HomeMy WebLinkAboutPermit Mechanical 2002-6-6
.
'.
I Job# 02-00455-01 I
.'
225 Fifth Street
Springfield, OR 97477
CITY OF SPRINGFIELD, OREGON
PUBLIC PERMIT
City Of Springfield
Community Services Division
Building Safety
~
Page 1 of 3
TRANS#:01-0009419
DATE:JUN 06 2002
AMT RECD:2 $ 3122.51
CHANGE:
CASHIER: 061
Job Number: 02-00455-01
Office: 726-3759
Inspection Line: 726-3769
Location Of Proposed Site: 1300 Hayden Bridge Rd Spr
Assessors Map#: 17032522
Lot: Block: Addition:
Owner: Springfield Public Schools Phone Number: 541-744-6375
Address: 525 Mill Street City/State/Zip: Springfield, OR 97477
Scope Of Work: 'Mechanical Alteration ,:,'O.~ Value: $642,807
:-\0 .~ t>'
Elizabeth Page Elementary School ,~0"" ~-\)~ ~,o s:,'"
24 geothermal heat pump units wi catwalks & supp..2i(tr.?li'LeJ~~'l:<:l^",,'Q:-\
...'f;~ .....0 "',otp'" to..<<' - ,v' ~<:-'U _~
Contractor ,:Re!iistration'#~"EXpiration Date
~... )".'v . r~0' ^'... 0' ~0"'. .;,Cl'
Scofield Electric Co ,\Ili ,<38702,0'>:'^"" ^'~12/21/2005
....v ~.... ''''o':::'\'' ~'U tr:-V ~_
Po Box 2765, Eugene, OR 97402,030?~~:P ~0" '~~" vo"i~0':"'~ #'
~" ","" ",<::' \:)() '~~o -\)~ !),
Hatten/Johnson Associates ,,<</ <.~ "CJ s:," ~....'1i ~~ 0'" ,r'J.
"'.' 0' l::J ,,0 ~0 ~ 5C'"
223 West 12th Avenue, Eugen~~O~' b'l: <$>~'\ 0<::' O<.1li 9'N
97401 ,0 ;J~C! ~Oj,:, ",v (<::>'" "
_,0 O~ 4,0 ;s<,~ ....f>
Mechanical Contr EMK Mechanicallnc ':~ ,,~. <~~136463'
'\': ~.,) '* 0' CJ0'
4290 West11lh Street, Suite A, Eugene,~'O
OR 97402 "'-V
Contractor Type
Electrical Contr '
Engineer
Plumbing Contr
Tax Lot #: 00800
Subdivision:
8/23/2003
EMK Mechanicallnc
4290 West11lh Street, Suite A, Eugene,
OR 97402
136463
8/23/2003
Phone
541-686-8612
541-343-8748
541-683-3715
541-683-3715
~'t-~
, ~ ,~'\
Office Use ,.~~~~~~
Quad Area: 2PNC Land Use: Elementary School "~~~.&~:
# Of Units: Zoning Code: lDR ~\, Y Group: School 50+
Constr. Type: Bedrooms:. Il>~~ S)<tl ource:
Water Heater: Range: ~\'\,~~~'\. ~~Q.. {s I;ootage:
~~ ~~ ~~ ~-~~
To request an inspection call the 24 hour recording at 726-37691.~'~. 1Jquested before 7:00
a,m. will be made the same working day, inspections requested ~ ~~i11 be made the following
working day, li:I(S ~ 'i:
Required Inspection~
Buildinn
Framing
Structural Welds
Final Fire
Final Building
- Prior to cover,
- To be done during construction by State Certified Special Inspector, Provide inspection test res
-When all Fire Department requirements have been mel.
-When all required inspections have been approved and the building is complete,
~j
.
.
Page 2 of 3
I Job# 02-00455-01 I
Required Inspections
I Plumbing I
-After device is installed but before backfilling trench,
Mechanical
Backflow Device
Rough Mechanical
Final Mechanical
- Prior to cover.
