Loading...
HomeMy WebLinkAboutPermit Building 1992-5-15 COMMERCIAL/INDUSTRIAL" PERMIT APPLICATION .- JOB NUMBER ~-I~ W;;'~ ~ //9/ ASSESSORS MAP' /10:> "'). 7 '7"') ll/l;(?/&~r ;:..,(; e 'CA"in,Y.u.W~ ,//h'k:-7l~~) (;//7J, JA7.<; ma.- AJh,] 225 Fifth Street, Springfield, Oregon 97477 INSPECTION LINE: 726,3769 OFFICE: 726.3759 LOCATION OF PROPOSED WORK' ,~Lh'1_) ,4 TAX LOT: n~4f9-r> OWNER' PHON'" ADDRESS: S7, CITY: STAT'" ' ())< ZIP' q7~f3 c..4~ '-( DESCRIPTION OF WORK' NEW REMODEL ~ ADDITION WA"7tX DEMOLISH OTH ER VALUE: NAME ADDRESS PHONE ARCHITECT' CONTRACTOR'S NAME ADDRESS CONST, CONTRACTOR' EXPIRES 10''0'" GENER,'" I. PLUMBING: 4-..;' d7?/JA.;~ /t:#/H"4/-"/( MECHANICA' ' fq'l'-;' / ,A t//dw ;?? C:2c. h,r~ , -97#/ ELECTRICA" PLUMBING I NO, I FEE CHARGE I / Single Fixture W/OI ?bol Relocated Bldg, 1 I . (new fix, addtll Water Service 1 I It. Sanitary Sewer 1 1 It. Storm Sewer 1 1 It. Backflow Device I I MECHANICAL I\In eC'1: Furnacel burner & vent < 100,000 BTUs Furnace/burner & vent > 100,000 BTUs Floor furnace and vent Suspended wall or floor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent System apart Irom AC or hlg, Mechanical exhaust hood and duel Permit Issuance TOTAL PERMIT , 7LJ,"'<> TOTAL PERMIT - OFFICE USE - HANDICAP ACCESS: FLOOD PLAIN: OUAD AREA' LAND USE: . OF BLDG~' . OF UNITe,' lONING: LIGHTING POWER BUDGET: WATER HEATER' OCCY GROUP' CONSTR. TYPF' . OF STORIES: HEAT SOURCE: SQ, FT, $/SQ, FT, VALUE SQ, FTG MAIN SQ, FTG ACCESS X ,X SQ, FTG OTHER X TOTAL VALUE OF PROJECT PLAN CHECK FEr , . PHONE 74/-22f 2.. I r:HARGi I I I 1 I I I 1 1 $10,00 I 1 I BUILDING PERMIT 15% Stat,e Surcharoe I MECHANICAL 15% State Surcharae 1 PAVI NG RCPP OAT" BY PLUMBING 20. 0 <:> I DEMOLITION j 5% State l,deJ I Surcharoe 1 FENCE 1 BWoP rei.; , 20 6-01 VALUE $ I SIDEWALK 1 SUBTOTAL I FT, PE RM ITS I CURBCUT 1 SYSTEMS ?O;2...~'71 FT. DEVELOPMENT TOTAL PERMIT FEES I EXCLUDING ELECTRICA' 243. 3"1 . REQUIRED INSPECTIONS . It Is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726.3769 (recorder), state your City designated job number, job address, type of Inspection requested and when you will be ready for Inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day, SITE INSPECTION: To be made after excavation, but prior to setu p of forms. MBI~ '-I~ MEC'HANICAL:]Sll>> work is to be covertld until these inspections have been made and approved. PAVING: After gravel is in place but prior to placing 'asphalt or concrete. '>< UNDERSl6l1fPLUMBING, ') . ELECTRICAl,.. MECHANICAL: 10 be made before any work is covered. ATTIC DRAFT STOPS & CURTAIN WALLS FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel in place, but prior to placing concrete. FIREPLACE: Prior to placing facing materials and before framing Inspection. SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special inspector shall be employed by the,Owner! Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. CONCRETE SLAB: To be made after all inslab building service equipment, conduit, piping, accessories and other ancillary equipment items are In place but before any concrete is placed. FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. STRUCTURAL CONCRETE: In excess of 2500 P.S,1. (306 a,1) STRUCTURAL WELDS: Performed on the job, (2722 f) UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and d rai nage II nes. To be made prior to covering or filling trenches. INSULATION & VAPOR BARRIER: To be made after all insulation and requl red vapor barriers are in place but before any lath or gypsum board interior wall covering is applied, . HIGH STRENGTH BOLTING: During all bolt installation and tightening operations. (306 a,6) SPRAYED ON FIREPROOFING, U,B,C, Standards 43.8. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor insulation, decking or floor sheathing. FIRE & SEPARATION WALL: Located and constructed according to plans. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork, (306 a,11 & Chapter 29) POST & BEAM: To be made prior to installation of floor insulation, decking or floor sheathing. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, interior and exterior, is in place but before any plastering is applied or before gypsum board joints and fasteners are taped and finished, GLU.LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed, (2501 U,B,C, STDS, 25.10,11), FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. STRUCTURAL MASONRY: (306 a,7) MASONRY, Steel location, bond beams grouting or verticals in accordance with UBC 2415, SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all 'excavating complete and form work and sub-base material in place. ROOF SHEATHING AND NAILING: Prior to Instailing any roof covering. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. .In addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. y r ->(-FINAL~UM~NG-------------SITE~LAN~EV~~~OA~D:MUS~~requeste:~ay~~adVanc~ / of the date you wish inspection. All project conditions such as ><:. . landscaping, parking lot striping, etc. must be completed before /' ~ FINAL ELECTRICAL requesting this Inspection. X FINAL BUILDING: Requested after the final plumbing, electrical, / ""mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. 8/.:;y, { ~/CA--L ;t;;)A'Jt?H?~r:; A-/.._<;/). FINAL MECHANICAL FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS: N€="E:1) /~ /'11/'/ lJ i= :>f?c) .M:' - /z'<<L~;- ~ ~"clZ /A.Y<~//.ilA) ~/'j;;ee ~~...d/~ f 0/' T~ ~bh?U? /A/r rMJA--C.- /#p~//V2J ~~I PLANS REVIEWED BY DAT" By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all Information herein is true and correct, and I further certlfy that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY wlil be made of any structure without permission of the Building Safety Division, I further certify that only contractors and employees who are In compliance with ORS 701.055 will be used'on.thls project. I further agree to ensure that all required inspectrons are requested at the proper time, that project address is readable from the street, that the permit card Is located at the front of the property, and the approved set of plans will remain on the sIte at all times durIng constructIon. Signat~ ~ DO ~ .5~/S'~ '72- DatE" VALIDATION: AMOUNT RECEIVED: RECEIPT #: 2"f"'''3 ~_7~ 3'7 DATE PAID: RECEIVED BY: 5-( ) -;2- A"07~