603 COM2004-00603 COM2004-00603 COM2004-00603 COM2004-00603 COM2004-00603 COM2004-00603 COM2004-00603 COM2004-00603 ; COM2004-00603 COM2004-00603 COM2004-00603 Payments: Type or Payment, CredilCard 6/17/2004 RECEIPT #: 1200400000000000924 Date: 06/17/2004 Descrlpllon + 10% Administralive Fee Plan Review - Planning Storm Drainage Impervious Area SDC Transpo Reimbursemenl SDC Transpo Improvemenl SDC MWMC Reimbursemenl SDC MWMC Improvemenl SDC MWMC Administralion SDC Sanitary/Slorm Admin SDC Transpo Admin Plan Review Comrn/IndlPublic Plan Review Fire & Life Safely Building Permit Paving + 7% State Surcharge Paid By DAVID HOFFMAN lIem Totai: Check Number Authorization Received By Batch Number Number How Received djb 000413 004708 In Person Payment Total: Page I ofl 9:45:35AM Amount Due 25.38 71.00 232,00 64,95 286,53 71.92 48,97 10,00 14,20 21.52 40,56 86,64 208,80 45,00 14,62 $1,242,09 Amount Paid $1,242,09 $1,242.09 A AlTACHMENTA , ' . CITY ~GFIELD SYSTEMS DEVELOPMENT CHARGE .SHEET JOURNAL OR JOB NUMBER COM2004-00603 NAME OR COMPANY: PETERSON MACHINERY LOCATION: 2300 HENDERSON AVE MAP & TAX LOT NUMBER: 18 03 03 20 00600 ' DEVELOPMENT TYPE: NEW BI.JlLER STORAGE BLOO NEW DEVELOPED AREA (S,F,): 800,00 EXISTING DEVELOPED AREA (S,F,): TOTAL IMPERVIOUS SURFACE (S,F,): ITE: ITE: LOT SIZE (S,F,): 150 o ,1 STORM ~Q.AINAGE IMPERVIOUS SQ, FT, x $ 0,290 PER SF TOTAL STORM DRAINAGE SDq $ 232,00 1070 800 2 SANITARY SFWFR-CITY A, REIMBURSEMENT COST: NUMBER OF DFU's 0 B. IMPROVEMENT COST: NUMBER OF DFU's 0 (SEE REVERSE SIDE) . ;l 2 ... ~.~.S' ,::~oo.~ . . ~ m la x $ 22,64 PER DFU , $ I $ 1091 x $ 17.21 PER DFU , $ I $ 1092 TOTAL WCAL W ASTEW A TER SOC:' $ 3 TRANSPORTATION BLOO AREA TGSF x TRIP RATE x COST PER ADT x NEW TRIP FACTOR NEW A. REIMBURSEMENT COST: 0,800 x 4,96 x $ 17.23 PER TRIP x 0,95 NTF 1$ 64,95 I B. IMPROVEMENT COST: 0,800 x 4,96 x $ 76,01 PER TRIP x 0,95 NTF 1$ 286,53 I EXISTING A. REIMBURSEMENT COST: 0,000 x 0 x $ 17.23 PER TRIP x 0 NTF 1$ B. IMPROVEMENT COST: 0,000 x 0 x $ 76,0\ PER TRIP x 0 NTF 1$ TOTAL TRANSPORTATION REIMBURSEMENT SIX:' $ TOTAL TRANSPORTATION IMPROVEMENT SIX:' $ $ TOTAL TRANSPORTATION SOC:' $ 351,481 64,95 1093 286,53 1094 351,48 4 SANITARY SEWER - MWMC NEW: A. REIMBURSEMENT COST: NUMBER OF FEU's 0,800 x $89,89 PER FEU 1$ B, IMPROVEMENT COST: NUMBER OF FEU's 0,800 x $61.21 PER FEU 1$ EXISTING: A. REIMBURSEMENT COST: NUMBER OF FElYs 0,000 x $0,00 PER FEU 1$ B, IMPROVEMENT COST: NUMBER OF FElYs 0,000 x SO,OO PER FEU 1$ MWMC CREDIT IF APPLICABLE (SEE REVERSE) 71,92 I 48,97 I I $ TOTAL MWMC REIMBURSEMENT FEE: $ TOTAL MWMC IMPROVEMENT FEE: $ MWMC ADMINISTRATIVE FEE: $ , TOTALMWMCSOC:I $ 130,89 ~ SUBTOTAL (ADD ITEMS 1,2,3, & 4) I $ 714,37 ~ 5 ADMINISTRATIVE FEES: BASE CHARGE (SUBTOTAL ABOVE) $ 714.37 x 5% $ 35,72 TOTAL TRANSPORTATION ADMINISTRATION FEE:' $ TOTAL SEWER ADMINISTRATION FEE:1 $ 1054 71.92 1054 48,97 1055 10.00 1056 21,52 1078 14.20 1079 steve"" W, lSeoL<drl:j lSor"'-<S 5/25/2004 C(j~~I\sON MACHINERY, 231)Q HEN~mN,xls TOTAL SOC CHARGES , $ 750,09 I JULY 2001