-When all mechanical work is complete,
Zoning: LOR
FloodPlain? 0 Wetlands? 0
Journal numbers
1: 2:
Comments:
Overlay District:
# of Street Trees:
Land Use: Elementary School
Pave Driveway? 0
3:
Additional Requirements:
Glenwood Area? 0 Required Attachments:
Source Locn:
Material:
Planner:
Urban Growth Boundary?D
Quantity Of Fill:
Supplier:
Drainage:
Floodway FEMA:
Construction Types:
Occupancy Groups:SchooI50+
# Of Buildings:
# Of Bedrooms:
Handicap Access? 0
,Area (Sq. Feet)
I Main: Accessory:
Fee
Public Plan Review
Adjusted Public Plan Review
Total Plan Check
Building Permit
State Surcharge For Building Permit
State Surcharge For Building Permit
8% Building Administrative Fee
8% Building Administrative Fee
Total Building
Minimum Plumbing Permit Fee
State Surcharge - Plumbing
State Surcharge - Plumbing
Backflow Prevention Device
8% Administrative Fee - Plumbing
8% Administrative Fee - Plumbing
Total Plumbing
Flood Plain FEMA:
# Of Stories:
Current Units:
Census Code: Does not apply
Height (feet):
Proposed Units:
Total:
Paid On Receipt#
Plan Check
04/25/2002 8724
OS/24/2002 9228
Value/Quantity
Fee Amount
450,000
408
$1,107,05
$407,71
$1,514.76
Building
06/06/2002 9419
OS/24/2002 9228
06/06/2002 9419
05/24/2002 9228
06/06/2002 9419
642,807
$2,330.40
$.00
$163,13
$,00
$186.43
$2,679.96
Plumbing
06/06/2002 9419
OS/24/2002 9228
06/06/2002 9419
06/06/2002 9419
OS/24/2002 9228
06/06/2002 9419
1
$31.00
$,00
$3.15
$14,00
$,00
$3,60
$51.75
,1 Fee
.
Job# 02-00455-01
.
Page 3 of 3
Value/Quantity Fee Amount
Paid On Receipt#
Mechanical
06/06/2002 9419
OS/24/2002 9228
06/06/2002 9419
06/06/2002 9419
06/06/2002 9419
06/06/2002 9419
06/06/2002 9419
OS/24/2002 9228
06/06/2002 9419
Minimum Mechanical Permit
8% Administrative Fee - Mechanical
8% Administrative Fee - Mechanical
3hp -- 100,000 BTU
AlterlAdd to ea Appl Unit or System
Equipment Not Itemized on Permit
Mechanical Issuance
State Surcharge - Mechanical
State Surcharge - Mechanical
Total Mechanical
Photocopy Fees
Total Deposit/Copies/Mis
Grand Total
Plan Check Type
Initial Review-C/I/P
Engineering-CII/P
Planning-CII/P
Structural-CII/P
Fire Marshal-CII/P
SUB - Comm/lnd
SUB - Commllnd
$.00
$.00
$26.16
24 $288.00
1 $30,00
1 $9,00
$10,00
$,00
$22,89
$386.05
Deposit/Copies/Mis
06/06/2002 9419
Checked By
Date Completed
9
$4,75
$4.75
$4,637.27
Comment
Chan9ing heating system to geothermal heat
pumps from hot water radiators. Geothermal
system to collect ground water from new water
well and inject back into aquafer throu9h
separate infustion well. Existing boiler to
remain operational to serve kitchen and
restorooms and possibly to provide backup for
heat pumps. 4/26/02 Received engineering for
connection of HV AC rackson top of walls,
Added 2"x2"x1/4" washers to underside of wall
plates, OK dim
Not required to be reviewed by the fire dept.
Pass energy code review
Faxed compliance forms 3b & 5b with
documentation to Jack Foster from the
architect dim
By signature, I state and agree that I have carefully examined the completed application and do
hereby certify that all information herein is true and correct, and I further certify that any and all work
performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of
the State of Oregon, I further state that only contractors and employees who are in compliance with
ORS 701,055 I be used on this project. I further agree to ensure that all required inspections are
requeste~t ~roper time and that the project address is readable from the street.
, ~ '( ..-> 6-i., -02-
"
Signature Date
Lisa Hopper
Pam Ownby
Liz Miller
04/22/2002
05/03/2002
04/23/2002
04/29/2002
Don Moore
AI Gerard
Jack Foster
04/30/2002
05/06/2002
04/26/2002
Don Moore