HomeMy WebLinkAboutItem 13 Ratification of the Fiscal Year (FY) 08-09 Regional Wastewater Program Budget and Capital Improvements Program (CIP) AGENDA ITEM SUMMARY Meeting Date: Meeting Type: Department: Staff Contact: Phone: Estimated Time: May 19,2008 Regular Public Works ~ Susie Smith ~ 726-3697 10 Minutes SPRINGFIELD CITY COUNCIL ITEM TITLE: RATIFICATION OF THE FISCAL YEAR (FY) 08-09 REGIONAL WASTEWATER PROGRAM BUDGET AND CAPITAL IMPROVEMENTS PROGRAM (CIP). ACTION REQUESTED: Consider ratification by motion of the FY 08-09 Regional Wastewater Program Budget and CIP. ISSUE STATEMENT: As provided for in the Metropolitan Wastewater Management Commission (MWMC) intergovernmental agreement (IGA), the City of Springfield, the City of Eugene, and Lane County, as governing bodies, must ratify the MWMC's annual Regional Wastewater Program Budget and CIP. ATTACHMENTS: Attachment A: FY 08-09 Regional Wastewater Program Budget and CIP, as Approved by the MWMC. DISCUSSION: The FY 08-09 Regional Wastewater Program (RWP) Budget and CIP document was approved by the MWMC on March 27,2008. In preparing and reviewing the Budget and CIP, the MWMC convened three budget work sessions and a public hearing prior to taking action to adopt it. The FY 08-09 Budget funds all operations, administrative services, and capital projects planned for the Regional Wastewater Facilities. The CIP outlines and describes the capital proj~cts planned for the next five years. The FY 08-09 R WP Budget and CIP document reflects continued focus on the completion of facilities upgrades and expansion, and operation and maintenance activities to provide wastewater treatment for a growing community through 2025 in a manner that protects the public's health and safety, and the environment. The Commission took a corresponding action to adopt an 11 % increase in regional wastewater user charges in order to fully fund the Budget and CIP. In accordance with the IGA, the MWMC contracts with the City of Eugene for operations and maintenance services, and with the City of Springfield for administrative services. The attached budget document provides regional program and budget summaries as well as detailed budgets for the services provided by Eugene and Springfield. The budget document also provides information about how the R WP activities are driven by MWMC-established goals and performance measures. The FY 08-09 RWP Budget and CIP must be approved by the MWMC and ratified by Lane County, Eugene and Springfield, and then fmally adopted by the MWMC, prior to the beginlling of the next fiscal year (July 1, 2008). The Eugene City Council ratified the Budget and CIP on April 28th. The Board of County Commissioners reviewed the Budget and CIP on May 7th. The County deferred acti'on until May 14th in order to consider requesting that the MWMC and the other governing bodies include language in the budget directing the MWMC to conduct a review of the regional wastewater system development charges (SDCs) during the upcoming fiscal year. This review would be intended to determine changes that could be made to address the IGA objectives for "ensuring equity between newly connected and previously connected users for their total contributions toward the Regional Sewerage Facilities" (IGA Section 3.f.5.). Under the current methodology, SDCs do not generate sufficient revenue to fund eligible portions of the CIP projects under construction, so the objective of "full cost recovery" is not being met. At the May 19th Springfield City Council meeting, staff will review the results of the Board of ' County Commissioners May 14th discussion on this matter. Should the Board request specific changes to the budget document, staff will forward them to the Springfield City Council, as well as the MWMC and the Eugene City Council for consideration. ~\ REGIONAL WASTEWATER PROGRAM BUDGET and CAPITAL IMPROVEMENTS PROGRAM FY 08-09 The Metropolitan Wastewater Management Commission adopted its Operating Budget and Capital Improvements Program (CIP) for FY 08-09 March 27,2008. The Budget and CIP were ratified by the Springfield City Council on May 19, 2008, the Lane County Board of Commissioners on May _, 2008, and the Eugene City Council on April 28, 2008. The Commission gave final ratification to the budget and CIP on June 5, 2008., COMMISSION MEMBERS: Faye Stewart, President (Lane County) Hilary Loud, Vice-President (Eugene) Anne Ballew, (Springfield) Bill Inge, (Lane County) Bonny Bettman, (Eugene) Terry Gould (Eugene) Doug Keeler (Springfield) ST AFF: Dan E. Brown, MWMC Executive Officer/Springfield Public Works Director Susie Smith, MWMC General Manager/Springfield Environmental Services Manager Peter Ruffier, Eugene Wastewater Division Director Robert Duey, MWMC Finance Officer/Springfield Finance Director ATTACHMENT A - Page 1 of 71 METROPOLITAN W ASTEW A TER MANAGEMENT .COMMISSION ADOPTED FY 08-09 BUDGET AND CAPITAL IMPROVEMENTS PROGRAM for the REGIONAL WASTEWATER PROGRAM TABLE OF CONTENTS Budget Message .... .... ................ .... .............. ........ ..... ..... ............... .......... .............. ........... ... .... 1 Regional Wastewater Program Overview................... ...................... ........... ............ .............. 3 Exhibit 1: Interagency Coordination Structure ............................................................... 9 Regional Wastewater Program Budget and Program Summary .......................................... 10 Exhibit 2: Regional Operating Budget Sumniary ........................................................... 10 Exhibit 3: Line Item Summary by Program Area........................................................... 12 Exhibit 4: Budget Summary and Comparison ................................................................ 13 Regional Wastewater Program Staffmg.. ....... .......... ... ............. .... ................................ .......... 1 7 Exhibit 5: Regional Wastewater Program Organizational Chart.................................... 17 Exhibit 6: Regional Wastewater Program Position Summary ........................................ 18 Regional Wastewater Program Reserves. .... .......... ......... ...... ......... ......... ....... .......... ....... ... ....20 Exhibit 7: Operating Reserves - Line Item Budget......................................................... 21 BUDGET APPENDICES Appendix A: Springfield Program and Budget Detail.......................................................... 25 , Exhibit 8: Springfield Administration Program Budget Summary................................. 28 Exhibit 9: Springfield Administration Line Item Summary ...........................................29 Appendix B: Eugene Program and Budget Detail...................................:............................ 30 Exhibit 10: Eugene 0 & M Program Budget Summary ................................................. 35 Exhibit 11: Eugene Administration Line Item Summary ............................................... 36 Capital'Im.provements Program.s.................... ..-.............................................................. ~....... 37 Exhibit 12: Capital Programs - Adopted Capital Improvements Program Projects....... 41 Exhibit 13: Capital Programs 5- Year Plan................... ...................................................43 Regional Wastewater Capital Programs Budget...... ......... ........ ........ ................. .... ................ 48 ATTACHMENT A - Page 2 of 71 Metropolitan Wastewater Management Commission Overview BUDGET MESSAGE To the Metropolitan Wastewater Management Commission: I am pleased to present the Metropolitan Wastewater Management Commission's (MWMC) budget for fiscal year (FY) 2008~09. This budget funds operations, administration, and capital projects planned for the Regional Wastewater Program (R WP). The MWMC administration and Capital Improvements Program (CIP) components of the budget are reflected in the City of , Springfield's RWP budget. The operations, maintenance, equipment replacement, and major rehabilitation components are reflected in the City of Eugene's RWP budget. The Cities' Industrial Pretreatment Programs, managed locally in compliance with the MWMC Model Ordinance, also are included in the R WP budget. This year's budget reflects a continued focus on design and construction of capital improvements planned to ensure that operation of the Regional Wastewater Facilities meets environmental regulations, and that adequate capacity will be provided to meet the needs of a growing service area. The FY 08-09 capital budget and FY 08-09 - FY 12-13 capital improvements work plan, which are included in this budget document, are derived from the 2004 MWMC Facilities Plan. The budgeted amount for FY-08-09 Facilities Plan capital improvement projects is $95,144,404. The FY 08-09 capital budget also includes Major Rehabilitation, Equipment Replacement and Major Capital Outlay capital projects, budgeted at $569,010, $900,000 and $289,000 respectively. For FY 08-09, the combination of new projects and continuing projects carried forward from FY 07-08 results in a total capital budget of $96,902,414. Approximately $31 million of the total capital budget will not be spent in FY 08-09, but is included to enable -contracts for construction that will occur in FY 09-10. Unspent funds will be carried forward to the FY 09-10 budget as appropriate. In order to fund the actual cash flow requirements of the FY 08-09 CIP, the Commission will use its remaining $50 million in borrowing authority to secure the most strategic combination of revenue bonds and State Revolving Fund (SRF) loans. Because the CIP reflects budgeted expenditures in excess of $50 million, additional borrowing also is reflected in the FY 08-09 budget. This borrowing is actually anticipated to occur in FY 09-10 to match the cash flow requirements carried forward at the end ofFY 08-09. The FY 08-09 R WP Operating Budget for Personnel Services, Materials and Services and Capital Outlay expense is $14,540,521. Consistent with the Commission's Financial Plan and policies, the FY 08-09 budget maintains and uses several reserves, which are fuUy described in this budget document. Finally, the FY 08-09 budget includes debt service payments totaling $5,074,388 as scheduled for repayment of$50 million of revenue bonds issued in November 2006, and an additional $50 million in borrowing anticipated in FY 08-09 to fund the Facilities Plan capital improvements. Revenue sources necessary to fund Operations, Capital programs, debt service requirements and reserves include user charges, system development charges (SDCs), interest earnings and a small amount of miscellaneous revenues. For FY 08-09, user fee revenues (including septage service) are projected at $21,193,517. This level of revenue is projected based on an 11 % increase in regional wastewater user fees, as recommended by the MWMC financial advisoFin ordei- to meet the Commission's Financial Plan policies and net revenue objectives. Although SDC charges will be adjusted upward by 2.8% to reflect annual inflation, revenues from SDCs are projected at $1,770,000, which anticipates no growth in revenues over FY 07-08 levels. Page 1 , \ FY 08-09 BUDGET AND eIP ATTACHMENT A - Page 3 of 71 Metropolitan Wastewater Management COinmission Overview In summary, the projected FY 08-09 budget funds operations and administration sufficiently to maintain existing levels of service, and to meet the environmental performance and other legal obligations of the Commission. It funds Capital Programs at a level necessary to implement the 2004 Facilities Plan objectives for compliance with the National Pollutant Discharge Elimination System (NPDES) permit issued to MWMC and the two Cities. Finally, this budget implements the Commission's adopted Financial Plan policies regarding reserves, asset management, and capital financing. REGIONAL W ASTEW A TER PROGRAM RESOURCE AND EXPENDITURE SUMMARY BUDGET AMENDED PROPOSED 2007 -08 2007 -08 2008-09 RESOURCES User Fees $19,089,OQO $19,089,000 $21,193,517 Beginning Cash 71,570,063 77,047,045 59,833,392 Internal Transfers 41,947,127 4,696,823 5,088,081 System Development Charge 1,770,000 1,770,000 1,770,000 Interest 2,023,000 2,023,000 2,691,000 Revenue Bond/SRF Proceeds 50,000,000 50,000,000 86,000,000 *** Miscellaneous 892,635 1,598,135 1,728,900 $187,291,825 $156,224,003 $178,304,890 EXPENDITURES Reserves $50,876,779 $33,271,066 $56,090,286 Operations 10,026,097 10,026,097 10,616,760 Internal Transfers 41,956,272 4,705,968 5,097,281 * CIP 76,982,880 100,229,710 96,902,414 ** Bond Sale Expense 0 O. 600,000 Debt Service 3,702,088 4,064,953 5,074,388 Administration 3,747,709 3,926,209 3,923,761 $187,291,825 $156,224,003 $178,304,890 * Includes three equipment replacement contributions totaling $790,966, Capital Reserve contribution of $4,297,115 and a contribution to the City of Springfield general fund of$9,200 to cover MWMC's contribution for the Classification and Compensation Study. *** In governmental budgeting, projects are fully budgeted in the fiscal year in which the contract is awarded. At the end of each fiscal year, unspent funds are carried forward until the project is completed. This provides budget appropriations necessary for MWMC to commit to contracts that span more than one fiscal year. ,Therefore, although the budgeted amount in the capital budget for FY 08-09 is $96,902,414, the expected 'capital project spending for FY 08-09 is only expectedto total about $65,900,000. Because all capital projects for which contracts will be awarded in FY 08-09 must be fully budgeted in FY 08- 09, the revenue requirements, and in this case, necessary borrowing, must also be shown in the budget year. The actual borrowing planned for FY 08-09 is $50,000,000. ** Respectfully submitted, Q~ -e.~ Dan E. Brown,. MWMC Executive Officer Page 2 FY 08-09 BUDGET AND ClP ATTACHMENT A - Page 4 of 71 Metropolitan Wastewater Management Commission Overview REGIONAL WASTEWATER PROGRAM OVERVIEW The Metropolitan Wastewater Mana!!ement Commission The MWMC was formed by Eugene, Springfield, and Lane County through an intergovernmental agreement (IGA) in 1977 to provide wastewater collection and treatment services for the' Eugene-Springfield metropolitan area. The seven-member Commission is composed of members appointed by the City Councils of Eugene (3 representatives), Springfield (2 representatives), -and the Lane County Board of Commissioners (2 representatives). Since its inception, the Commission, in accordance with the IGA, has been responsible for oversight of the R WP including: construction, maintenance, and operation of the regional sewerage facilities; adoption of fmancing plans; adoption of budgets, user fees and connection fees; adoption of minimum standards for industrial pretreatment and local sewage collection systems; and recommendations for the expansion of regional facilities to meet future ~ommunity grovvth. Staffmg and services have been provided in various ways over the 31 years ofMWMC's existence; Since 1983, the Commission has contracted' with the Cities of Springfield and Eugene for all staffmg and services necessary to maintain and support the RWP. Lane County's partnership has involved participation on the'Commission and support to ~he Lane County Metropolitan Wastewater Service District (CSD), which managed ~heproceeds and repayment of general obligation bonds issued to construct RWP facilities. Re!!ional Wastewater Pro!!ram Purpose and Kev Outcomes The purpose of the R WP is to protect public health and safety and the environment by providing high quality wastewater management services to the El1gene-Springfield metropolitan area. The MWMC and the regional partners are committed to providing these services in a manner that is effective, efficient, and meets customer service expectations. Since the mid-1990s, the Commission and R WP staff have worked together to identify key outcome areas within which to focus annual work plan and budget priorities. The FY 08-09 R WP work plans and budget reflect a focus on the following key outcomes or goals. In carrying out the daily activities of managing the region81 wastewater system, we will strive to achieve and maintain: 1. High environmental standards; 2. Fiscal management that is effective and efficient; 3. A successful intergovernmental partnership; 4. Maximum reliability and useful life of regional assets and infrastructure; . 5. Public awareness and understanding of MWMC, the regional wastewater system, and MWMC's objectives for maintaining water quality and a sustainable environment The Commission believes that these outcomes, if achieved in the long term, will demonstrate success of the R WP in carrying out its purpose. In order to determine whether we are successful, indicators of performance and targets have been identified for each key outcome. Tracking performance relative to identified targets over time assists in managing theR WP to achieve desired results. The following indicators and performance targets provide an important Page 3 FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 5 of 71 Metropolitan Wastewater Management Commission Overview framework for the development of the FY 08-09 R WP Operating Budget, Capital Improvements Program and associated work plans. Outcome 1: Achieve and maintain high environmental standards. Indicators: Perform$1ce: FY 06-07 FY 07-08 FY 08-09 Actual Estimated Actual Target . Amount of wastewater treated to water quality standards 100 %; 13.87 . 