Loading...
HomeMy WebLinkAboutPermit Electrical 1996-11-6 . Tho following project n~ submitted ~as tho foil zoning and does not require specific land U80 'I 225 FIITH STREET apprc'v'al. J7 /! / ELECTRICAL PERMIT APPLICATION SPRINGFIELD, OREGON 97477 ( V /2 , I, . I INSPECTION REQUEST: 726-3769 Zonino. City Job Number ~/'& I~Lf OFFICE: 726-3759 n"t"ll--CI ~ 1. LOCATION OF INSTALLATION,thorized Signature 1024 Harlow Roan~ Snr'nafiplH LEG^( --fES00PTi~ rJ7J f) 1/h Or?] JOB DESCRIPTION connect to existing circuit .Permits are non-transferable and expire if work is not started within 180 days of issuance or if work is suspended for 180 days. 2, CONTRACTOR INSTALLATION ONLY I Electrical Contractor RAY-Q-~!~~ SIGNS, INC Address 101 N. Seneca Phone nRR-?~nn Ci ty Eugene. Supervisor License Number 219SIG Expiration Date 10-1-98 Constr Contr. Number 71490 Expiration Date 2-1-Q7 ~ I Owners Name PuddingCieek Co. Address POBox 640 Ci ty _J;'].p-~~~.'\LHi.ll Olfllone 485-5611 OllNER INSTALLATION The installation is being made on property I own which is not intended for sale, lease or rent, Ovners Signature: DATE: II-~-qfp RECEIPT 11: RECEIVED BY: N n5(OHPLETE FEE SCHEDULE BELOY ,. A. New Residential-Single or Multi-Family per dwelling unit. Service Included: .1000 sq.ft. or less Each additional 500 sq. ft or portion thereof Each Manuf' d Home or Modular Dwelling Servi~e or Feeder B. Services or Feeders Installation, Alterations or Relocation: It ems Cost Sum 200 amps or less 201 amps to 400 amps 401 amps to 600 amps 601 amps to 1000 amps Over 1000 amps/volts Reconnect Only . $ 85.00 $ 15.00 $ 40.00 $ 50.00 $ 60.00 $100.00 $130.00 $300.00 $ 40.00 C. Temporary Services or.Feeders Installation, Alteration or Relocation 200. amps or less 201 amps to 400 amps Over 401 to 600 amps Over 600 amps or 1000 volts D. Branch Circuits $ 40.00 $ 55.00 $ 80.00 see "B" above New, Alteration or Extension Per Panel One Circuit Each Additional Circuit or with Service or Feeder Permit $ 35.00 $ 2.00 E. Miscellaneous (Service/feeder not included) -Each installation Pump or irrigation $ 40.00 Sign/Outline Lighting L $ 40.00 4U.UO Limited Energy/Res $ 20.00 Limited Energy/Comm $ 36.00 5. SUBTOTAL OF ABOVE 40.00 5% State Surcharge 2.00 3% Administrative Fee ~~ I.~O TOTAL <4-14..- '4 ? '/.,0