COMMERCIAL/INDUSTRIAL PERMIT APPLICATION
CITY OF SPRINGFIELD Job Number: 971006
COMMUNITY SERVICES DIVISION
BUILDING SAFETY
225 North Fifth Street
Springfield, OR 97477
Office: 726-3759
Inspection Line: 726-3769
Location of Proposed Work: 1011 HARLOW RD
Assessors Map #: 17032200
Tax Lot #: 02503
Owner: PACIFIC CONTINENTAL
Address: 111 WEST 7TH
Phone #: 686-8685
City/State/Zip: EUGENE, OREGON 97401
Description Of Work: BANK & TENANT SPACE
NEW
Value:
0.00
Name
Architect: GLAS ARCHITECTS
Address
REID ANDERSON
Phone
686-2014
--- PLUMBING ---
No.
57
Fee
Charge
570.00
55.00
55.00
190.00
55.00
20.00
Single Fixture
Sanitary Sewer
Water Service
Storm Sewer
226' FIRE LINE
2 BACKFLOW DEVICES
170
216
1084
ft.
ft./; ~
~.~ ~
C 0, U'..<> ~
~ ~ 1a ~ .'
~~~~
~~~~
~~~"?y
:t-o-Q ~ ~ ~\.
MEC~cAfl J,.., '~
~ -1~ ~ ~Fee
1000, 000 'BTU~ ~ ~
~~~~
<::>~ ~ ~
~~rr
945.00
TOTAL PERMIT
3
Furnace/burner & vent <
Vent Fan/Single Duct
7 CONDENSOR UNITS
3 VENT SYSTEMS
6 GAS OUTLETS
Permit Issuance
Charge
60.00
, 9.00
42.00
13.50
3.00
10.00
No.
TOTAL PERMIT
137.50
HANDICAP ACCESS: Y
- - OFFICE USE
QUAD AREA: 1CNW
LAND USE: 5300
Item
Sq. Ftg Main
PARKKING GARAGE
CANOPY
Square Feet
36461
12880
1118
x
$/Square Feet
Value
2,464,107.00
0.00
0.00
TOTAL VALUE OF PROJECT
2,464,107.00
.
,
SPRINOFIELD
Job Number: 971006
Page 2
Plan Check Fee:
1,880.45 Rec #: 26444 Date: 07/01/97 Rec By: DON MOORE
BUILDING
Surcharge/Admin
MECHANICAL
Surcharge/Admin
PAVING VALUE
PLUMBING
Surcharge/Admin
SIDEWALK
CURBCUT
ADDITIONAL PLAN REV.
CITY SDC FEES
385,180.00
4,280.50
342.45
137.50
10.21
1,076.50
945.00
75.60
46.60
18.10
901.88
121,632.20
7,l8'.y. :1"
J,;l.9 , 4 H 540
SUBTOTAL PERMITS
TOTAL PERMIT FEES EXCLUDING ELECTRICAL
129,466.54
REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are
made at the proper time. To request an inspection, call 726-3769
(recorder), state your City designated job number, job address, type of
inspection requested and when you will be ready for inspection. Requests
received before 7:00 a.m. will be made the same working day, requests made after
7:00 a.m will be made the following work day.
Special Inspections: In accordance with
a special inspector shall be employed by
construction of any following "*11 work.
shall be furnished to Building Safety.
Section 306 of the State Specialty Code
the Owner/Contractor during
A copy of the special testing reports
In addition to the inspections specified, the Building Official may make or
require other inspections of any construction work to ensure compliance with
the Building, City or Development Code.
GRADING/EXCAVATING/FILLING - To be done during constr by Special State
Certified Inspector. Provide reports/tests to City Building Inspector
UNDERGROUND PLUMBING - Prior to filling trench.
TEMPORARY POWER
UNDERGROUND ELECTRICAL - Prior to Cover.
FOOTING - After trenches are excavated.
FOUNDATION - After forms are erected but prior to concrete placement.
SLAB - To be made after all inslab building service equipment, conduit
piping, and other equipment items are in place but prior to concrete
BOLTS INSTALLED IN CONCRETE - To be done by State Certified Special
Inspector. Provide inspection/test reports to City Building Inspector
STRUCTURAL CONCRETE in excess of 2500 psi. To be done during constr.
by State Cert. Insp. Results to City Building Inspector
MASONRY - Steel location, bond beams grouting or verticals in
accordance with UBC 2415.
STRUCTURAL MASONRY - To be done during constr by State Certified
Special Inspector. Provide results to City Building Inspector.
HIGH STRENGTH BOLTING - To be done during constr by State Certified'
Special Inspector. Results provided to City Building Division.
SPRINGFIELD
Job Number: 971006
Page 3
STRUCTURAL WELDS - To be done during constr by State Cert Special
Inspector. Results of inspection/test to City Building Inspector.
SPRAYED ON FIREPROOFING - To be done during constr by State Cert Spec
Inspector. Provide reports/tests to City Building Inspector.
ROUGH PLUMBING - Prior to cover.
ROUGH MECHANICAL - Prior to cover.