100 %; 13.16 100 %; 14.0 billion gallons billion gallons billion gallons . Compliance with environmental 100% 100% performance requirements of all compliance compliance permits . MWMC target for Biosolids <50% EPA <50% EPA <50% EPA quality met regulated level of 40CFR Part 40CFR Part 40CFR Part contaminants 503.13 ~Table 3 503.13 -Table 3 503.13 -Table 3 Pollutant Pollutant Pollutant Concentrations Concentrations Concentrations . Amount of reclaimed wastewater 809 810 815 beneficially reused (million gallons ) . Performance targets under the 100% of 100% of 100% of Environmental Management numeric EMS numeric EMS numeric EMS System achieved targets met targets met targets met Outcome 2: Achieve and maintainflScal management that is effective and efficient. Indicators: Performance: FY 06-07 FY 07-08 Actual Estimated Actual FY 08-09 Target . Annual Budget and Rates meet Policies Met Policies Met Policies Met MWMC Financial Plan Policies . Annual audited financial Clean Audit Clean Audit Clean Audit statements . Uninsured Bond Rating A A A . Reserves Funded at Target Levels yes yes yes Page 4 FY 08-09 BUDGET AND ClP ATTACHMENT A - Page 6 of 71 Metropolitan Wastewater Management Commission Overview Outcome 3: Achieve and maintain a successful intergovernmental partnership. Indicators: Performance: FYO~07 FY07~8 Actual Estimated Actual FY 08-09 Target . Industrial Pretreatment Program- Implementation in compliance with StatelFederal requirements; any required corrections completed . Wet Weather Flow Management Plan implemented and updated in a timely manner . MWMC Facilities Plan projects consistent with crp budget 100% 100% 100% Update ongomg 100% of projects within budget Outcome 4: Maximize reliability and useful life of regional assets and infrastructure. Indicators: Scheduled Implementation Completed Scheduled Implementation Completed; update initiated 100% of projects within , budget Performance: FY 06-07 FY 07-08 FY 08-09 Actual Estimated Actual Target 84% 84% 90% 98% 98% 98% . Preventive maintenance completed on time (best practices benchmark is 90%) . Planned maintenance as percent of total, maintenance (best practice benchmark is >85%) . Maintain infrastructure in good to excellent condition (rating scale 0 to 5, with 5 being excellent) . Emergency maintenance required (best practices benchmark is 2% of labor hours) . New infrastructure added to maintenance management system in a timely manner No Assessment scheduled for FY 06-07 No Assessment scheduled for FY 07-08 Conduct scheduled maintenance assessment <2% of labor hours < 6 months Page 5' FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 7 of 71 Metropolitan Wastewater Management Commission Overview Outcome 5: Achieve and maintain public awareness and understanding of MWMC, the regional wastewater system, and MWMC's objectives for maintaining water quality and a sustainable environment. Indicators: Performance: FY 07-08 Estimated Actual FY 06-07 Actual FY 08-09 Target ,;~ . MWMC Annual Report . ' Updated MWMC Informational Brochures Produced Produced Produced . Public Information Program for WPCF expansion/upgrades . Presentations made about MWMC and its activities NIA Partial Completion of Portfolio Materials Developed Roadshow Presentation Updated · People participating in MWMC facility tours . MWMC/Biocycle Farm Web sites Complete Portfolio Implement Program 8 Facilities Plan Progress Report Roadshows Conducted 18 of Facility Tours Reviewed for Review for updates monthly updates monthly Roles and ResDonsibilities In order to effectively oversee and manage the R WP, the partner agencies provide all staffing and services to MWMC. The following sections describe the roles and responsibilities of each of the partner agencies, and how intergovernmental coordination occurs on behalf of the Commission. City of Eugene The City of Eugene supports the R WP through representation on MWMC, provision of operation and maintenance services, and active participation on interagency project teams and committees. Three of the seven MWMC members represent Eugene--two citizens and one City Councilor. Pursuant to the IGA, the Eugene Wastewater Division operates and maintains the Regional Water Pollution Control Facility (WPCF), the Biosolids Management Facility (B:MF) and associated residuals and reclaimed water activities, along with regional wastewater pumping stations and transmission sewers. In support of the R WP, the Division also provides technical services for wastewater treatment; management of equipment replacement and infrastructure rehabilitation; biosolids treatment and recycling; industrial source control (in conjunction with Springfield staff); and regional laboratory services for wastewater and water quality analyses. These services are provided under contract with MWMC through the regional funding of 75.57 FTE. Page 6 FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 8 of 71 Metropolitan Wastewater Management Commission Overview City of Springfield The City of Springfield supports the R WP through representation on MWMC, provision of MWMC administration services, and active coordination of and participation on interagency project teams and committees. Two MWMC members represent Springfield--one citizen and one City Councilor. Pursuant to the lGA, the Springfield Public Works Director ahd the Environmental Services Manager serve as the MWMC Executive Officer and General Manager, respectively. The Environmental Services Division and Finance Department staff provide ongoing staff support to the Commission and administration of the R WP in the following areas: legal and risk management services; [mancial management and accounting; coordination and management of public policy; regulatory and permit compliance issues; coordination between the Commission and the governing bodies; long-range capital project planning, design, and construction management; coordination of public information, education, and citizen involvement programs; and coordination and development of regional budgets, rate proposals, and revenue projections., Springfield staff also provides local implementation of the Industrial Pretreatment Progr~, as well as billing coordination and customer service. These services are provided under contract with MWMC through the regional funding of21.05 FTE of Public Works Department staff and .90 FTE of Finance Department staff, as reflected in the adopted FY 08-09 budget. ' Lane County Lane County supports the R WP through representation on MWMC, and by maintaining the CSD when in use. Two MWMC members represent Lane County--one citizen and one County Commissioner. The Board of County Commissioners oversees the CSD, including administration of local General Obligation (GO) bond proceeds and governance of the District. The District was formed, under agreement with MWMC and the partner agencies, to enable long-term fmancmg of regional facilities through issuance of GO bonds. The CSD adopts an annual budget for CSD funds, which is separate from the MWMC budget. The GO bond debt, which was retired in August, 2002, was repaid by CSD through an annual property tax assessment for Eugene and Springfield properties. Sewer users in the unincorporated areas such, as the River Road/Santa Clara area, contributed to bond repayment through an "in-lieu-of-tax charge" (ILOTC). Because the bond debt has been fully repaid, property tax assessments and lLOTC payments are no longer being assessed. Interagency Coordination The effectiveness ofMWMC and the RWP depends on extensive coordination, especially between Springfield and Eugene staff, who provide ongoing program support. This coordination occurs in several ways. The Springfield ESD!M:\VMC General Manager and the Eugene Wastewater Division Director coordinate regularly to ensure adequate communication and consistent implementation of policies and practices as appropriate. The Eugene and Springfield Industrial Pretreatment Program supervisors arid staff meet regularly to ensure consistent implementation of the Model Industrial Pretreatment Ordinance. Additionally, interagency project teams provide input on and coordination of ongoing MWMC administration issues and ad hoc project needs. Page 7 FY 08-09 BUDGET AND ClP ATTACHMENT A - Page 9 of 71 Metropolitan Wastewater Management Commission Overview Exhibit 1 on the following page reflects the interagency coordination structure supporting the RWP. Special project teams are typically formed to manage large projects such as design and construction of new facilities. These interagency staff teams are formulated to provide appropriate expertise, operational knowledge, proj ect management, and intergovernmental representation. Relationship to Eue:ene and SprlDdield Local Sewer Proe:rains The R WP addresses only part of the overall wastewater collection and treatment facilities that serve the Eugene-Springfield metropolitan area. The Cities of Eugene and Springfield both maintain sewer programs that provide for construction and maintenance of local collection systems and pump stations, which discharge to the regional system. Sewer user fees collected by the two cities include both local and R WP rate components. Page 8 FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 10 of 71 Metropolitan Wastewater Management Commission EXIllBIT 1 REGIONAL WASTEWATER PROGRAM INTERAGENCY COORDINATION STRUCTURE EUGENE CITY COUNCIL -", '" SPRINGFIELD CITY COUNC.IL /~ ! " \'-,,- LANE COUNTY' COMMiSSIONERS METROPOLITAN WAST.EWA TER MANAGEMENT COMMISSION Operation & Maintenance Contrad . EUGENE WASTEWATER DIVISION - Regional Facility Operation and Maintenance - Major Rehab & Equipment R~placement - Technical Services - Pump Station and Interceptor Operations and Maintenance - Eugene Pretreatment Program PUBLIC WORKS ADMINISTRATION - Billing and Customer Service MAINTENANCE DIVISION - Regional Sewer Line Support Overview SPRINGFIELD ENVIRONMENTAL SERVICES DrVISION f I I I { \ \ \ \\ - Planning - Capital Construction " - Rates, Revenues - Interagency Coordination - Public Information/Education - Springfield Pretreatment Program - Legal and Risk Services - Sewer User Customer Service FINANCE DEPARTMENT - Accounting & Financial Reporting - Administrative Policy Decisions & Coordination - Capital Project Planning & Coordination -Interagency Issues - Operational Policy Decisions and Coordination - Capital Construction Guidance - Design Standards Development KEY OUTCOMES ACHIEVED Page 9 FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 11 of 71 Metropolitan Wastewater Mana.gement Cqinmission Budget and Program Summary REGIONAL WASTEWATER PROGRAM FY 08-09 BUDGET MWMC's RWP Operating Budget provides the Comniission and governing bodies with an integrated view of the R WP elements. Exhibit 2 provides a summary of the overall Operating Budget. .Separate Springfield and Eugene agency budgets and staffmg also are presented within this budget.document. Major program areas supported by Springfield and Eugene are described in the pages that follow and are summarized in Exhibit 3 on page 12. Finally, Exhibit 4 on page 13 combines revenues, expenditures, and reserves to illustrate how funding for all aspects of the RWP is provided. It should also be noted that the "Amended Budget FY 07-08" column in all budget tables represents the updated FY 07-08 RWP budget as of February 28,2008, which reconciled actual beginning balances at July 1, 2007, and approved budget transfers and supplemental requests. EXHIBIT 2 REGIONAL OPERATING BUDGET SUMMARY: INCLUDING RESERVE CONTRIBUTIONS AMENDED BUDGET CHANGE (1) FY 07-08 INCR/(DECR) FTE 95.67 0.95 Personnel Services (2) $8,089,011 $340,227 4% Materials & Services (2) 5,808,795 457,488 8% Capital Outlay (2,3) 54,500 (31,000) -57% Equip Replacement Contr (4) 696,823 94,143 14% Capital Reserve Contr (5) 4,000,000 , 297,115 7% Working Capital Reserve (6) 900,000 0 0% Rate Stability Reserve Contr (7) 1,510,514 NA NA Operating Reserve (8) 1,425,000 85,000 6% Debt Service (9) 1,234,029 (27,033) -2% Rate Stabilization Reserve Contr (10) 2,000,000 0 NA SRF Loan Reserve (11) 0 500,000 NA Revenue Bond Reserve (12) 0 8,100,000 NA Budget Summary $25,718,672 $1,215,940 50,10 Notes: I 1. The Change column and Percent Change column compare the adopted FY 08-09 budget with the originally Adopted FY 07-08 Budget column. 2. Personnel Services, Materials and Services, and Capital Outlay budget amounts represent combined Springfield and Eugene Operating Budgets that support the R WP. . 3; Capital Outlay does not include CIP, Equipment Replacement, Major Capital Outlay, or Major Rehabilitatio~ which are capital programs. 4. The Equipment Replacement Contribution is a budgeted transfer of operating revenues to "sinking funds" (reserves) for scheduled future replacement of major equipment, vehicles, and computers. See table on , page 22 for year-end balance. Page 10FY 08-09, BUDGET AND elF ATTACHMENT A - Page 12 of 71 Metropolitan Wastewater Management Commission Budget and Program Summary 5. The Capibl Reserve Contribution is a budgeted transfer of operating revenues to "sinking funds" (reserves). Capital is passed through the Springfield Administration Budget. See table on page 24 for year- end balance. ' 6. The Working Capital Reserve acts as a revolving account which is drawn down and replenished on a monthly basis to fund Eugene's and Springfie1d's cash flow needs. 7. The Rate Stability Reserve is used to accumulate revenues available at year-end after the budgeted Operating Reserve target is met. It is budgeted based on projected revenues and expenditures and is intended to lessen the size. of needed rate increases over time. 'See Exhibit 7 on page 21 for year-end balance. 8. The Operating Reserve is used to account for the accumulated operating revenUes net of operations expenditures. The Commission has adopted a policy of maintaining a minimum Operating Reserve balance approximately equal to ,1 0% of the adopted Operating Budget. This targeted level of funding provides for contingency funds in the event unanticipated expenses or revenue shortfalls occur during the budget year. 9. The Debt Service line item is the sum of annual interest and principal payments on the Revenue Bonds and SRF loans made from the Operating Budget (derived from user rates). The total amount of debt service budgeted in FY 08-09 is $1,206,996, the balance of which is budgeted from SDCs. 10. The Rate Stabilization Reserve was established as a result of the 2006 MWMC Revenue Bond Declaration and Covenants. It holds funds,that are available ifneeded, to ensure debt service payments can be made. 11. The SRF loan reserve is being budgeted at 10% of the anticipated loan proceeds. 12. The Revenue Bond Reserves are established to cover both the 2006 bond ($4 million) and the anticipated 2008 bond issue ($4.1 million). The need to establish reserves for both bond issues is driven by changes in the rating of our bond insurer and anticipated market conditions. . Page 11 FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 13 of 71 Metropolitan Wastewater Management Commission Budget ~d Program Summary EXHIBIT 3 REGIONAL W ASTEW ATER PROGRAM OPERATING BUDGET LINElTEM SUM:MARY BY PROGRAM AREA AMENDED ACTUAL BUDGET ' CHANGE SPRINGFIELD FY 06-07 FY 07-08 INCR/(DECR MWMC ADMINISTMTION Personnel Services $1,302,927 $1,465~007 $18,710 1% Materials & Services 1,873,875 2,077,557 68,675 4% Capital Outlay 0 0 0 NA TOTAL $3,176,802 $3,542,564 $87,385 3% INDUSTRIAL PRETREATMENT Personnel Services $193,519 $183,034 $97,095 53% Materials & Services 77,748 79,899 12,547 16% Capital Outlay 0 0 13,500 NA TOTAL $271,267 $262,933 $123,142 47% ACCOUNTING Personnel Services $79,980 ($8,592) -11% Materials & Services 40,732 (25,883 ) -64% Capital Outlay 0 0 NA TOTAL $120,712 ($34,475) -29% TOTAL SPRINGFIELD Personnel Services' $1,728,021 $107,213 6% Materials & Services 2,198,188 55,339 3% C ital Outla 0 13,500 NA TOTAL $3,926,209 $176,052 5% EUGENE ADMINISTRATIVE SERVICES Personnel Services $1,134,884 $1,342,162 80,859 6% Materials & Services 458,735 613,520 112,058 18% Capital Outlay 0 0 0 NA TOTAL $1,593,619 $1,955,682 $192,917 10% BIOSOLIDS MANAGEMENT Personnel Services $994,207 $1,046,855 -3% Materials & Services 765,520 705,441 20% Capital Outlay 66,477 54,500 NA TOTAL $1,826,204 $1,806,796 3% rNDUS~SOURCECONTROL Personnel Services $278,445 $395,488 $73;205 19% Materials & Services 64,518 95,526 16,13 8 17% Capital Outlay 0 0 0 NA TOTAL $342,963 $491,014 $89,343 18% TREA TMENT PLANT Personnel Services $3,370,775 $3,347,441 $152,953 5% Materials & Services 1,993,063 1,900,684 124,615 7% Capital Outlay 112,766 0 10,000 NA TOTAL $5,476,604 $5,248,125 $287,568 5% REGIONAL PUMP STA nONS Personnel Services $53,012 $93,841 ($15,284) -16% Materials & Services 198,445 237,814 6,071 3% Capital Outlay 6,405 0 0 NA TOTAL $257,862 $331,655 ($9,213) -3% SEASONAL INDUSTRIAL WASTE FAC Personnel Services $106,469 $135,203 ($32,410) -24% Materials & Services 50,728 57,622 $3,170 6% Capital Outlay 0 0 $0 NA TOTAL $157,197 $192,825 ($29,240) -15% TOTAL EUGENE Personnel Services $5,937,792 $6,360,990 4% Materials & Services 3,531,009 3,610,607 11% Capital Outlay 179,243 54,500 -82% TOTAL $9,648,044 $10,026,091 6% TOTAL REGIONAL BUDGET Page 12 - FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 14 of 71 Metropolitan Wastewater Management Commission Budget and Program Summary EXHffiIT4 REGIONAL W ASTEW A TER PROGRAM BUDGET SUM:MARY AND COMPARISON AMENDED BUDGET . FY 07-08 $3,913,209 10,026,097 4,000,000 696,823 7,480,702 9,145 1,354,984 $27,480,960 96.62 OPERA TING BUDGET. Administration Operati ons Capital Contribution Equip Repl - Contribution Operating & Revenue Bond Reserves Transfer to General Fund Debt Service Total Operating Budget Funding:: Beginning Balance User Fees Other Total Operating Budget Funding CAPITAL PROGRAM BUDGET . Biosolids - Poplar Plantation Biosolids - Poplar Plantation II Biosolids - Poplar Plantation III Biocycle Farm Hose Reels Biosolids - Line Lagoons I B iosolidg - Line Lagoons II Lab Modification River Avenue Improvements WWFMP Update Support Private Lateral Program Wilakenzie Pump Station Expansion Facility Plan Engineering Services Inffluent Pumping Improvements Dry Weather Headworks Clarifier Improvements Digester Mixing Improvements Waste Activated Sludge Thickening Odorous Air Treatment I Odorous Air Treatment II Aeration Basin Improvements Effluent Reuse I Influent PSlWillakenzie PS/Headworks Biocycle Farm - Poplar Plantation III Outfall Mixing Zone Study Primary Sludge Thickening Parallel Primary/Secondary Treatment Sodium Hypochlorite Conversion Tertiary Filtration I EUGENE Equipment Replacement Purchases Major Rehab Ma. or Ca ital Outla Total Capital Projects Funding: Reimbursement SDC Reserve . 