Loading...
HomeMy WebLinkAboutPermit Building 1995-2-22 COMMERCIAL/INDUSTRIAL - PEBMIT APPLICATION 225 Fifth Street, Springfield, Oregon 97477 ~ .J~B NUMBER ~ 5V210 INSPECTION LINE: 726.3769 OFFICE: 726.3759 ASSESSORS MAP: LOCATION OF PROPOSED WORK: _lalr:-. HAR2/)/ro) 2.:?- 80 /21)'4 1/1)'2., / Sl'R/;lI~1 ELf) TAX LorD ., _ .~ IJ I OWNER: ' Pu. Of)/1I/6 c.RC9< 1.4LJL1l ADDR'''''''' P. O. &x. 6'10 CITY: jJL~A91/117 .H/.l-l- ~o, PHON~' Q'i?5 -5"6// STAT~' C?~, ZIP: 9?455 'NEW REMODEL 0111-1(21,,)6 X WA.J-L /Al-F/ LL DESCRIPTION OF WORJ<' ADDITION DEMOLISH OTHER VALUE: II? {. ~. = NAME ADDRESS PHONE ARCHITECT: CONTRACTOR'S NAME GENERAL: CHA.I'J16Ef!'5 ADDRESS /'.l)/!/6,I?vfc.T /0/1/ CONST. CO NT RACTO R . 6016~O E,XPIRES 1s/3L/95 PHONE 11Rl)-~ PLUMBINC" MECHANICA' . ELECTRICA" EuI/....(}he6, EJ...r-LTI!?I ~ PUIMRINn NO. . FFF r.~AR(le..J ..n MECHANICAL ~~~ "U6Q(.U= It. Furnace/burner & vent < 100.000 BTU. Furnacelburner & vent > 100.000 BTU. Floor lurnace and vent Suspended wall or floor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent System apart Irom AC or htg. Mechanical exhaust hood and duct Single Fixture Relocated Bldg. {new fix. addtll Water Service I I I I , I I I I I sanitary Sewer It. It. Storm Sewer Backflow Device Permit Issuance S10.00 TOTAL PERMIT TOTAL PERMIT - OFFICE USE - HANDICAP ACCESS' FLOOD PLAIN' aUAD AREA: , OF BLDGS: OCCY GROUP' . OF STORIES' LAND US~' . OF UNITF" ZONIN'" LIGHTING POWER BUDGET:", WATER HEATER' CONSTR. TYP~' HEAT SOURCE: sa. FT. slsa. FT. VALUE sa. FTG MAIN sa. FTG ACCESS sa. FTG OTHER x x x TOTAL VALUE OF ,PROJECT ) 9-J mo PLAN CHECK F~~ RCPP DATF BY ,r-- DEMOLITION , BUILDING PERMIT 5% State )48+ C! 1 Surcharne, 10 MECHANICAL ':2 '),':JO '2.. :l 7 . PLUMBING 5% State Surcharae PAVING 5% State Surcharge FENCE VAIIIF. $ SIO-eWALK CURBCUT FT. SUBTOTAL PERMITS SYSTEMS , OEVELOPMENT FT. TOTAL PERMIT FEES I EXCLUDING ELECTRICAl 3/. ~7 . . REQUIRED INSPECTIONS. It Is the responsibility of the permit holder to see that all Inspections are made at the proper time. To request en Inspection, call 726.3769 (recorder), state your City designated Job oumber, fob address, type of lospectlon requested and when you will be ready lor Inspection. Requests received before 7:00 a.m. wlll'be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be made after excavatlon~ but prior to setup of forms. UNDERSLABPLUMBING, . ELECTRICAL & MECHANICAL: To be made before any work Is covered. ROUGH PLUMBING, , ELECTRICAL & MECHANICAL: No work Is to be covered until these Inspections have been made aod approved. PAVING: After gravel Is In place but prior to placing asphalt or concrete. "'CONCRETE SLAB: To be 'made after all Inslab building service equipment, conduit, piping, accessories and other ancillary equipment Items are , In place but before any concrete Is placed. ~ FIREPLACE:' Prior to placing facing meterlals and before framing Inspection. ", ,\ FRAMING: To be made after the roof, all framing, fire blocking snd bracing are In place and sll pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. SPECIAL INSPECTIONS: In sccordance Sectloo 306 of the State Specialty Code a special Inspector shall be employed by the Owner/ Contractor during construction of the following work, A copy ofthe special testlog reports shall be furnished to the Building Dlvlsloo. ATTIC DRAFT STOPS & CURTAIN WALLS . FOOTINGS & FOllNDATlONS: To be mede after trenches are excavated and forms are erected, all steel 10 place, but, prior to placing concrete. STRUCTURAL CONCRETE: In excess of 2500 P.S.I. (306 a.1) STRUCTURAL WELDS: Performed on the Job. (2722 f) , , INSULATION & VAPOR BARRIER: To be made after all Insulation and required vapor barriers are In place but before any lath or gypsum board Interior wall covering Is applied. HIGH STRENGTH BOLTING: During all bolt Installation and tightening operations. (306 a.6) UNDERGROUND: Plumbing, electrical, gast sanitary sewer. storm sewer, water and drainage lines. To be made prior to covering or filling trenches. SPRAYED ON FIREPROOFING: U.B.G. Slandards 43.8. FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sheathing. LATH AND/OR GYPSUM BOARD: To, be made after all lathing and gypsum board, Interior and exterior, Is In place but before any plastering Is applied or before gypsum board Joints aod fasteners are taped and finished. SPECIAL GRADING, " EXCAVATION AND FILLING: During earthwork. (306 a.11 & Chapter 29) GLU.LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.B.c. STDS. 25-10,11). STRUCTURAL MASONRY: (306 a.7) v FIRE & SEPARATION WALL: " Located and constructed according to pia os. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to Installation of floor Insulation, decking or floor sheathing. , POST & BEAM: To be made prior to Installation of floor Insulation, decking or floor sheathing. MASONRY: Steel locatloo, bond beams grouting or verticals In accordance with UBC 2415. SIDEWALK'& DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete end form work and sub-base material In place. "In addition to the Inspec. tlons specified, the Building Official may make or require other Inspections 01 !,ny construction work to ensure compliance with the Building, City or Development Code. ROOF SHEATHING AND NAILING: Prior to Installing any roof covering. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. ------------------------------------------------------- FINAL PLUMBING FINAL MECHANICAL ')< SITE PLAN REVIEW BOARD: Must be requested 2 days In advance of the date you wish Inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting this Inspectloo. FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department Inspections are made and . approved. No occupancy of the premises can be made until a Certificate of Occupancy has been Issued by the Building Division and posted on the premises. FINAL ELECTRICAL FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS: ;I.J F;lj- , IJ ,..v!-I ~ lI)()/ "" ( qi= 3. €ifJN J/A.JZ?s h) 'b<.(mAJ~ )J~t{'IiI/2. .- . . PLANS REVIEWED BY A ,I(~ OAT" Z/22/",r / By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all Information herein Is true and correct, and I further certify that any and all work performed shall be done In accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertalolng to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are In compliance with ORS 701.055 will be used on this project. . I further agree to ensure that all required Inspections are requested at the proper time, that project address Is readable from the street, that the permit card Is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. ' , Slgnature~~~/h~A/] Date 2. /-;:z:;z./9< VALIDATION: AMOUNT RECEIVED: :< /. ~ ? RECEIPT ': / {; _e? <. DATE PAID: 2/):2 /tr 1~0_ RECEIVED BY: C v ""'-,?A--'"I