ROUGH GAS - after line is installed and capped if not attached to an
appliance
ROUGH ELECTRICAL - Prior to cover.
ELECTRICAL SERVICE - Must be approved to obtain permanent power.
FRAMING - Prior to cover.
INSULATION - Floor; prior to decking Wall/Ceiling; Prior to cover
INSUL-V.B./SUB: TO BE CALLED FOR AT SAME TIME AS SUB FRAMING INSPECT
DRYWALL - Prior to taping.
CEILING GRID
FINAL PLUMBING - When all plumbing work is complete.
FINAL GAS - When all gas work is complete.
GAS SERVICE - After line is installed and line has been connected to a
minimum of one appliance. Pressure test done at this point.
FINAL MECHANICAL - When all mechanical work is complete.
FINAL ELECTRICAL - When all electrical work is complete.
FINAL BUILDING - When all required inspections have been approved and
the building is complete.
- - - ADDITIONAL COMMENTS - --
DRC 96-12-256, PLANNER IS JIM DONOVAN
SITE REVIEW JOURNAL #96-12-256, JIM DONOVAN, PLANNER
ADDITIONAL FINAL INSPECTIONS REQUIRED WHICH WOULD NOT FIT: FINAL SUB, FINAL FIRE
DEPARTMENT, SITE PLAN FINAL, SIDEWALK, CURBCUT.
Plans Reviewed By: LORNE PLEGER Date: 09/03/97
Building Site Reviewed By: LISA HOPPER
By signature, I state and agree, that I have carefully examined the completed
application and do hereby certify that all information hereon is true and
correct, and I further certify that any and all work performed shall be done
in accordance with the Ordinances of the City of Springfield, and the Laws
of the State of Oregon pertaining to the work described herein, and that
NO OCCUPANCY will be made of any structure without permission of the
Community Services Division, Building Safety. I further certify that only
contractors and employees who are in compliance with ORS 701.055 will be
used on this project.
I further agree to ensure that all required inspections are requested at the
proper time, that project address is readable from the street, that the
permit card is located at the front of the property, and the approved set
of plans will remain on the site at all times during construction.
J~AM I/~
Signature /
11-24.77
Date
--- VALIDATION ---
Receipt Number:
Date Paid:
\ \- 9.., L\ 0./,
Amount Received:
,
Received By:
",
. . JOB NO. 'TI/~k')'?
AIT ACHr~ENT A
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE
WORKSHEET
/.
NAME OR COt1PAN'/: .2~/'..h1,;. &,,J7'n~~1.lJ:-
LOCATION: /0;/ 4".h0/!d
OEVELOPMENT TYPE Aj~'LA/ ih-n. jL:. / of/!., c..e ,$Ii
BUILOING SIZE 1.~7XJ fe;eJ.-.j/~\ OT SIZE fb .6,;; /
STORH ORArHAGF LtbYt~-~Y _ '
1. p'if hN/~'f'e.IY~ :;.-1.:1: LI
1I1PERIf [aUS SO. FT, . ("' '"f. ,36/ X $0.226 PER SO. FT.
SO. Ft.
NO. OF PFU'S ;:<)~
(See Reverse Side)
^ $J6.86 PER PFU
~'~\
0-' /
$ '-1 I( ~ i//2b/f7
1,() O~"',-l /I.j
d..l," ~J.: <;.- ~6l"i :lJ1J8lW
. Sf? f.,
$ 7 1& p~
/
, 2.
SMITT;lPY Sr:',,JER-CITY
3. TRANSPORT.U,nON - ~e?\rd,-,-kd :;i-I~
NO OF UNITS X TRIP RATE X COST PER TRIP
f}v.f.
PrAt,-'f '" S-Y x;<O 'X $472.49
fy;f.
wvJ/~-l.lt,,, &3
oJ;"'t-e/~f3,33
~y.P-J .
4. SANiTARY SFWFR.MWMC
NO. OF FEU'S .15,7 X~EpER FlU + $10 ~IWMC/ADM FEE.$ 7',91703::
.:,-'7
~.~.15/- J il!-2.ft!97
TOTA(-MWMr snc ,q;9:f~ ~'2 ~\W
/9 '
l/L497L/c)-
X ,.J- ,l1/'
X $472. 49
87
$,-,>, /0.1-
,30
$~1) '77'0 -
8k
'}..19 qf3 3
".
X 17,'15 X $472 119
MWMC CREDIT IF APPLICABLE (SEE REVERSE)
SUBTOTAL (ADD ITEMS 1.2.3 & 4)
5. ADMINISTRATIVE FFFS
BASE CHARGE (SUBTOTAL ABOVE) X .05
of.
$ .J :~
h~ 4(~~
/I SDc( Co6Cdi na tor '
Date: /;ho/'3>) '. -""'-
TOTAL snc $ a IGd;1
;;/z. ,,17-7 - 7/.,\') (l1j6-'~',')--':; I'd
. ".'.1;".(.;,/ .'J3r.."{,.'.'J- ,c.j..,k,..rC'cl