0 NA Improvementment SDC Reserve 0 NA Equipment Replacement 517,834 82,476 Capital Bond Fund 99,303,876 25,145,728 Capital Reserve 408,000 919,000 ,Total Capital Projects Funding $100,229,710 $19,919,534 Notes: * The Change (Inc/Decr) column compares the proposed FY 08-09 budget to the originally adopted FY 07-08 budget column. $6,573,825 19,089,000 1,818,135 $27,480,960 78,238 15,439 3,194,587 498,544 439,077 55,125 6,893,969 737,407 9,464,254 8,667,143 2,884,000 27,379,359 372,000 4,371,000 24,945,087 7,808,647 1,500,000 517,834 408,000 $100,229,710 CHANGE * INC(DECR) $169,052 590,663 297,115 94,143 2,152,544 $1,015,302 2,104,517 165,865 $3,285,684 NA NA NA NA NA NA ,NA (120,796) NA NA 2,756 NA NA NA NA NA 995,549 NA (4,223,129) 427,000 (1,769,293) NA NA (70,000) 20,079,087 (5,381,353) 12,868,000 82,476 630,000 NA $19,919,534 Page 13 FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 15 of 71 Metropolitan Wastewater Management Commission Budget and Program Swnmary , OPERATING BUDGET AND RATE mSTORY The graphs on page 16 show a five-:-year Regional Operating Budget comparison, and Regional Residential Sanitary Sewer costs over a fifteen-year period. Because the Equipment Replacement and Major Infrastructure Rehabilitation programs are managed in the Eugene Operating Budget, these programs are incorporated into both the five-year Regional Operating Budget comparison graph and the Five-Year Capital Pro grains comparison graph on page 43. As shown on the following graph, regional sewer user charges remained highly stable from 1992 through 2004. During the late 1990s, considerable efforts were made' by MWMC to absorb increased costs due to inflation and service level increases through improvements in organizational efficiency and effectiveness. However, as the Regional Wastewater Facilities approached the end of their 'original design lives, and increased regulatory requirements emerged, MWMC completed a comprehensive update to its Facilities Plan in 2004. This Plan demonstrated the need for a significant capital investment in new and expanded facilities to meet environmental performance requirements and capacity to serve the community through 2025. Although a portion of these capital improvements can be funded through system development charges (SDCs), much of the funding for approximately $196 million (in 2006 dollars) in capital improvements over the twenty-year period will come from user charges. Since 2004, this has become the major driver of MWMC's need to increase sewer user rates on an annual basis. The FY 08-09 R WP operating budget is bas~d on an 11 % user rate increase over FY 07-08 rates applied uniformly across all user classes. This rate provides for Operations, Administration, Capital programs, reserves and debt service to be funded at sufficient levels to meet FY 08-09 requirements. It is intended to meet capital and operating requirements, the Commission's Financial Plan policies, and covenants associated with MWMC's 2006 sale of revenue bonds. An 11 % increase in the MWMC user charge will increase the typical residenti~ monthly wastewater bill (based on 5,000 gallons of usage) from $14.21 in FY 07-08 to $15.77 in FY 08- 09. This is an increase of about $1.56 per month. Page 14 FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 16 of 71 Metropolitan Wastewater Management Commission Budget and Program Summary The figure below compares the regional component of average monthly residential seWer cost on several different basis; average usage, actual usage, actual cost, and cost adjusted for inflation. 17.00 15,00 a; 13.00 0 (.) >- 11.00 :2 C 0 9.00 :E 7,00 5.00 3.00 Regional Residential Sanitary Sewer Cost 1993-2009 1994 1995 1996 1997 1998 1999 2000 2001, 2002 2003 2004 2005 2006 2007 2008 2009 Year -II- Cost Based on 5000 gal/mo Usage (Historical method of presentation) -+- Cost based on Actual Residential Usage (Usage is trending downward - from 6300 gal/mo in 1988 to 4900 gal/mo in 2003) ........ Cost Adjusted for Inflation (Based on actual residential usage) 15.00 13.00 11.00 9.00 7.00 5.00 3.00 Page 15 "RY 08-09 BUDGET AND CIP ATTACHMENT A - Page 17 of 71 Metropolitan Wastewater Management Commission Budget and Program Summary 5-YEAR REGJONAL OPERATING BUDGET COMPARISON' $16,000,000 . $13,773,806 $14,540,521 $14,000,000 ''''--''-'----'' . -".. - '------'-'--'--"---'-$1'2~664 ;-568-------..--.....$j3,0.4.0,25,1.----,---,--.. -, ,-.....-..----...--,-..-" $11,616,707 $12,000,000 $10,000,060 $8,000,000 $6,000,000 $4,000,000 $2,000,000 $0 FY 04-05 ' FY 05-06 FY 06-07 FY 07-08 , FY 08-09 Regional Wastewater Capital Improvement Programs 5-Year Comparison $120,000,000 $100,000,000 $96,902,414 $80,000,000 $60,000,000 $40,000,000 $20,000,000 $- , FY 04-05 FY 05-06 FY 06-07 FY 07-D8 FY 08-09 Page 16 'FY 08-09 BUDGET AND eIP ATTACHMENT A - Page 18 of 71 Metropolitan Wastewater Management Commission Staffmg EXHIBIT 5 Regional Wastewater Program * Organization Chart FY 08-09 Notes: CITY OF SPRINGFIELD - Environmental Services Division & Finance Department 21.05 FTE * ** FTE figures represent portions of Eugene and Springfield staff funded by regional wastewater funds. The chart represents groups of staff dedicated to program areas rather than specific positions. Page 1 7 ATTACHMENT A - FY 08-09 BUDGET AND CIP Page 19 of 71 Metropolitan Wastewater Management Commission Staffing EXHIBIT 6 REGIONAL WASTEWATER PROGRAM POSmON SUMMARY BUDGET BUDGET PROPOSED FY 06-07 FY 07-08 FY 08-09 CHANGE CLASSIFICA TION SPRINGFIELD ENVIRONMENTAL SERVICES & FINANCE Public Works Director ESD/MWMC Manager ESD/MWMC Asst. Manager Enviro Services Supervisor/Sewer & Drainage Enviro Services Supervisor/Pretreat & Pollution Prev Supervising Civil Engineer Civil EngineerlDesign & Construction Coordinator Engineering Assistant Public Information & EdQcation Specialist Secretary Clerk II ' Accountant Accounting Manager Engineering Assistant (Special Project) Assistant Proj ect Manager Senior Environmental Technician Environmental Services Technician I Environmental Services Technician II Construction Inspector II TOTAL SPRINGFIELD 0.05 0.75 0.90 0.50 0.95 2.00 5.00 2.35 ,0.65 0.80 0,80 0.80 0.20 1.00 0.00 0.90 0.50 0.00 2.00 20.15 0.05 0.75 0.90 0.50 0.95 2.00 5.00 2.45 0.65 0.80 0.80 0.80 0.20 1.00 0.00 0.90 0.50 0.00 2.00 20.25 0.05 0.75 0.90 0.50 0.95 2.00 5.00 2.45 0.65 0.80 0.80 0.80 0.10 0.00 0.90 0.90 0.50 1.00 2.00 21.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -0.10 -1.00 0.90 0.00 0.00 1.00 0.00 0.80 Note: Springfield's Industrial Pretreatment Program staffing of3.4 FTE is incorporated into the position summary because the Industrial Pretreatment Programs are funded through the R WP. Page 18 FY 08-09 BUDGET AND ClP ATTACHMENT A - Page 20 of 71 Metropolitan Wastewater Management Commission Staffmg EXHIBIT 6 (Continued) REGIONAL W ASTEW A TER PROGRAM POSITION SUM:MARY BUDGET BUDGET PROPOSED CLASSIFICATION FY 06-07 FY 07-08 FY 08-09 CHANGE EUGENE W ASTEW ATER DNISION & OTHER PW Division Director 0.84 0.80 0.80 0.00 Operations Manager 0.82 0.82 0.82 .0.0.0 Business Manager 0.89 0.89 0.89 0.00 Pretreatment/Laboratory/Sampling Supervisor 0.79 0.79 0.82 0.03 Operations Supervisor 1.00 1.00 1.00 0.00 Residuals Supervisor 1.00 . 1.00 1.00 0.00 Pump Station Supervisor 0.10 0.35 0.20 -0.15 Electrical Maintenance Supervisor 0.00 0.00 0.89 0.89 Equipment Maintenance Supervisor 0.97 0.97 1.00 0.03 Facilities Supervisor 0.93 0.93 1.00 0.07 Parts and Supply Supervisor/Buyer 0.89 0.89 0.89 0.00 Environmental Data Analyst 0.68 0.65 0.65 0.00 Health and Safety Supervisor 0.89 0.89 0.89 ,0.00 Technical Servjces Analyst 0.89 0.89 0~89 0.00 P:roject Specialist 0.93 0.93 0.93 0.00 PW Financial Services Manager 0.00 0.00 0.20 0.20 PW Maintenance Supervisor 0.05 ,0.05 0.05 0.00 Applications System Analyst 1.78 i67 2.67 0.00 Applications Support Technician 1.39 ' 0.50 0.50 0.00 Computer Maintenance Management Specialist 0.00 0.89 0.00 -0.89 Tech Specialist 2 0.35 0.35 0.35 0.00 Wastewater Techniciat;l (Operator) 15.00 15.00 15.00 0.00 Wastewater Technician (Residuals) 5.00 5.00 5.00 0.00 Wastewater Technician (pretreatment) 3.17 3.17 3.14 -0.03 Wastewater Technician (Laboratory) 4.73 4.73 4.75 0.00 Wastewater Technician (Sampling) 1.85 1.85 1.89 0.04 Wastewater Technician (Mechanical) 7.00 7.18 8.18 1.00 Wastewater InstrumentlElectrician 3.88 3.88 3.88 ,0.00 Electrician 1.97 1.97 1.00 -0.97 Maint Worker 9.43 9.43 9.36 -0.07 Billing Specialist 0.75 1.00 1.00 0.00 Program Coordinator 0.00 0.00 0.89 0.89 Admin Specialist, Sr 0.89 0.89 0.89 0.00 Admin Specialist 1.78 2.28 1.39 ,:,0.89 Parts and Supply Specialist 1.78 1.78 1.78 0.00 Custodial Worker 1.00 1.00 1.00 0.00 TOTAL 73.42 75.42 75.57 0.15 GRAND TOTAL BOTH CITIES 93.57 95.67 96.62 0.95 Page 19 FY08-09 BUDGET AND eIP ATTACHMENT A - Page 21 of 71 Metropolitan Wastewater Management Commission Reserves REGIONAL WASTEWATER PROGRAM RESERVES The RWP maintains reserve funds for dedicated purpose to sustain stable rate's while fully funding operating and capital needs. Commission policies and guidance, which direct the amount of reserves appropriated on an annual basis, are found in the MWMC Financial Plan (2005). Further details on the FY 08~09 reserves are provided below. OPERATING RESERVES The MWMC Operating Budget includes four separate reserves: the working capital reserve, rate stability reserve, rate stabilization reserve, and the operating reserve. ' Revenues are appropriated across the reserves in accordance with Commission policy and expenditure needs. Each reserve i~ explained in detail below. WORKING CAPITAL RESERVE The Working Capital Reserve acts as a revolving account that is drawn down and replenished on a m~ntbly basis to provide funds for payment of Springfield Administration and Eugene Operations costs prior to the receipt of user fees from the Springfield Utility Board and Eugene' Water and Electric Board. The Working Capital Reserve is set at $900,000 for FY 08-09, $200,000 of which is dedicated to Administration and $700,000 is dedicated to Operations. RATE STABILITY RESERVE The Rate Stability Reserve was established to implement the Commission's objective of maintaining stable rates. It is intended to hold revenues in excess of the current year's operating and capital requirements for use in future years, in order to avoid "rate spikes." The amount budgeted on an annual basis varies in response to the variability of actual revenues net of expenses, and annual budgeted amounts for the operating and capital reserves. For FY 08-09 the Rate Stability Reserve will be drawn down by $1,626,552 in order to moderate the rate increase necessary to fund FY 08-09 expense. The year-end balance is budgeted at $1,529,150. . STATE REVOLVING FUND RESERVE The State Revolving Fund (SRF) Reserve was established in accordance with SRF loan covenant requirements. In order to secure an SRF loan, sufficient reserves are created to provide assurances that adequate revenue coverage will be provided for future debt service payments. The reserve amount is set at 10% of the loan proceeds and is transferred to the operating reserves from the capital fund. For FY 08-09, the SRF Reserve is budgeted at $500,000 in anticipation of receiving a $5;000,000 SRF loan for capital projects. RATE STABILIZATION RESERVE The Rate Stabilization Reserve contains funds to be used at any point in the future when net revenues are insufficient to meet the bond covenant coverage requirement. The Commission Page 20 . FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 22 of 71 Metropolitan W ast~water Management Commission Reserves shall maintain the Rate Stabilization account as long as bonds are outstanding. In FY 08-09 no additional contribution to this reserve is budgeted and the balance at June 30,2009 will remain at $2,000,000. OPERATlNG RESERVE The Operating Reserve is used to account for accumulated operating revenues net of operating expenditures (including other reserves)., The Commission's adopted policy is to budget the Operating Reserve at approximately 10% of the adopted operating budget. For FY 08-09, the Operating Reserve is budgeted at $1,460,000, which is 10% of total Personal Services, Materials and'Services, and Capital Outlay in accordance with Commission policy. EXIllBIT 7 ADOPTED AMENDED PROPOSED BUDGET BUDGET BUDGET OPERATING RESERVES FY 07-08 FY 07-08 FY 08-09 Beginning Balance 7,133,629 6,573,825 8,148,931 User Fee Revenue 18,635,400 18,635,400 20,899,367 Septage Revenue 453,600 453,600 294,150 Other Revenue 1,591,635 1,597,135 1,648,500 Interest 221,000 221,000 330,000 Personal Services (8,089,011) (8,089,011) (8,429,238) Materials & Services (5,624,295) (5,795,795) (6,074,783) Capital Outlay (54,500) (54,500) (23,500) Interfund Transfers (4,705,968) (4,705,968) (9,197,281) Transfer to Bond Debt Service Fund (I,234,029) (1,354,984) (1,033,696) Debt Service - SRF Loan 0 0 (173,300) WORKING CAPITAL (900,000) (900,000) (900,000) RATE STABILITY RESERVE (4,052,461 ) (3,155,702) (1,529,150) RATE STABILIZATION RESERVE (2,000,000) (2,000,000) (2,000,000) STATE REVOLVING FUND LOAN RESERVE 0 0 (500,000) OPERATING RESERVE 1,375,000 1,425,000 1,460,000 CAPITAL RESERVES The MWMC Capital Budget includes five reserves: the Equipment Replacement Reserve, SDC Reserves (i.e. Reimbursement and Improvement), the Capital Reserve and the Bond Reserve. These reserVes accumulate revenue to help fund capital projects including equipment replacement and major rehabilitation. They are funded by annual contributions from user rates, SDCs, bond proceeds, and SRF loans. Each reserve is explained in detail below. EQUIPMENT REPLACEMENT RESERVE The Equipment Replacement Reserve accumulates replacement funding for three types of equipment: 1) major/stationary equipment items costing less than $200,000 with useful lives of Page 21 - FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 23 of 71 Metropolitan Wastewater Management Commission Reserves 20 years or less; 2) fleet vehicles maintained by the Eugene Wastewater Division; and 3) computers that serve the Eugene Wastewater Division. Contributions to the Equipment Replacement Reserve in the FY 08-09 budget total $790,966 additional budget detail is provided below. The Equipment Replacement Reserve is intended to accumulate funds necessary to provide for the timely replacement or rehabili~tion of equipment, and may also be borrowed against to provide short-term fmancing of capital improvements. An annual analysis is performed on the Equipment Replacement Reserve. The annual contribution is set so that all projected replacements will be funded over a 20-year period and at the end of the 20-year period, the reserve will contain replacement funds for all equipment projected to be in use at that time. Estimates used in the analysis include interest earnings, inflation rates and useful lives for the equipment. ADOPTED AMENDED PROPOSED BUDGET BUDGET BUDGET EQUIPMENT REPLACEMENT RESERVE FY 07-08 FY 07-08 FY 08-09 Beginning Balance ~,130,191 5,127,836 5,872,047 Reserve Allocation Correction 0 0 2,311,929 Annual Equipment Contribution 436,536 436,536 516,184 Annual VehicIe Contribution 242,034 242,034 242,034 Annual Computer Contribution 18,253 18,253 32,748 Interest 230,000 230,000 210,000 Fund Equip Repl in Projects 0 0 (282,000) Equipment Purchases (486,534) (517,834) (569,010) Reserve 5,570,480 5,536,825 8,333,932 * To correct reserve allocation between capital and equipment replacement previously not adjusted to equipment replacement model. SYSTEM DEVELOPMENT CHARGE (SDC) RESERVES SDCs are required as part of the MWMC IGA. They are connection fees charged to new users to recover the costs related to system capacity, and are limited to funding Capital Programs. The purpose of the SDC Reserves is to collect and account for SDC revenues separately from other revenue sources, in accordance with Oregon statutes. The Commission's SDC structure includes a combination of "Reimbursement" and "Improvement" fee components. Estimated SDC revenues for FY 08-09 total $1,770,000. Budgeted expenditures include $1,633,696 from Reimbursement Fees and $2,233,696 from Improvement Fees to fund portions of the annual debt service payments on the 2006 revenue bonds. The projected beginning SDC Reserve balance on July 1, 2008 is $11,883,230. Page 22 . - FY 08-09 BUDGET AND ClP ATTACHMENT A - Page 24 of 71 Metropolitan Wastewater Management Commission Reserves ADOPTED ANIENDED PROPOSED BUDGET BUDGET BUDGET REIMBURSEMENT SDC RESERVE FY 07-08 FY 07-08 FY 08-09 Beginning Balance 5,039,799 5,341,142 4,433,210 Reimbursement SDCs Collected 155,000 155,000 155,000 Interest 220,000 220,000 301,000 Xfr to Debt Service (Fund 312) ( 1,234,029) (1,354,984) (1,633,696) Materials & Services (1,500) (8,500) (8,500) SDC Contingency Reserve 0,240,000) 0 0 Resenre 2,939,270 4,352,658 3,247,014 ADOPTED Al\1ENDED PROPOSED BUDGET BUDGET BUDGET IMPROVEMENT SDC RESERVE FY 07-08 FY 07-08 FY 08-09 Beginning Balance 5,777,958 6,796,832 7,450,020 Improvement SDCs Collected 1,615,000 1,615,000 1,615,000 Interest / 221,000 221,000 400,000 Materials & Services (4,500) (4,500) ( 4,500) Xfr to Debt Service (Fund 312 ) , (1,234,030) (1,354,985) (2,233,696) SDC Contingency Litigation Reserve ' (2,555,000) 0 0 Reserve 3,820,428 7,273,347 7,226,824 CAPITAL RESERVE The Capital Reserve accumulates funds transferred from the Operating Reserve for the purpose of funding the CIP, Major Capital Outlay and Major Rehabilitation Program costs. The intent is to collect sufficient funds over time to construct a portion of planned capital projects with cash in an appropriate balance with projects that are funded with debt fmancing. The FY 08-09 Budget includes a contribution from the Operating Reserve of$4,297,115. The beginning balance on July 1,2008 is projected to be $33,9~9,184. Additional budget detail on the CIP, Major Capital Outlay and Major Rehabilitation Program reserves is provided on the following page. BOND RESERVE The Bond Reserve was created to provide assurances to the bond holders that adequate revenue coverage will be provided for future debt service payments. For FY 08-09 the Bond Reserve is budgeted at $8,100,000 in order to meet reserve requirements of the bond issuances ($4,100,000 for 06 issuance and $4,000,000 for anticipated 08 issuance). Page 23 FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 25 of 71 Metropolitan Wastewater Management Commission Reserves ADOPTED AMENDED PROPOSED BUDGET. BUDGET BUDGET CAPITAL RESERVES FY 07-08 FY 07-08 FY 08-09 Beginning Balance 47,788,486 53,207,410 33,929,184 Reserve Allocation Correction 0 0 (2,311,929) Transfer from Operating Reserve 4,000,000 4,000,000 4,297,115 Transfer to fund FY 06 Revenue Bond Reserve 0 0 4,100,000 Interest 231,000 231,000 350,000 Interest income (Revenue Bond Proceeds) 900,000 900,000 1,100,000 State Marine Board Grant 0 0 80,000 Revenue Bond Sale & SRF Proceeds 50,000,000 50,000,000 86,000,000 Miscellaneous Receipts 1,000 1 ,000 400 Bond Sale Expense 0 0 (350,000) Bond Insurance 0 0 (250,000) Transfer from Equipment Relacement 0 0 282,000 Funding For Capital Improvement Projects (76,226,346) (99,303,876) (95,144,404) Fund~g For Major Rehabilitation (270,000) (408,000) (900,000) Funding For Maj or Capital Outlay 0 0 (289,000) Revenue Bond Reserve 0 0 (8,100,000) Capital Reserve 26,424,140 8,627,534 22,793,366 * * To correct reserve allocation between capital and equipment replacement previously not adjusted to equipment replacement model. Page 24' FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 26 of 71 Metropolitan Wastewater Management Commission Springfield Budget Detail CITY OF SPRINGFIELD REGIONAL WASTEWATER PROGRAM RESPONSIBILITIES The City of Springfield manages administration services for the R WP under a contract with the MWMC. The programs maintained by Springfield to support the R WP are summarized below and are followed by Springfield's regional wastewater budget summaries. Activities, and therefore program budgets, for MWMC administration vary from year to year depending upon the major construction projects and special initiatives undenyay., A list of the capital projects Springfield staff will support in FY 08-09 is provided in Exhibit 3 on page 12. MWMC ADMINISTRATION The Springfield Environmental Services Division and Finance Department provide ongoing support and management services' for MWMC. The Public Works Director and the Environmental Services Manager serve as the MWMC Executive Officer and General Manager, respectively. Springfield provides the following administration functions: [mancial planning management, accounting and [mancial reporting; risk management and legal services; coordination and management of public policy; coordination and management of regulatory and permit compliance issues; coordination between the Commission and the governing bodies; long-range capital project planning and construction management; coordination of public information, education, and citizen involvement programs; sewer user customer service; and coordination and development of regional budgets, rate proposals, and reVenue projections. INDUSTRIAL PRETREAT:MENT (SOURCE CONTROL) PROGRAM The Industrial Pretreatment Program is a regional activity implemented jointly by the cities of Eugene and Springfield. The Industrial Pretreatment section of the ESD'is charged with administering the program for the regulation and oversight of wastewater discharged to the sanitary collection system by industries in Springfield. This section is responsible for ensuring that these wastes do not damage the collection system, interfere with wastewater treatment processes, result in the pass-through of harmful pollutants to treated effluent or biosolids, or threaten worker health or safety. Tbis responsibility is fulfilled, in part, by the use of a permit system for industrial dischargers. This permit system, common to both Eugene and Springfield, implements necessary limitations on waste characteristics and establishes inspection, monitoring, and reporting requirements for documenting waste quality and quantity controls. The Industrial Pretreatment section is also responsible for locating new industrial discharges in Springfield and evaluating the impact of those discharges on the regional WPCF. As of February 2008, there were 17 significant industrial users under permit in Springfield. The Industrial Pretreatment Program also addresses the wastewater discharges of some commercial/industrial businesses through the development and implementation of Pollution Management Practices. Pretreatment program staff also coordinates pollution prevention activities in cooperation with the Pollution Prevention Coalition of Lane County. Page 25 FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 27 of 71 Metropolitan Wastewater Management Commission Springfield Budget Detail ACCOUNTING & FINANCIAL REPORTING Accounting and fmancial reporting services for the R WP are provided by the Accounting section ,in the Springfield Finance Department, in coordination with ESD. Springfield Accounting staff maintain grant and contract accounting systems, as well as compliance with all local, State and Federal accounting and reporting requirements for MWMC finances. This section also assists ESD with preparation of the MWMC budget, capital financing documents, sewer user rates, and financial policies and procedures. PROGRAMS AND SIGNIFICANT SERVICEIEXPENDITURE CHANGES In FY 08-09, the City of Springfield will support the following major regional initiatives in addition to ongoing Commission administration and industrial pretreatment activities: · Continue to implement the W et Weather Flow Management Plan (WWFJv1P), including flow monitoring, 'data tracking, and regional coordination, and manage the update of the WWFJv1P, which was adopted in 2001. · Implement Capital Financing strategies necessary to meet current revenue bond obligations, prepare for additional debt fmancing, and ensure sufficient revenues in accordance with the 2005 MWMC Financial Plan. · Complete a Poplar Marketing and Harvest Plan, which was initiated in FY 07-08. · Continue implementation of the 2004 MWMC Facilities Plan to meet all regulatory requirements and capacity needs. · Continue public information and outreach activities focused on the MWMC Facilities Plan and MWMC work to maintain river health. · Complete a reclaimed water end-use market/feasibility study and capital plan, which was initiated in FY 07-08. · Initiate a MWMCcost-of-service analysis leading to modifications to MWMC's rate . structure in accordance with MWMC rate setting poliCies. This was deferred from FY 07-08. . Review and update the local industrial discharge limits to address compliance with MWMC's NPDES permit, and implement mandatory EPA streamlining r~quirements. · Protect RWP interests through participation in Association of Clean Water Agencies activities and Board of Directors.. . Continue participation in the Pollution Prevention Coalition of Lane County. . Complete and submit required NPDES permit compliance plans associated with an anticipated new wastewater discharge permit, including,an Inflow Removal Plan, and a TMDL Implementation Plan. . . Provide litigation support. . Review agent of record services. . Coordinate TMDL compliance planning and implementation efforts. Page 26FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 28 of 71 Metropolitan Wastewater Management Commission Springfield Budget Detail SIGNIFICANT CHANGES FOR FY 08-09 The budget for Springfield Personnel Services, Materials and Services, and Capital Outlay for FY 08-09 totals $3,923,761 representing an overall decre~e of $2,448 over the amended FY 07-08 budget (-.06%). Personnel Services Personnel Services tqta1ing $1,835,234 represent an FY 08-09 increase of$107,213 or 6% over the originally adopted FY 07-08 budget. Staffmg . A net increase of .80. FTE is included in the FY 08-09 budget. 1.0 Environmental Services Technician II - Thjs position will be added to the Industrial Pretreatment Program to address increased industrial permitting activity and improvements needed in the fats, oils and grease, and photo processor pollution management programs. -0.20 Fund Reallocation - Based on review of current and projected staffmg allocations to RWP activities, the FY 08-09 budget includes a decrease of .10 FTE to RWP of the Accounting Manager, and .10 Assistant Project Manager (Reclassified from Engineering Assistant mid-year FY 07-08). Regular Wages -$1,280,061 [Increase of $124,395 or 11 0/0] · This increase represents merit increases, a projected 3 % cost of living mcrease, and the net increase of .80 FTE. Employee Benefits - Budget Request $545,968 [Increase $45,698 or 90/0 ] '. Benefits for FY 08-09 increase by 9%. Materials and Services The Materials and Services budget represents a total FY 08-09 increase of$55,339 or 3% over the originally adopted FY 07-08 budget., The major changes are in the following budget categories: Billing & Collection -$501,195 [Increase of $92,130 or 23010] · Billing and Collection costs are projected to increase based on an estimated 18% increase in Eugene Water & Electric Board costs and based on a 1 % growth in customers. For Springfield customers, these costs are only projected to increase by a 1 % growth in accounts. Page 27 ~y 08-09 BUDGET AND elF ATTACHMENT A - Page 29 of 71 Metropolitan Wastewater Management Commission Springfield Budget Detail Litigation Expense -$150,000 [Decrease of $50,000 or 250~ under originally adopted FY 07- 08 budget] · The reduction of $50,000 to the Litigation Expense budget is related to the final resol:ution of suits fued against the MWMC and the Cities by the Home Builders-Association of Lane County and by Oregon River Watch. Capital Outlay - $13,500 [There were no Capital Outlay purchased in FY 07-08] · The Capital Outlay budget for FY 08-09 includes a portion of the field vehicle dedicated in part, to the Industrial Pretreatment Program. EXHIBIT 8 SPRINGFIELD ADMINlSTRATION PROGRAM PROPOSED FY 08-09 BUDGET SUMMARY AMENDED ACTUAL BUDGET CHANGE * FY 06-07' FY 07-08 INCR/(DECR) Personnel Services $1,575,538 $1,728,021 $107,213 6% Materials & Services 1,996,600 2,198,188 55,339 3% Capital Outlay 0 0 13,500 NA Budget Summary $3,572,138 $3,926,209 $176,052 5% S-YEAR MWMC ADOPTED BUDGET COMPARISON SPRINGFIELD ADMINISTRATION $4,500,000 $4,000,000 $3,500,000 $3,000,000 $2,500,000 $2,000,000 $1,500,000 $1,000,000 $500,000 $0 --,-'-----,'$3il4+-;ro9---~.J~?],.z~.1--- ______________,_______ .n.'__._._______, ______.__,_~~!~~!,~}~______h $2,726,362 FY 04-05 , FY 07...08 ' Note: * Change column and Percent Change column compare proposed FY 08-09 budget to originally adopted FY 07-08 budget. Page 28 , FY 08-09 BUDGET AND eIP ATTACHMENT A - Page 30 of 71 Metropolitan Wastewater Management Commission Springfield Budget Detail ACTUAL CHANGE PERSONNEL SERVICES FY 06-07 INCR/(DECR Regular Wages $1,105,564 $124,395 .11% Overtime 5,500 (4) 0% Employee Benetits 460,742 45,698 9% Cell Phone Allowance 3,600 685 24% Pers Services Adjustments 0 (21.751) NA Comp Time Payoff 0 (41,822) NA Car Allowance 132 12 9% Total Personnel Services $1,575~538 $107~213 60/0 FTE 20.15 0.80 MATERIALS & SERVICES Billing & ColI Exp 382,000 92.130 23% Contractual Services 226.000 (12.000) -5% Litigation Expense 200.000 ' (50,000) -25% Environmental Ed 5.000 0 0% Attorney Fees 110,000 0 0% Merchant Fees 2.750 7.000 80% PP&L Insurance 291,500 0 0% Telephone 2.426 10 0% Ris/ Airs/Geo Charges 10.805 392 3% Computer Equipment 0 1.550 NA Advertising 4.500 1.300 29% Duplicating Supplies 2.450 (100) -4% Printing 9.500 0 0% Travel & Meeting Expenses 29,671 6.450 21% Property Taxes 6,000 0 0% WPCF /NPDES Permits 98.550 11,120 11% Pretreatment Supplies 3,500 0 0% Safety Clothing/Eq 700 250 25% Gasoline & Oil 2.000 750 38% Utilities 9.224 0 0% Memberships. Books, Subscrips 16,799 1,048 6% Postage & Shipping Charges 3.500 0 0% Office Supplies 10.933 (2.500) -27% Computer Software 80.441 01.410) -25% Small Furniture & Appliances 3,000 1.500 100% Commuter Trip Reduction 0 0 0% Program Expense 37.851 ' 500 1% Equipment Maintenance 9.600 0 0% Property Maintenance' 3.530 500 50% Employee Development 26.505 2,350 8% Internal Insurance Chgs 23.279 9,785 21% Internal Veh Mt Chgs 3.532 (1,325) -36% Internal Fac Rent 42,992 (7.695) -18% Computer Equip Chgs 7,835 1.233 13% Bldg Maint Chgs 34,993 8,149 27% Internal Veh & Equip Rent 6,618 434 6% Internal Employee Benefit 16.086 1.207 7% License & Fee Refunds 5.267 (26) 0% Internal MS Enterprise Agreement 13.250 0 NA Indirect Costs 254.013 7.263 -3% Total Materials & Services $1~996~600 $55~339 30/0 CAPITAL OUTLAY Total Capital Outlay 0 13.500 NA TOTAL $3,572,138 $176,052 50/0 Page 29 FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 31 of 71 Metropolitan Wastewater Management Commission Eugene Budget Detail CITY OF EUGENE REGIONAL WASTEWATER PROGRAM RESPONSffiILITIES The Wastewater Division for the City of Eugene manages all regional wastewater pollution control facilities serving the Eugene/Springfield and River Road/Santa Clara areas under the Intergovernmental Agreement for the Metropolitan Wastewater Management Commission (MWMC). These regional facilities include the Eugene/Springfield Regional Water Pollution Control Facility (WPCF), the 154 acre Biosolids Management Facility, the 286 acre Seasonal Industrial Waste Facility, the 600 acre Biocycle Farm site, and regional wastewater pumping stations and transmission sewers. In support of the water pollution control progTam, the Division also provides technical services for wastewater treatment, management of equipment replacement and infrastructure rehabilitation, biosolids treatment and recycling, an industrial source control and pretreatment program in conjunction with City of Springfield staff, regional laboratory services for wastewater and water quality analyses, and flow monitoring on the regional sanitary trunk sewers. ADMINISTRATIVE AND MANAGEMENT SERVICES Administrative Services provides management, administrative, and office support to the Wastewater Division. This support includes the general planning, directing, and managing of the activities of the Division; development and coordination of the budget; administration of personnel records; and processing of payroll, accounts payable, and accounts receivable. This section also provides tracking and monitoring of all assets for the regional wastewater treatment facilities and clerical support for reception, telephone services, and 'other miscellaneous needs. The Administrative services include oversight and coordination of the Division's Environmental Management System, safety, and training programs. Another area this program administers is the coordination of local and regional billing and rate activities. REGIONAL WASTEWATER TREATMENT FACILITY OPERATIONS The W astewat~r Division operates theWPCF to treat domestic and industrial liquid wastes to achieve an effluent quality that protects and sustains the beneficial uses of the Willamette River. The WPCF is designed to treat 49 million gallons per day (mgd) of dry weather flow, with a peak hydraulic capacity of 105 mgd f~r full secondary treatment. The Operations section optimizes wastewater treatment processes to ensure effluent quality requirements are met in an effective manner. 'In addition, the Operations section provides 24 hour per day monitoring of the alann functions for all plant processes, regional and local pump stations, and the Biosolids and Seasonal Industrial Waste Facilities. REGIONAL WASTEWATER TREATMENT FACILITY MAINTENANCE The Maintenance section of the Wastewater Division is responsible for preservation of the multi-million dollar investment in the equipment and infrastructure of the WPCF. This section provides a preventative maintenance program to maximize equipment life and performance; a Page 30 FY 08.,09 BUDGET AND CIP ATTACHMENT A,- Page 32 of 71 ... .. . .' ! I Metropolitan WastewatetManagement Commission Eugene Budget Detail corrective maintenance program for repairing unanticipated equipment failures; a facility maintenance program to maintain the buildings, treatment structures, and grounds;" and a stores unit that purchaSes and stocks parts and supplies and assists with professional services contracting. Also included within the Maintenance section's charge are the pump stations and sewers in the regional and local collection system, and the facilities and equipment at'the Biosolids Management and Seasonal Industrial Waste Facilities. BIOSOLIDS MANAGEMENT The Residuals Management section of the Wastewater Division manages the handling and , beneficial reuse of the biological solids (biosolids) produced as a result of the activated sludge treatment of wastewater. This section operates the B:MF and Biocycle Farm located at Awbrey Lane in Eugene. Approximately 5,000 dry tons ofbiosolids are produced annually by the WPCF. These biosolids are treated using anaerobic digestion, st<?red in facultative lagoons (which provide some additional treatment benefits), and then processed ,through a belt filter press and air-dried to reduce the water content and facilitate transport. ,The dried material is ultimately applied to agricultural land or irrigated on the poplar trees at the Biocycle Farm as a beneficial fertilizer and soil conditioner. This section,also manages the Seasonal Industrial Waste (SIW) facility, which formerly served to treat wastewater from food processing operations. INDUSTRIAL SOURCE CONTROL (Pretreatment) and ANAL YTICAL SERVICES~ SAMPLING TEAM The pretreatment program is a regional activity implemented jointly by the cities of Eugene and Springfield. The Industrial Source Control group of the Wastewater Division is charged with administering the pretreatment program for the regulation and oversight of commercial and industrial wastewaters discharged to the sanitary collection system by fixed-site industries in Eugene and by mobile waste haulers in the Eugene and Springfield areas. This group is also responsible for ensuring that these wastes do not damage the collection system, interfere with wastewater treatment processes, result in the pass-through ofhannful pollutants to treated effluent or biosolids, or threaten worker health or safety. This responsibility is fulfilled through the use of a permit system for industrial dischargers. This permit system, common to both Eugene and Springfield, implements necessary limitations on waste 'characteristics and establishes inspection, monitoring, and reporting requirements for documenting waste quality and quantity controls. The staff is also responsible for locating new industrial discharges in Eugene and evaluating the impact of new non-residential discharges on the WPCF. As of December 2007, there were 20 significant industrial users under permit iD. Eugene. The section also has responsibilities related to environmental spill response activities. The Analytical Services group provides necessary analytical work in support of wastewater treatment, residuals management, industrial source control, stormwater monitoring, and special project activities of the Wastewater Division. The laboratory's services include sample handling and analyses of influent sewage, treated wastewater, biosolids, industrial wastes, stormwater, and groundwater. Information from the laboratory is used to make treatment Page 31u FY 08-09 BUDGET AND ClP ATTACHMENT A - Page 33 of 71 Metropolitan Wastewater Management Commission Eugene Budget Detail process control decisions, document compliance with regulatory requirements, ,demonstrate environmental protection, and ensure worker health and safety. The Sampling Team is responsible for all of the sampling activities related to regional wastewater program functions. These include the Eugene pretreatment program, wastewater treatment process control, effiuentand ambient water quality, groundwater quality, facultative sludge lagoons, and stormwater samples. The Division's Environmental Data Analyst evaluates and reports on the sampling data for various programs. MANAGEMENT INFORMATION SERVICES (MIS) The MIS section provides services for electronic data gathering, analysis, and reporting as necessary in compliance with regulatory requirements and management. functions. This section also maintains the electronic communication linkages with the City of Eugene and the Regional Information System, and supplies technical expertise and assistance in the selection, operation, and modification of computer systems (hardware and software) within the Division. PROJECT MANAGEMENT Management of wastewater system improvements and ongoing 'developments is carried out by the Project Management staff. Activities include coordination of CIP activities with the City of Springfield staff, problem-solving and action recommendations, project management? technical research, coordination of activities related t6 renewal of the NPDES wastewater discharge permit, computer-aided design and ,electronic storage of design drawings, and planning of projects to anticipate and prepare for new regulatory and operational requirements. The Project Management staff develops Request for Proposals and Request for Quotes" coordinates special proj ect activities between work sections, and coordinates the procurement of building permits as necessary in support of project activities. PROGRAMS AND SIGNIFICANT SERVICEIEXPENDITURE CHANGES In FY 08-09, Eugene staffwill support the following major regional initiatives in addition to ongoing operational activities. · Continue efforts to optimize service effectiveness and efficiency, and further develop performance measurement and tracking systems (through implementation of a Balanced ,Scorecard approach to defIDing and managing organizational objectives). · Manage the Operations & Maintenance (O&M) aspects of the Biocycle Farm, continuing the development of the biosolids irrigation practices and poplar tree management. · Manage the O&M responsibilities of the NPDES penmts for the wastewater discharge and treatment plant stormwater programs and the LRAP A air emissions permit for the regional wastewater treatment plant. · Work cooperatively on the CIP elements and effectively integrate capital project work with, ongoing O&M activities, with emphasis on maintaining an effective CIP management and coordination program with Springfield. · Provide technical input and O&M assessments related to proposed initiatives for addressing TMDL compliance, greenhouse gas emission controls, and renewable energy objectives. Page 32 .; FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 34 of 71 Metropolitan Wastewater Management Commission Eugene Budget Detail · Continue to evaluate impacts of regulatory actions (such as the federal SSO and blending policy development, Willamette River TMDLs implementation, and any newly adopted state water quality standards) upon operational responsibilities. · Complete scheduled major rehabilitation and equipment replacement projects in an efficient and timely manner. · Complete major steps in the effective use of the maintenance management program, including updating of the computerized maintenance management system for maintenance scheduling, asset information, reporting, and monitoring performance. SIGNIFICANT CHANGES FOR FY 08-09 The proposed budget for Operations and Maintenance of the regional wastewater treatment facilities (personnel,. materials and services, and capital outlay) forFY 08-09 totals $10,616,760. The budget categories show a total 6% increase from the FY 07-08 budget. Significant changes proposed for the FY 08-09 Operations and Maintenance budget as compared to the FY 07-08 budget include: Personnel Services Personnel Services totaling $6,594,004 represents a FY 08-09 increase of$233,014 or 4%. The major changes are in the following budget categories: Statrme . A net budget increase of 0.15 FTE is included in the FY 08-09 budget. 0.20 Financial Services Manager -This is an allocation of a position which provides centralized coordination for the financial management services of the Public Works Department, including budget development and monitoring, strategic financial planning, financial management and analysis. (0.05) Fund ReallocatioDS - During the preparation of the annual budget proposal, the distribution of FTE hours for regional and non-regional activities from the previous year are reviewed and adjustments are made to the proposec;l year's budget. This is done to project proper charges of staffing based on actual time spent between the regional and local funds. ' Regular Wages - $4,166,834 [Increase of $161,201 or 40h>>] . Salaries are based upon negotiated management/labor contracts between the City of Eugene and the local union (AFSCME). The Cost of Living (COLA) is projected at 2.8%. The increase also includes the FTE adjustments described above and annual merit raises as applicable. Employee Benefits - $1,398,587 [Increase of $52,331 or 40h>>] . The increase in employee benefits is driven by a increase in payroll costs for PERS ' contributions. Page 33,FY 08-09 BUDGET AND ClP ATTACHMENT A - Page 35 of. 71 Metropolitan Wastewater Management Commission Eugene Budget Detail Materials and Services The proposed Materials and Services budget totaling $4,012,756 represents a total FY 08-09 increase of $402,149 which is 11 %. The major changes are in the following budget categories: Fleet Operating Charges - $256,Ot9 [Decrease of ($31,868) or (110/0)] . Each year fleet rates are estimated by proportioning historic costs by vehicle, category. The decrease in this line item is due to a reduction of Fleet Rates on some vehicle categories. Maintenance'ofEquipment & Facilities - $381,999 '[Increase of $88,252 or 300h.] . The increase is primarily due to budgeting for the increaSing demand for maintenance related to the operations of the Biocycle Farm at the Biosolicls Management Facility, caused by the completion of several expansion phases over the past several years. Contractual Services --$391,323 [Increase of $46,695 or 140/0] . This line account includes $20,000 to meet the seasonal workload of the biocycle and biosolids reuse facility. Also, an increase in anticipated audit and consulting costs was partially offset by a decrease in anticipated laboratory analysis costs. Materials & Pr~gram Expense - $582,102 [Increase of $39,799 or 70h.] . The increase in this budget category is primarily comprised of increases for small equipment, staff training related to operation and maintenance of the co-generator engine, office furniture, laundry service, gas and oil and a reduction in legal expenses. Parts & Components - $236,997 [Decrease of ($11,516) or (50h.)] . The decrease is a net effect of an anticipated increased need of the Biosolids Management Facility coupled with a decreased expected need by the Treatment Plant. Computer Equipment, Supplies, Maintenance $152,936 [Decrease of ($20,845) or (120A.)] · This line item reflects the reduction from a one time Data Historian software purchase in the FY07 -08 budget. Indirects - Budget Request $955,000 [Increase of $296,000 or 450/0] · During FY06-07 the City of Eugene Public Works Administration met with the Eugene and Springfield Finance Staff to fmd the best methodology to recover central services allocations from the regional fund. The discussion was still in process during the FY 07-08 budget process and the FY 07-08 indirect budget was calculated with the information available at that time. The FY 07-08 estimate was lower than the FYO 6-07"budget and has since proved to be lower than actual requirements. The FY 08-09 indirect budget was increased to be back Page 34 ' FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 36 of 71 Metropolitan Wastewater Management Commission Eugene Budget Detail in line with the intergovernmental agreement provisions. Discussions are ongoing between the City staffs to develop a recommendation to the Commission on an efficient methodology with which to calculate indirect charges assessed to the regional wastewater program. CaDital Outlav , Capital Outlay - Other - $10,000 · Laboratory Moisture/Solids Analyzer $ 10,000 EXHIBIT 10 o & M - CITY OF EUGENE PROGRAM PROPOSED FY 08-09 BUDGET SUMMARY AMENDED ACTUAL BUDGET CHANGE * FY 06-07 ' FY 07-08 INCR/(DECR) Personnel Services $5,937,791 $6,360,990 $233,014 4% Materials & Services $3,531,009 $3,610,607 402,149 11% Capital Outlay 179,243 54,500 (44,500) -82% Budget Summary $9,648,043 $10,026,097 $590,663 6010 5-YEAR MWMC ADOPTED BUDGET COMPARISON O&M -EUGENE $12,000,000 $4,000,000 $10,616,760 $10,000,000 $8,000,000 $6,000,000 $2,000,000 $0 FY03-04 FY 04-05 . FY 05-06 FY06-07 FY 07-08 Note: * Change column and Percent Change column compare proposed FY 08-09 budget to originally adopted FY 07-08 budget. Page 35 ' , FY 08-09 BUDGET AND eIP ATTACHMENT A - Page 37 of 71 Metropolitan Wastewater Management Commission Eugene Budget Detail ACTUAL CHANGE FY 06-07 INCR/(DECR) PERSONNEL SERVICES Regular Wages $3,703,685 $161,201 4% Extra Help (742) 0 NA Overtime 48,452 (3,500) -6% E~ployee Benefits 1,343,862 52,331 4% Health Insurance 751,OlD 15,875 2% Workers' CompfUnemploy Ins 91,524 7,107 8% TOTAL PERSONNEL SERVICES 5,937,791 233,014 4% FTE 73,.42 0.15 0% MA TERIALS & SERVICES Utilities 676,146 1,534 0% Fleet Operating Charges 255,085 (31,868) -11% Maintenance-Equip & Facilities 315,706 88,252 30% Contractual Services 288,355 46,695 14% Materials & Program Expense 543,122 39,799 7% Chemicals 265,089 (4,512) -2% Parts & Components 214,139 (11,516) -5% Laboratory Equipment & Supplies 60,878 (585) -i% Risk Insurance - Employee Liability 52,493 (805) -2% Computer Equip, Supplies, Maint 135,266 (20,845) -12% In directs 724,730 296,000 45% TOTAL MATERIALS & SERVICES 3,531,009 402,149 11% CAPITAL OUTLAY Motorized VehicIes $71,803 (54,500) NA Capital Outlay-Other ' 107,440 10,000 NA TOTAL CAPITAL OUTLAY 179,243 (44,500) -82% LINE ITEM SUMMARY: EUGENE 9,648,043 590,663 6% EQUIPMENT REPLACEMENT' $ 384,485 $ 82,476 17% MAJOR REHAB $ 96,793 $ 630,000 143% MAJOR CAPITAL OUTLAY $ 165,000 $ NA Page 36 FY 08-09 BUDGET AND ClP ATTACHMENT A - Page 38 of 71 Metropolitan Wastewater Management Commission Capital Improvement Program REGIONAL WASTEWATER PROGRAM CAPITAL PROGRAMS Overview and Goals The FY 08-09 Regional Wastewater Program (RWP) Capital Budget and the FY 08-13 five-year Capital Improvement Program (CIP) are based on the MWMC Facilities Plan, which was approved by MWMC, the governing bodies of Eugene, Springfield and Lane County, and the Oregon Department of Environmental Quality in 2004. The Facilities Plan, and its 20-year capital project list, was the result of a comprehensive evaluation of the regional wastewater treatment facilities serving the Eugene-Springfield metropolitan area The Plan built on previous targeted studies, including the 1997 Master Plan, 1997 Biosolids Management Plan, 200 1 Wet Weather Flow Management Plan (WWFMP), and the' 2003 Management Plan for a Dedicated Biosolids Land Application Site. The Facilities Plan is intended to identify facility enhancements and expansions that are needed to meet increased regulatory and wet weather flow requirements and to serve the community's wastewater capacity and treatment needs through 2025. The objectives of the Capital Program are: . Compliance with applicable local, state, and federal laws and regulations; . Protection of the health and safety of people and property from exposure to hazardous conditions such as exposure to untreated or inadequately treated wastewater; . Provision of adequate capacity to facilitate community growth in the Eugene-Springfield metropolitan area consistent with adopted land use plans; . Construction, operation, and management of MWMC facilities in a maimer that is as cost-effective, efficient, and affordable to the community as possible in the shori and long term; . Implementation of Citizens Advisory Committee recommendations, which represent diverse community interests, values and involvement, and that have been adopted by the Commission as MWMC plans and policies; and . Mitigation of potential negative impacts ofMWMC facilities on adjacent uses and surrounding neighborhoods (ensuring thatMWMC facilities are "good neighbors" as judged by the community). Attaining these objectives is the basis for the' projects included in the five-year CIP and FY 08-09 ,Capital Projects budget administered by theCapital Projects Section staff in the City of Springfield. Particular emphasis has been placed on getting projects completed which will allow for conveyance and treatment of peak wet weather flows by the end of 2009. The capital program objectives also guide the capital projects administered by the City of Eugene which extend the life of the existing facilities through equipment replacement, facility rehabilitation and capital outlay. Page 37 FY 08-09 BUDGET AND CIP ATTACHMENT A - Pag~ 39 of 71 Metropolitan Wastewater Management Commission Capital Improvement Program . CIP Financial Plannin!! and Policy Oven7jew The R WP CIP is funded primarily through proceeds from revenue bond sales, system development charges, and transfers from the operating fund to Capital Reserves. This year, staff will also apply for loan funding through the State Revolving Fund loan program. The operating fund derives the majority of its revenue from wastewater user charges that are collected by Eugene and Springfield from their respective customers. Transfers from the operating fund are budgeted annually consistent with the MWMC Financial Plan to meet the fmancial needs of the capital projects. The RWP uses these transfers to reduce the amount of borrowing necessary to finance the capital program. For each fiscal planning cycle, only one year of budget authority is appropriated. The remaining four years of the CIP are important and useful for fiscal and work planning purposes, but the funds in the outer years of the CIP are only planned for, not appropriated. The full amountof obligated multi-year project costs is typically appropriated inthe fIrst year of the project, unless a smaller subset of the project, such as project design, can be identified and funded without budgeting the full projected project cost. For these multi-year contracts, unspent funds from one fiscal year will be carried over to subsequent fiscal years until the project is cOlnpleted. The RWP CIP reflects projected price changes over time that affect the cost of materials and services. Until about 2003, the 20-year average Engineering News Record inflationary factor for construction served as a good predictor for future inflation and was used for projecting MWMC costs. Initial cost projections for projects included in the Facilities Plan were included in the Plan based on January 2004 construction costs. In recent years however, construction inflation has accelerated and local construction cost inflation has even accelerated faster than the ENR average and MWMC has modified its inflationary projections accordingly. In early 2006, MWMC hired CH2M Hill to perform a comprehensive update ofproject cost estimates. Following that update, the RWP CIP assumes general prices change at five percent per year over the planning period. This does not reflect a projection of any single inflation index but was developed by CH2M Hill to reflect a reasonable aggregate rate of increases for the next five years, based on the historical activity of both construction and non-construction price indices. Indices tracked include the Engineering News Record Construction Cost Index, the Turner Building Cost Index, and the Consumer Price Index. Re!tional Wastewater Pro!rram CaoitalProiects Bud!!et The following is a summary of the status of capital projects which are currently budgeted in the FY 07-08 Regional Wastewater Program Capital Budget and those included in the new FY 08-09 Capital Budget. The Regional Wastewater Program Capital Projects budget consists of the projects in the fIrst year of the FY 08-13 five-year CIP, totaling $~5,144,404, plus the Capital Projects managed by Eugene staff at the Wastewater Facility (consisting of Equipment Replacement, Major Capital Outlay, and Major Rehabilitation), totaling $1,758,010. ' Information regarding each project included in the FY 08-09 Capital Projects budget is included in theCIP project summary sheets included in this document. Each summary sheet provides a Page 38 FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 40 of 71 Metropolitan Wastewater Management Commission -Capital Improvement Program description of the project, the project purpose and what is driving the timing of the project, the funding schedule, and the expected fmal cost and cash flow for the project. For those projects which are in progress, a short status report is included on the summary sheet. ComDleted Caoital Proiects (Scheduled ComDletion bv June 30.. 2008) In FY 07-08, several on-going capital projects are being completed and closed out. Those projects projected to be closed out in FY 07-08 are listed below. No CIP sUIIlDiary sheets are included in this document for these projects because there is no expected carryover of project funds to FY 08-09, and therefore no requested budget for these projects in FY 08-09. All projects completed in FY 07-08 have been completed within the Commission-approved capital budgets for each project. The Primary and Secondary Clarifier Improvements project, which combined three proJects from the ,2004 Facilities Plari (primary Clarifier Enhancements, Secondary Clarifier Enh~cements, and 9th and 10th Secondary Clarifier) plus some scheduled equipment replacement arid rehabilitation in the clarifiers, is expected to be completed by the end of the fiscal year and conservatively $1.8 million under the $17,480,000 budget. Final performance testing is expected to occur this winter under stressed flow conditions. The Digester Mixing Improvements project is projected to finish in spring, 2008. Two of the three digesters to be modified for improved mixing have already been fully completed and placed on line and are operating successfully. The project is expected to come in just under the $2,957,000 budget. The project to Line BiosoIids Lagoon - Phase 1 will be completed by the end of the fiscal year. The lining of the lagoon has been completed and the contractor is fInishing up the dredge movement system to serve all four sludge lagoons. Also, extensive work has been completed to upgrade the electrical system for all four lagoons. The project is expected to be completed for approximately $250,000 less than the $3,600,000 budget. Biocycle Farm Poplar Plantation - Phase 2 (which was expected to be completed in FY 06- 07) has now been fully completed and the newly planted trees are growing vigorously. The project was completed at about $50,000 under the $319,000 budget. River Avenue Improvements were completed by the City of Eugene and we are anticipating a bill for the assessed amount of the project by the spring of 2008. The current anticipated assessment is expected to be covered by the $500,000 budget for the project. Carrvover CaDital Proiects (Projects Initiated in FY 07-08 or Earlier) A number of capital projects which were started or on-going in FY 07-08 are not scheduled for completion until FY 08-09 or beyond. Therefore, remaining funding for these projects is carried over in this FY 08-09 budget CIP project summary sheets for these carryover projects are included in this document. All funding for these projects continues to be consistent with the CH2M Hill 2006 recosting of capital projects. Page 39, FY 08-09 BUDGET AND eIP ATTACHMENT A -.Page 41 of 71 . , Metropolitan Wastewater Management Commission Capital Improvement Program The on-going carryover projects are: BiocycIe Farm Poplar Plantation - Phase 3 Wet Weather Flow Management Plan (WWF:MP) Update Facilities Plan Engineering Services Influent Pumping Improvements and Headworks Expansion Aeration Basin Improvements- Phase 1 Sodium Hypochlorite Conversion ' Peak Flow Management Improvements Odorous Air Treatment - Phase 1 Primary Sludge Thickening Tertiary Filtration - Phase 1 Effluent Reuse - Phase 1 New Projects for the FY 08-09 CaDitaI Bude:et Consistent with the Facilities Plan project list and consistent with the FY 07-08 CIP, several additional projects are rolling from the second year of the adopted FY 07-12 CIP, into the fIrst year of the FY 08-13 CIP, and therefore into the FY 08-09 Capital Budget. CIP project sll1l1l'riary sheets for these projects are included in this document. . New projects added in the FY 08-09 Capital budget are: Line Biosolids Lagoon - Phase 2 Odorous Air Treatment - Phase 2 Summarv of FY 07-08 CaDitaI Bude:et The following summary table shows the adjusted budget and end-of-year estimates for expenditures for the FY 07-08 Capital Budget and the amount of funding which is expected to be carried over to FY 08-09 for those projects that are ongoing and continuing to FY 08-09. Also shown is additional funding and new projects in the FY 08-09 Capital Budget. The projects are organized in the table by where they are in the funding cycle, i.e. projects completed in FY 07- 08, projects to be carried over from the FY 07-08 budget to the FY 08-09 budget, and projects which are newly budgeted. These projects and funding are consistent with the planning and funding as presented in the approved F.Y 07-12 CIP, with the exception of the funding for the Sodium Hypochlorite Conversion project, which has been increased by $80,000 to prepare for inclusion of the State sponsored (and paid for) boat waste receiving station in that project, and inflationary adjustments to Odorous Air Treatment - Phase 1, Primary Sludge Thickening, and Effluent Reuse - Phase 1 projects. In addition, we are taking advantage of an opportunity to do some equipment replacement at the Willakenzie Pun;lp Station as part of the Influent Pumping and Headworks Expansion Project. The replacement of existing equipment at the pump station will be paid for through the Equipment Replacement Reserve with money set aside for this purpose. Page 40 FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 42 of 71 Metropolitan Wastewater Management Commission Capital Improvement Program. EXHIBIT 12 FY 07-oS TOTAL FY 07~O8 FY07-oS CARRYOVE NEW FUNDING PROPOSED ADJUSTED ESTIMATED R PROGRAMMED FY OS-09 BUDGET ACTUALS TO FY OS-09 FOR FY OS-09 BUDGET Projects Completed in FY 07-oS Clarifier Improvements 6,893,969 5,000,000 O' 0 0 Digester Mixing Improvements 737,407 737,407 0, , 0 , 0 Line Biosolids Lagoon - Phase 1 3,194,587 2,950,000 0 0 0 Biocycle Farm Poplar Plantation- Phas'~ 78,238 24,566 0 0 0 Biocycle Farm Hose Reels 15,439 0 0 0 0 River A venue Improvements 498,544 ' 498,544 0 0 0 Projects to be Carried Over to FY OS-09 Biocycle Farm Poplar Plantation- Phase 3 372,000 18,000 354,000 0 354,000 WWFMP Update 439,077 145,901 293,176 0 293,176 Facilities Plan Engineering Services 55,125 32,000 0 57,881 57,881 Influent Pumping and Headworks Exp 27,379,359 2,692,000 24,687,359 282,000 24,969,359 Aeration Basin Improvements - Phase 1 8,667,143 4,900,064 3,767,000 0 3,767,000 Sodium Hypochlorite Conversion 7,808,647 510,000 7,298,647 ' 80,000 7,378,647 Peak Flow Management Improvements 24,945,087 3,366,000 21,579,087 0 21,579,087 Odorous Air Treatment - Phase 1 (2) 9,464,254 535,000 8,929,254 1,324,000 10,253,254 Primary Sludge Thickening 4,371,000 190,000 4,181,000 127,000 4,308,000 Tertiary Filtration - Phase 1 1,500,000 317,000 1,183,000 13,185,000 14,368,000 Effluent Reuse - Phase 1 (2) 2,884,000 100,000 2,784,000 434,000 3,218,000 Newly Budgeted Projects for FY OS-09 Line Biosolids Lagoon - Phase 2 0 0 0 2,894,000 2,894,000 Odorous Air Treatment - Phase 2 0 0 0 1,704,000 1,704,000 TOTAL (4) 99,303,876 22,016,482 75,056,523 20,087,881 95,144,404 Summary of FY 07-0.8 MWMC Construction Program Capital Budget (1) $80,000 in new funding for FY 08-09 for a State-funded boat waste receiving facility has been added to the Sodium Hypochlorite Conversion project This funding will be received from the State Marine Board. $282,000 in new funding added to the Influent Pumping and Headworks Expansion Project to pay for replacement of some existing equipment in the Willakenzie Pump Station - funded by Equipment Replacement Reserves. (2) These projects have an adjusted budget related to inflation from moving the project time frames. (3) Only engineering services for the Tertiary Filtration Project were budgeted in FY 07-08. ,The construction budget is being added in this FY 08-09 budget (4) Actual spending in the construction capital program is expected to be around $65,900,000 in FY 08-09. Page 41 __ FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 43 of 71 Metropolitan Wastewater Management Commission Capital Improvement Program Reeional Wastewater Proeram FY 07 -12 Five- Year CIP The projects in the out years of the Regional Wastewater Program FY 08-13 Five-Year CIP are based almost exactly on the programming of regional capital projects in the CWTent adopted FY 07-12 CIP. Mostofthe significant changes from the current CIP are additions of projects in the outer years of the CIP. These added projects include: the last phase of the relining of the sludge lagoons (Line Biosolids Lagoon - Phase 4); the third phase of the effluent reuse projects (Effluent Reuse - Phase 3); and the provision of greater sludge digestion capacity either through addition of an added digester, or adoption of newer technologies to produce Class A Biosolids (Increase Digestion Capacity and Provide Class A Capability). Staffhas continued, as in past CIPs, to organize the projects in the eIP based on categories that illustrate the major functions they serve in the wastewater system. The classification system groups capital projects in four main project categories as follows: a. Biosolids Management, b. Non-Process Facilities and Facilities Planning, c. Conveyance Systems, and d. Plant Facilities Improvements. The above classifications of projects are used to organize projects in the summary table for the FY 08-13 CIP below, and to organize the eIP summary sheets that describe each project. Page 42 FY 08-09 BUDGET AND ClP ATTACHMENT A - Page 44 of 71 Metropolitan Wastewater Management COmnllssion Capital ~provement Program , EXIllBIT 13 Regional Wastewater 5- Year Capital Programs FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 TOTAL CAPITAL PROJECTS Biosolids Management Biocycle Farm - Poplar Plantation ill 354,000 354,000 LineBiosolids Lagoon - Phase II 2,894,000 2,894,000 Line Biosolids Lagoon - Phase ill 100,000 3,091,000 3,191,000 Line Biosolids Lagoon - Phase IV 100,000 3,250,000 3,350,000 Repair/Replace.ofBiosolids Forc~ Main 100,000 1 ,400,000 1,500,000 Non-Process Facilities and Facilities Planning WWFMP Update 293,176 293,176 Facility Plan Engineering Services 57,881 60,775 63,814 67,005 70,355 319,830 2610 Facility Plan Update 221,000 221,000 Conveyance. Systems Influent Pumping & Headworks 24,969,359 24,969,359 Glenwood Pump Station Upgrade 741,500 741,500 Plant Performance Improvements Aeration Basin Improvements Phase I 3,767,000 3,767,000 Sodium Hypochlorite Conversion 7,378,647 7,378,647 Peak Flow Management Improvements 21,579,087 21,579,087 Odorous Air Treatment I 10,253,254 10,253,254 Odorous Air Treatment II 1,704,000 1,704,000 Primary Sludge Thickening 4,308,000 4,308,000 Tertiary Filtration I 14,368,000 14,368,000 Effluent Reuse I 3,218,000 3,218,000 Effluent Reuse II 5,152,000 5,152,000 Effluent Reuse ill 6,542,000 6,542,000 Waste Activated Sludge Thickening 3,901,000 3,901,000 Increased Digestion Capacity/Class A 25,777,000 25,777,000 TOTAL CAPITAL PROJECTS 95,144,404 5,312,775 4,21\314 8,109,005 32,998,355 145,781,853 ASSET MANAGEMENT Equipment Replacement 569,010 576,012 1,180,695 2,272,569 1 ;292,962 5,891,248 Major Rehab 900,000 425,000 930,000 318,764 332,425 2,906,189 Major Capital Outlay 289,000 258,931 547,931 TOT ALASSET MANAGEMENT 1,758,010 1,259,943 2,110,695 2,591,333 1,625,387 9,345,368 TOTAL CAPITAL IMPROVEMENTS 96,902,414 6,572,718 6,328,009 10,700,338 34,623,742 155,127,221 The FY 08-13 five-year CIP for Regional Capital Projects amounts to $145,781,853. When Asset Management Capital Program planned expenditures (administered by the City of Eugene) are added ,in, the total five-year tIP comes to $155,127,221. Information regarding each capital project in the FY 08-13 CIP is included in the ClP summary sheets included in this document. Ibis includes those projects in the fIrst year of the CIP, which constitute the FY 08-09 Capital Budget. Each summary sheet provides a description of the project, the project purpose and what is driving the timing of the project, the funding schedule, and the expected final cost and cash flow Page 43 '~ FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 45 of 71 Metropolitan Wastewater Management Commission Capital Improvement Program for the project. For those projects which are ~ progress, a short status report is included on the sun:unary sheet. Reeional Wastewater Asset Manaeement Capital Proeram \ Another category of projects in the MWMC Capital Budget are those capital projects and capital purchases that are administered by the City of Eugene for MWMC, and which provide for major reconstruction, replacement, repairs, and purchases necessary to maintain functionality, lifespan, and effectiveness ~f existing facility assets. We call this the Asset Management Capital Program. Three sub-categories ate included in the Asset Management categoty: a. Equipment Replacement - b. Major Rehabilitation - c. Major Capital Outlay - FY 08-09 Asset Manaeement Capital Proeram Budeet . Equipment Replacement Program - Budget The FY 08-09 Capital Programs budget includes $569,010 in Equipment Replacement purchases, which are identified on the table below. Equipment Replacement Projects - FY 08-09 Description FY 08-09 Proposed Budget Programmable Logic Controller for $19,000 Glenwood Pump Station Variable Frequency Drives (2) for $20,000 Gravity Belt Thickeners HV AC Control Panels for Secondary, Final, $77,004 and Digester Complexes W2 Water Pumps (2) $106,000 Variable Frequency Drives (2) for W2 Pumps $44,228 W2 Control Panel $13,000 Air Flow Control Valves (2) for $24,000 Aeration Basins , Uninterruptible Power Supply $52,877 FIAlIC Autoanalyzer for Laboratory $68,848 Computer Replacement $,33,500 Fleet Replacement $110,553 Programmable Logic Controller for Glenwood Pump Station - The programmable logic controllers (PLC) provide for reliable automated operation of the station and alarm notification. The Glenwood Pump Station was constructed in 1995 and the original PLC has reached the end of its useful life. Page 44 FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 46 of 71 Metropolitan Wastewater Management Commission Capital Improvement Program Variable Frequency Drives for Gravity Belt Thickeners - The variable frequency drives for the gravity belt thickener (GBT) process provide automated adjustable belt speed control which is required for its operation. The VFDs are 15 years old and have reached the. end of their u.sefullife. HV AC Control Panels for Secondary, Final, and Digester Complexes - All of the HV AC Control Panels to be replaced are 25 or more years old arid have been in service since the original regional plant construction. 'W2 Water Pumps, Variable Frequency Drives, and Control Panel - The W2 Pumps provide many critical process and support functions for the regional treatment plant: supply water or chlorination, cogeneration cooling water, pump seal water, surface spray water, washdown water, and injgation. The VFDs provide for continuous adjustment of motor speed to meet changing flow demand and pressure of the W2 system. The pumps, their VFDs, and control panel have reached the end of their useful life and require replacement for critical process reliability. Air Flow Control Valves for Aeration Basins - The air flow control valves provide for control of aeration to the activated sludge process. Their operation serves a critical function for accurate control of dissolved oxygen which is a, critical operational control parameter for effective treatment. G Uninterruptible Power Supply - The uninterruptible power supply serves as an emergency power supply for the Operations building where the Operations Console Room is located~ This emergency equipment ensures a constant power supply for the Distributed Control System which monitors and controls the regional treatment facility and 47 pump stations. The FWIC Autoanalyzer is a laboratory analyzer used to detect and measure a variety of ' pollutants and water quality parameters such as nitrates and chlorides for process control and regulatory monitoring. The analyzer has reached the end of its useful life and replacement is needed to maintain productivity and accuracy for measurement of pollutants in effluent, groundwater wells, biosolids, soils, and reclaimed water. Computer replacement includes replacement of nine personal computers, monitors, and a file server. Fleet replacement consists of replacement of one portable trailer mounted pump and a contribution to the purchase of a Brown Bear biosolids mixer. The mixer facilitates drying of biosolids in the air drying beds. . Major Rehabilitation Program - Budget The FY 08-09 Capital Programs budget includes $900,000 for Major Rehabilitation projects,uwhich are identified on the table below. Page 45 ' FY 08-09 BUDGET AND CIP ATTACHMENT A-- Page 47 of 71 Metropolitan Wastewater Management Commission Capital Improvement Program Ma. or Rehab Pro. ects - FY 08-09 Descri tion FY 08-09 Pro o erationslMaint Building Im rovements Roof Replacement, Service Station Roof Re lacement, SIWS Bldg Resurface Air Drying Beds (6) Operations Building Improvements - This expenditure will go towards miscellaneous repairs and renovation to maintain and improve the functionality of the Operations and/or Maintenance Building for staff. Business functions and staff size have changed substantially for office and technical staff since original construction of the Operations and Maintenance buildings. Rehabilitation and functionality improv~ments help to delay the need for additional floor space. Roof Replacements - Roofs will be rebuilt on two structures as identified in the above table. All replacements were identified in the course of carrying out our comprehensive roof inspection and testing program. In addition to visual inspections the program includes testing for moisture penetration. Timely replacement avoids more extensive and costly repairs when roof problems are otherwise ignored or delayed. Resurfacing of Air Drying Beds - The air drying beds are used for drying biosolids prior to their application to agricultural land. The deteriorating condition of six beds due to age and wear requires resurfacing to extend their usefullife~ Failure to resurface would eventually require extensive rebuilds at substantially greater cost. . Major Capital Outlay - Budget The FY 08-09 Capital Programs budget includes $289,000 forMajor Capital Outlay, which is identified on the table below. -. FY 08-09 FY 08-09 Pro Biosolids Mixer - A new biosolids mixer will improve reliability for daily mixing of biosolids in air drying beds. This activity is essential for meetmg annual volume processing requirements and avoiding severe odor issues that occur without daily mixing. the current mixer is 10 years old with increasing risk of failure during the height of biosolids processing. Page 46 FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 48 of 71 Metropolitan Wastewater Management Commission Capital Improvement Program , Summary of FY 08-09 Asset Management Capital Budget Cate20rv of Canital Exnense FY 08-09 Pronosed Budeet Equipment Replacement $569,010 Major Rehabilitation $900,000 Maj or Capital Outlay $289,000 TOTAL $1,758,010 Page 47 ,- FY 08-09 BUDGET AND ClP ATTACH~ENT A - Page 49 of 71 Metropolitan Wastewater Management Commission Capital Improvement Program BIOCYCLE FARM POPLAR PLANTATION - PHASE 3 N + Description: Phase 3 of the poplar plantation (approximately 117 acres) at the Biocycle Farm. Site preparation should begin as early as summer/fall 2008. Justification: , Land already purchased and provides additional area adjacent to Biosolids Management Facility (BMF) for application of liquid and dewatered biosolids. Expansion of the Biocycle Farm provides the Metropolitan Wastewater Management Commission (MWMC) with more flexibility and control of overall biosolids management program. Project Driver: Increased solids production at the Eugene/Springfield Water Pollution Control Facility (WPCF). ' ' Project Trigger: Biocycle Farm Phases 1 and 2 loading limits for liquid and dewatered biosolids will be reaching capacity. The planting must fit into the planned cycle of growing and harvesting of poplar trees. . Project Type: 100% Performance Improvement SDC Eligibility: 22% Estimated Project Cost: $372,000 Expected Cash Flow: FY 07-08 = $,18,000; FY 08-09 = $354,000 Prior 2007-08 Exoenditure/Cateoorv: Years Est. Act. 2008-09 2009-10 2010-11 2011-12 2012-13 Total Design/Construction 0 $18,000 $354,000 0 0 0 0 $372,000 Other 0 0 0 0 0 0 0 0 Total Cost $0 $18,000 $354,000 $0 $0 $0 $0 ' $372,000 Page 48 , FY 08-09 BUDGET AND CIP ATTACHMENT A ~ Page 50 of 71 Metropolitan Wastewater Management Commission Capital Improvement Program LINE BIOSOLIDS LAGOONS - PHASE 2 N + Description: Reline existing lagoons, Phase 2 at the Biosolids Management Facility (BMF). Justification: Existing clay lagoon liners are reaching the end of the material's useful life. A new synthetic liner will be installed in the lagoons. In Phase I, the liner material of choice was high density polyethylene. In the Phase 1 project implementation, the contractor is installing the main components for anew dredge lateral movement system for all four lagoons, for improved operational safety, and efficiency. Project Driver: MWMC proactively desires to improve the safety of BMF staff, improve operational reliability of the facultative lagoons, and ensure DEQ compliance related to groundwater protection. Project Trigger: Monitoring will be conducted to determine the effectiveness of the first phase of the lagoon lining project. MWMC anticipates rehabilitating all four ,existing lagoon liners in four separate phased projects. Project Type: 100% Rehabilitation Estimated Project Cost: $2,894,000 Expected Cash Flow: FY 08-09 = $630,000; FY 09-10 = $2,264,000 Prior 2007-08 Exoenditure/Cateaorv: Years Est. Act. 2008-09 2009-10 2010-11 ' 2011-12 2012-13 Total Design/Construction 0 0 $2,894,000 0 0 0 0 $2,894,000 . Other 0 0 0 0 0 0 0 0 Total Cost $0 $0 $2,894,000 $0 $0 $0 $0 $2,894,000 Page 49 - :}.~ FY 08-09 BUDGET AND CIP ATTACHMENT A - ~age 51 of 71 Metropolitan Wastewater Management Commission Capital Improvement Program LINE BIOSOLIDS LAGOONS - PHASE 3 N I T Description: Reline existing lagoons, Phase 3 at the Biosolids Management Facility (BMF). Justification: Existing clay lagoon liners are reaching the end of the material's useful life. A new synthetic liner will be instaliedin the lagoons. In Phase I, the liner material of choice was high density polyethylene. In the Phase 1 project implementation, the contractor is installing the main components for a new dredge lateral movement system for aU four lagoons, for improved operational safety and efficiency. ' Project Driver: MWMC proactively desires to fmprove the safety of BMF staff, improve operational reliability of the facultative lagoons, and ensure DEQ compliance related to groundwater protection. Project Trigger: Monitoring will be conducted to determine the effectiveness of the first and second phase of the lagoon lining projects. MWMC anticipates rehabilitating all four existing lagoon liners in four phased projects and will monitor the new liner improvements. Project Type: ,100% Rehabilitation Estimated Project Cost: $3,400,000 (Note: The estimated project budget need has been increased by $209,000 from the FY 07-08 estimate of $3,191 ,000 due to the anticipated cost of a construction access road and the uncertainty of the structural integrity of the existing lagoon bottom.) Expected Cash Flow: FY 09-10 = $100,000; FY 10-11 = $1,500,000; FY 11-12 = $1,800,000 Prior 2007-08 Exoenditure/Cateoorv: Years Est. Act. 2008-09 2009-1 0 2010-11 2011-12 2012-13 Total Design/Construction 0 0 0 100,000 3,300,000 0 0 $3,400,000 Other 0 0 0 0 0 0 0 0 Total Cost $0 $0 $0 $100,000 $3,300,000 $0 $0 $3,400,000 Page 50 FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 52 of 71 Metropolitan Wastewater Management Commission Capital Improvement Program , LINE BIOSOLIDS LAGOONS - PHASE 4 N + Description: Reline existing lagoons, Phase 4at the Biosolids Management Facility (BMF). Phase 4 rehabilitation work is anticipated to be completed in 2013. Justification: Existing clay lagoon liners are reaching the end of the material's useful life. A new synthetic liner will be installed in the lagoons. .In Phase I, the liner of choice was high density polyethylene. In the Phase 1 project implementation, the contractor is installing the main components for a new dredge lateral movement system for improved operational safety and efficiency. Project Driver: MWMC proactively desires to improve the safety of BMF staff, improve operational reliability of the facultative lagoons, and ensure DEQ compliance related to groundwater protection. Project Trigger: Monitoring will be conducted to detelll1ine the effectiveness of the first; second and third phases of the lagoon lining projects. MWMC anticipates rehabilitating all four existing lagoon liners in four separate phased projects. Project Type: 100% Rehabilitation Estimated Project Cost: $3,200,000 Expected Cash Flow: FY 11-12 = $100,000; FY 12-13 = $1,600,000; FY 13-14 = $1,500,000 Prior 2007-08 Exoenditure/Cateaorv: Years Est. Act. 2008-09 2009-10 2010-11 2011-12 2012-13 Total Design/Construction 0 0 0 0 0 100,000 3,100,000 $3,200,000 Other 0 0 0 0 0 0 0 0 Total Cost $0 $0 $0 $0 $0 $100,000 $3,100,000' $3,200,000 Page 51 .: FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 53 of 71 Metropolitan Wastewater Management Commission Capital Improvement Program REPAIR AND/OR PARTIAL REPLACEMENT OF BIOSOLIDS FORCE MAIN Description: Repair and/or replace sections of the biosolids force main (piping system) where struvite deposits reduce the pipe diameter and cannot be removed by an acid washing method. The piping system connects the Water Pollution Control Facility (WPCF) to the Biosolids Management Facility (BMF). Justification: Project will rehabilitate portions of the existing biosolids conveyance system. Project Driver: Maintain system functionality of the biosolids conveyance system. Project Trigger: P~oject Type: Functionality issues within the existing pipeline. 100% Rehabilitation ,Estimated Project Cost: $1,500,000 Expected Cash Flow: FY 10-11 = $70,000; FY 11-12 = $1,430,000 Prior 2007-08 Exoenditure/Cateaorv: Years Est. Act. 2008-09 2009-1 0 2010-11 2011-12 2012-13 Total Design/Construction 0 0 0 0 $100,000 $1,400,000 0 $1,500,000 Other 0 0 0 0 0 0 0 0 Total Cost $0 $0 $0 $0 $100,000 $1,400,000 $0 $1,500,000 Page 52 " FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 54 of 71 Metropolitan Wastewater Management Commission Capital hnprovement Program WET WEATHER FLOW MANAGEMENT PLAN UPDATE Description: Evaluate collection system flow monitoring data collected since the original WVVFMP was finalized in 2000, update and run collection system model and confirm (revise) convey and treat approach. Review importance of private lateral rehabilitation and investigate ways to encourage or require private lateral repairs. This project is'a combination of two original projects - one for the update of the WVVFMP report, and one for the further pursuit of a private lateral program. Status: The Model Update portion of the work has been completed. A planning effort is now underway to update the WwFMP report and develop a private lateral improvement program. Project Driver: Ongoing monitoring data might impact III reduction priorities and will affect future decisions regarding transport and treatment capacity to be planned for. Private'lateral infiltration remains an important issue to address. Project Trigger: Scheduled update. Improvement SDC Eligibility: 11% Estimated Project Cost: $532,000 Expected Cash Flow: FY 05-06 = $6,028; FY 06-07 = $86,895; FY 07-08 = $145,901; FY 08-09 = $115,000, FY , 09-10 = $160,000, FY 10-11 = $18,176 Prior 2007-08 Exoenditure/Cateoorv: Years Est. Act. 2008-09 2009-10 2010-11 2011-12 2012-13 Total Design/Construction 0 0 0 0 0 0 0 0 Other $92,923 $145,901 $293,176 0 0 0 0 $532,000 Total Cost $92,923 $145,901 $293,176 $0 $0 $0 $0 $532,000 Page 53 FY 08-09 BUDGET AND CIP 'ATTACHMENT A - Page 55'of 71 . Metropolitan Wastewater Management Commission Capital Improvement Program \ FACILITY PLAN ENGINEERING SERVICES Description: Engineering services for analysis, project definition, cost estimating, and general consultation regarding the 20-Year Facilities Plan. Status: This year, work has been completed to assist with overall coordination of utility needs for the various projects in the capital program at the plant, to assist with the Conditional Use Permit .application, and also to provide consultation and more detailed definition of the drivers and design criteria for various projects. ' Justification: Projects were developed to varying levels of specificity in the 20- Y ear Facilities Plan and there is an on-going need to have a consistent resource to help in further refining projects and generally assisting with implementation of the plan. Another need addressed by this resource is assurance that the new improvements maintain the overall integrity of the plan in ' terms of treatment processes and hydraulics. Project Driver: Ongoing goal to efficiently follow and update the20-Year Facilities Plan. Project Trigger: On-going need. Estimated Project Cost: $401,830 Expected Cash Flow: FY 08-09 = $57,881; FY 09-10 = $60,775; FY 10-11 = $63,814; FY 11-12 = $67,005; FY 12-13 = $70,355 Prior 2007 -08 -ExDenditure/Cateaorv: Years Est. Act 2008-09 2009-1 0 2010-11 2011-12 2012-13 Total Design/Construction 0 0 0 0 0 0 0 0 Other $50,000 $32,000 $57,881 $60,775 '$63,814 $67,005 $70,355 $401,830 Total Cost $50,000 $32,000 $57,881 $60,775 $63,814 $67,005 $70,355 $401,830 Page 54 ' FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 56 of 71 Metropolitan Wastewater Management Commission Capital Improvement Program 2010 PARTIAL FACILITY PLAN UPDATE Description: Review of the Facilities Plan assumptions and costs. Consideration ofnew regulations, information, and technology to modify the plan. Regulatory requirements and system data are not static and the plan may require cou'rse correction to meet new needs. Justification: Project Driver: Ongoing goal to keep planning up to date. Project Trigger: Scheduled update. Improvement SDC Eligibility: 21% Estimated Project Cost: $221 ,000 Expected Cash Flow: FY 10-11 = $221,000 Prior 2007-08 Exoenditure/Cateoorv: Years Est. Act 2008-09 2009-1 0 2010-11 2011-12 2012-13 Total Design/Construction 0 0 0 0 0 0 0 0 Other 0 0 0 0 $221,000 0 0 $221,000 Total Cost $0 $0 $0 $0 $221,000 $0 $0 $221,000 Page 55 . FY 08-09 BUDGET AND CIP ' ATTACHMENT A - Page 57 of 71 Metropolitan Wastewater Management Commission Capital Improvement Program INFLUENT PUMPING IMPROVEMENTS AND HEADWORKS EXPANSION Description: Status: Justification: Project Driver: Project Trigger: Project Type: Project Ph.,siti!J ftrget'1t.>-Spli~gf,eld 'WPcF This project provides influent pumping improvements and headworks expansion required to accommodate the 2025 peak wet weather flow of 277 mgd. The budget for this project includes a total of $687,000 that was transferred from the Equipment Replacement Reserve. Of this, $405,000 was transferred in the FY 07-08 budget and $282,000 was newly included in the FY 08- 09 budget. The funds from the Equipment Replacement Reserve will be used at the Willakenzie Pump to replace existing knife gate valves in the existing force mains and to replace and variable frequency drives for five of the existing 300 horse power pumps. The $405,000 that was transferred in FY 07-08 included $360,000 for valve replacement, and $45,000 for the replacement of fans in the odor control system. Finally, $12,000 was transferred to the project budget in FY 07.:.08 from the Major Rehabilitation Reserves for the refurbishment of two grit channel metal rails. The project also Includes landscaping and screening around the new, construction area. Due to the time critical nature of this project, it is being delivered using a Construction Manager/General Contract (CM/GC) project delivery process. Detailed design stage. The CM/GC has been selected for preconstruction services. Improved influent pumping and headworks hydraulic capacity are required to increase total plant influent hydraulic capacity to 277 mgd and to meet redundancy requirements for pumping and . screening. Ability to provide treatment to peak flows and systematic elimin?ltion of sanitary sewer overflows by the year 2010. Collection system computer model estimates the current wet weather peak flow to plant to be 264 mgd. Overall existing peak flow capacity is 175 mgd so there is already a capacity deficit. 100% Capacity Improvement SDC Eligibility: 38% Estimated Project Cost: $28,054,000 Expected Cash Flow: FY 05-06 = $16,348; FY 06-07 = $376,293; FY 07-08 = $2,692,000; FY 08-09 = $14,682,000; FY 09-10 = 10,287,359 Prior 2007-08 Exoenditure/Cateoorv: Years Est. Act. 2008-09 2009-10 . 2010-11 2011-12 2012-13 Total Design/Construction $392,641 $2,692,000 $24,969,359 0 0 0 0 $28,054,000 Other 0 0 0 0 0 0 0 0 Total Cost $0 $0 $0 $0 $0 $0 $0 $28,054,000 Page 56 FY 08-09 BUDGET AND eIP ATTACHMENT A - Page 58 of 71 . Metropolitan Wastewater Management Commission Capital Improvement Program GLENWOOD PUMP STATION UPGRADE Description: Expand Glenwood Pump Station capacity. The existing pump station is built to be expandable incapacity when the need arises. Justification: Additional pumping capacity will be required at this Regional pump station to handle increasing flows in Glenwood and the Laurel Hill area of Eugene. Project Driver: Keep up with capacity needs, maintain required pumping redundancy, and prevent overflows. Project Trigger: The regional sewer system computer model estimates that a capacity increase will be needed by about 2010. Continued monitoring of flows and updating of the model will determine when the improvements are actually needed. The timing will be impacted by the effectiveness of III removal in the contributing sewer basins and the rate and type of development in the area. Project Type: 100% Capacity Improvement SDC Eligibility: 38% Estimated Project Cost: $741,500 Expected Cash Flow: FY 10-11 = $200,000; FY 11-12 = $541,500 2007-08 Exoenditure/Cateaorv: Prior Years Est. Act. 2008-09 2009-10 2010-11 2011-12 2012-13 Total Design/Construction 0 0 0 0 $741,500 0 0 $741,500 Other 0 0 0 0 0 0 0 0 Total Cost $0 $0 $0 $0 $741,500 $0 $0 $741,500 Page 57 -- _ FY 08-09 BUDGET AND eIP ATTACHMENT A - Page 59 of 71 Metropolitan Wastewater Management Commission - Capital Improvement Program AERATION BASIN IMPROVEMENTS - PHASE 1 ,-~-'?~ ",.J,"'- ~n' ..~"~ ':- ~~,' " ;;" - ,~ ==- .~ ~ (. I . t I ~___ ~~~'<~=":'h~'''''j!L t~ Pro-jed Phasingl EUge~5pringne1d' ViPCF ---r-- ..~t1:" I;; , ' 'l U "'~,.......... Description: Add step feed, anoxic selectors, and fine bubble diffusers to 4 of the 8 cells of the aeration basins and make hydraulic improvements. This project was originally the South Aeration Basin Improvements project, however further study showed that improvements to the 4 eastern most basins as a first phase would allow for better hydraulics and more operational flexibility. The project budget also includes $312,000 of funding from the Equipment Replacement Reserve for the replacement of older aeration diffusers equipment. The construction contract notice to proceed was issued to 2G Construction in April of 2007. As of December of 2007 I the contractor is upgrading the south easterly aeration basins with new concrete partition walls, system piping and diffuser components. Status: Justification: Increase the dry weather aeration basin treatment capacity to 65 mgd with respect to ammonia (with nitrification) and increase the wet weather treatment capacity to 130 mgd. Project Driver: NPDES permit includes ammonia limit requiring nitrification in dry weather and expansion of wet weather capacity to treat wet weather flows to meet NPDES permit monthly and weekly suspended solids limits. Maximum mOflth dry weather flow of 25 mgd requires nitrification. Peakwet weather flows above 103 mgd require hydraulic modifications. Project Trigger: Project Type: 50% Capacity; 50%Performance Improvement SDC Eligibility: 59%' Estimated Project Cost: $10,189,680 Expected Cash Flow: FY 04-05 = $10,078; FY 05-06 = $193,552; FY 06-07 = $1,318,986; FY 07-08 = $4,900,064; FY 08-09 = $3,767,000 2007 -08 Exoenditure/Cateoorv: Prior Years Est Act. 2008-09 2009-10 2010-11 2011-12 2012-13 Total Design/Construction $1.522,616 $4,900,064 $3,767,000 0 0 0 0 $10,189,680 Other 0 0 0 0 0 0 0 0 Total Cost $1,522,616 $4,900,064 $3,767,000 $0 $0 $0 $0 $10,189,680 Page 58 'FY 08-09 BUDGET AND eIP ATTACHMENT A - Page 60 of 71 c Metropolitan Wastewater Management Commission Capital Improvement Program SODIUM HYPOCHLORITE CONVERSION .4 ....--- :::: ~, :'" ==- "'-) .-r . ~L d ~-j' t f; ; , L. . ..;.-~ m~":~ ~' Ptojec:t Phasing E/;ige~ngtleid WPCF ',~7' -L I . ~..........:- Description: Convert existing chlorine gas system to sodium hypochlorite for the base flow. Retain the existing chlorine contact basins for the disinfection process. Install system with capability for high rate disinfection of primary effluent diversion using dosages of sodium hypochlorite into a new contact basin structure. The new contact basin has been split off of this project and is now part of a different MWMC project (Peak Flow Management Im'provements), so the 'budget for that portion of the project has been moved also. Staff anticipates including upgrades of the existing recreational vehicle (RV) wastewater dump station to accommodate boat wastewater dumping in the construction bid documents for the sodium hypochlorite conversion project. The boat wastewater dump modification will be designed and funded by the Oregon State Marine Board that the MWMC approved for implementation at the September 21,'2006 public meeting. The recommended project budget below ($7,890,000) includes $80,000 of new money allocated to the project for the boat wastewater dump that will be reimbursed by the State agency after construction is completed. Status: Under design by HDR Engineering. Justification: Liquid sodium hypochlorite and sodium bisulfite system will replace the existing chlorine and sulfur dioxide gas systems and increase the disinfection capacity from 175 mgd to 277 mgd. The high rate disinfection of the primary effluent is a key component of the primary/secondary split treatment, which is needed for meeting the peak flow capacity needs of the treatment plant: Project Driver: Operator and community safety issues and meeting flow capacity requirements for peak flows. Project Trigger: Phasing with other related projects and need to meet peak flow treatment requirements. Project Type: 50% Capacity; 50% Perfonnance Improvement SDC Eligibility: 15% Estimated Project Cost: $7,890,000 Expected Cash Flow:, FY 06..07 = $1,353; FY 07-08 = $510,000; FY 08-09 = $4,140,000; FY 09-10 = $3,238,647 Exoenditure/Cateaorv: Prior 2007-08 Years Est. Act. 2008-09 2009-1 0 2010-11 2011-12 2012-13 Total $1,353 $510,000 $7,378,647 0 0 0 0 $7,890,000 0 0 0 0 0 0 0 0 $1,353 $510,000 $7,378,647 $0 $0 $0 $0 $7,890,000 Design/Construction Other Total Cost, , Page 59 FY 08-09 BUDGET AND eIP ATTACHMENT ~ - Page 61 of 71 Metropolitan Wastewater Management Commission Capital Improvement Program PEAK FLOW MANAGEMENT IMPROVEMENTS ProJect Pha~1l9 + t(~efte--St::'ring~eld wper: , '~; Description: The Peak Flow Management project combines several project elements described in the 2004 Facilities Plan into one project. The individual projects elements included in the Peak flow Management project are 1) The Parallel Primary/Secondary Treatment project, 2) the Bankside Outfall project, 3) the Outfall Mixing Zone Study, and 4) the design and construction of the high rate disinfection basins, which was pulled out of the Sodium Hypochlorite Conversion project and added to the Peak Flow Management project. These project elements combine to provide the hydraulic infrastructure necessary to convey the peak flow through the plant, split the flow into the parallel primary and secondary treatment trains, provide additional disinfection capacity, and discharge the treated flow in accordance with the 2004 Facilities Plan. Status: Detailed design stage. Construction contract should be entered into by end of year. Justification: This project expands the peak wet weather treatmeT)t capacity to 277 mgd through flow management techniques. Project Driver: DEQ requirement that the peak wet weather flow (5-year, 24-hour rain event) be treated by the E1S WPCF and meet secondary effluent standards (diverted blended flow receives equivalent of primary treatment). Project Trigger: Elimination of sanitary sewer overflows by the year 2010. Project Type: 100% Capacity Improvement SDC Eligibility: 30.2% Estimated Project Cost: $24,974,000 Expected Cash Flow: FY 06-07 = $28,913; FY 07-08 = $3,366,000; FY 08-09 = $13,500,000, FY 09-10 = $8,079,087 Prior 2007-08 Exoenditure/Cateoorv: Years Est. Act. 2008-09 2009-10 2010-11 2011-12 2012-13 Total Design/Construction $28,913 $3,366,000 $21,579,087 0 0 0 0 $24,974,000 Other 0 0 0 0 0 0 0 0 Total Cost $28,913 $3,366,000 $21,579,087 $0 $0 $0 $0 $24,974,000 Page 60 _ FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 62 of 71 Metropolitan Wastewater Management Commission Capital Improvement Program ODOROUS AIR TREATMENT - PHASE 1 Description: Justification: Status: Project Driver: Project Trigger: Project Type: Improvement SDC Eligibility: ,.c LJji . _, ~'!!L ::;[ ~ [I" r---, I .'~.. !t"-- =' ~ j ! ; Project Phasing +N.. ~spcir.1gfieoidWPCF ~~ ~~~'-': ~., ,=" 'L' ._ _~' ,rr;,;,' '.'" "-'iV' Biofilters or other treatment for odors from primary clarifiers, expanded pretreatment area and new influent pumping station. Includes the complete covering of the primary clarifiers, which, would be a deviation from the Facilities Plan concept of covering only the weirs and launders in the clarifiers. ' , Primary clarifiers are odor sources. Although the Facilities Plan indicated that most odors are generated and can be captured at the weirs and launders of the clarifiers, information from other treatment plants which have used this technology indicates that the only effective means of odor control on the primaries would be complete coverage. This change in concept must be further investigated and approved through the Commission before implementation. The expanded pretreatment facil~ties and new influent pumping station will also be additional odor sources that must be dealt with. Preliminary design stage. Maintain MWMC's status as environmental stewards. Address neighborhood odor complaints and community concerns regarding odors. Coordination with the design of the pretreatment expansion and influent pumping expansion and must be on-line in coordination with construction of those facilities. 100% Performance 26% Estimated Project Cost: $10,834,000. (Note that the project cost was increased from the FY 07/08 budget to account for inflation associated with a more than one year postponement of the project. The project was postponed to accommodate focused attention on capacity-related projects, which have a higher schedule priority. The budget is consistent with the CH2M HILL 2006 cost estimate for the project inflated to the midpoint of construction). Expected Cash Flow: FY 06-07 = $45,746: FY 07-08 = $535,000; FY 08-09 = $4,000',000; FY 09-10 = $6,253,254 Prior 2007-08 Exoenditure/Cateaorv: Years Est. Act. 2008-09 2009-10 2010-11 2011-12 2012-13 Total Design/Construction $45,746 $535,000 $10,253,254 0 0 0 0 $10,834,000 Other 0 0 0 0 0 0 0 0 Total Cost $45,746 $535,000 $10,253,254 $ 0 $ 0 $ 0 $ 0 $10,834,000 Page 61 __- FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 63 of 71 Metropolitan Wastewater Management Commission Capital Improvement Program ODOROUS AIR TREATMENT - PHASE 2 ',","",.' ~,~ '~ .fI" ~, .:'"'" ;"'~, ' --~'-:---f ~,,' I, : I ' ! ' Project Phasing EUgl!'~Sp.ingfi",ld W?CF N I -r ~- :;=--'- '-~..,---&""""- ...:....-=$-~ .c 1:L tt,[ ~-::;: ',1 '~.' Description: Provide covers over new Gravity Sludge Thickeners (primary sludge thickeners) and convey odorous air to biofilters. Expand biofilters to accommodate the additional needed odor control. Justification: Gravity Sludge Thickeners will be a significant source of odor if not controlled. Status: Planning stage. Project Driver: Maintain MWMC's status as environmental stewards. Address neighborhood odor complaints and community concerns regarding odors. Project Trigger: New construction requires expanded odor control. Must be coordinated with the construction of Gravity Sludge Thickeners Project Type: 100% Periormance Improvement SDC Eligibility: 26% Estimated Project Cost: $1,704,000 Expected Cash Flow: FY 08-09 = $252,000, FY 09-10 = $1,452,000 Prior 2007-08 Exoenditure/Cateoorv: Years Est. Act. 2008-09 2009-1 0 2010-11 2011-12 2012-13 Total Design/Construction 0 0 $1,704,000 0 0 0 0 $1,704,000 Other 0 0 0 0 0 0 0 0 Total Cost 0 0 $1,704,000 0 0 0 0 $1,704,000 Page 62 FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 64 of 71 Metropolitan Wastewater Management Commission Capital Improvement Program PRIMARY SLUDGE THICKENING ~-y -~-~ ~ ' ~' ' (' " -4~~"- Jii~ - ,= ~ ,_i': AJ _ . ;;;" , r - '---t I, ~- -=--- -~~=~~, .'D._: , Project Phasing E~~WPCF .._.~, ~,',itl" I /. 1 \ ' '..---.'- ",- =-= :-.;;:: :. ,--:...' Description: Thin primary sludge pumping and piping systems to gravity thickeners, two 50' foot diameter gravity thickeners (covered for odor control), supernatant overflow pumping and piping, thickened sludge piping/pumping to digesters. Indudes funds for landscaping in vicinity of thickeners. See Odorous Air Treatment for tre~tment of odors. Status: Planning phase. Justification: Meet class B biosolids requirements without building additional digester capacity. Also, keep sludge blanket lower in primary clarifiers to avoid washout of blanket during peak flow events. Project Driver: Meet class B biosolids requirements during peak two-week solids loading event with all three digesters in service. . Project Trigger: Availability of sludge thickening capacity is required prior to next scheduled digester cleaning (Le., before 2013). Improvement SDC Eligibility: 65% Estimated Project Cost: $4,498,000 (Note that the budget for this project was adjusted to account for inflation. The adjusted budget reflects the 2006 cost estimate adjusted for inflation at a rate of 5% per year). Expected Cash Flow: FY 07-08 = $190,000; FY 08-09 = $1,692,000, FY 09-10 = $2,616,000 Prior 2007 -08 Exoenditure/Cateaorv: ' Years Est. Act. 2008-09 2009-1 0 2010-11 2011-12 2012-13 Total Design/Construction 0 $190,000 $4,308,000 0 0 0 0 $4,498,000 Other Ci 0 0 0 0 0 0 0 Total Cost $0 $190,000 $4,308,000 $0 $0 $0 $0 $4,498,000 Page 63 FY 08-09 BUDGET AND ClP ATTACHMENT A - Page 65 of 71 Metropolitan Wastewater Management Commission Capital Improvement Program TERTIARY FILTRATION - PHASE 1 ~v- " ~;~,-A'" ~..~'jiY ,., ..."",-,'.' ....,. .r,..., ~ nl!~~ ~.., ----~_:.- ~;;'l Ii r-- --t ~. ,~ I ~ t i Project Ph~5ing EUge~'S.pl,.jr..;gfjF.!''Id "'/.PCF N I -,-- :..L ., - ~' ....--~~ ",~'b._ _I~;;'" ',"'1 Description: This project installs infrastructure/support facilities for 30 mgd of filters for tertiary filtration of secondary treated effluent; however, this first phase only installs filter cells sufficient for 10 mgd of treatment. Future phases of the project will install the remaining filter cells. Includes funds for landscaping in vicinity of facilities. Justification: Up to 10 mgd of filtration is required by 2010 to meet dry season mass limits, with the need. for filtration increasing to up to 30 mgd by the end of the planning period (2025). The Facilities Plan proposes phasing filters on an as-needed basis, including as needed to facilitate development of Level 4 reuse. Filtration provides high quality secondary effluent and potential level 4 reuse water. Also, filtration is needed to assist with meeting wet season mass load requirements during peak flow events. Status: Planning stage. Project Driver: Performance reliability to meet the dry weather NPDES total suspended solids limits of less than 10 mg/L, reuse development, and compliance with effluent limits during peak flow conditions. Project Trigger: NPDES permit compliance for TSS: Dry weather maximum month flow in excess of 49 mgd. Also, initially to provide higher quality effluent so that reuse can be developed. Improvement SDC Eligibility: 42% Estimated Project Cost: $14,685,000 Expected Cash Flow: FY 07-08 = $317,000; FY 08-09 = $2,600,000; FY 09-10 = $8,000,000; FY 10-11 = $3,768,000 Prior 2007-08 Exoenditure/Cateaorv: Years Est. Act. 2008-09 2009-1 0 20 1 0-11 2011-12 2012-13 Total Design/Construction 0 $317,000 $14,368,000 0 0 0 0 $14,685,000 Other 0 0 0 0 0 0 0 0 Total Cost 0 $317,000 $14,368,000 0 0 0 0 $14,685,000 Page 64 FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 66 of 71 Metropolitan Wastewater Management Commission Capital Improvement Program EFFLUENT REUSE - PHASE 1 4E, V"~- -- "!"I~ lltl~l ' " :.:sijl;-:~ ,WilFJ' :.i!!!!.~ :::.-" . l ~ : Project Phasing + E.ne--~f.j'!!!tdWPCF W h . '::-~..'.'=-' ~_ , .,~~ .~_.::-:=- ' ,.I 'J~7;:=~::h ;:,. "0/"- ~ :::::;-".h Description: This project is the first package ,of funding for wastewater effluent reuse to address thermal load'issues and for multiple environmental benefits. This project combines two projects identified in the 2004 Facilities Plan; the Level II Reuse at Seasonal Industrial Waste and Level 4 Effluent Reuse Demonstration Projects. Project components may include additional treatment, disinfection, pumping, pipeline, and distributionlirrigation systems. The projects will be better defined as the planning for reuse continues and as markets for reuse are identified. Status: Planning Stage Justification: Implements reuse so that thennalload is removed from the Willamette River and for multiple environmental benefits. ' Project Driver: Expansion of effluent reuse programs. Current NPDES thermal load compliance. Project Trigger: Potential exceedance of NPDES thermalloaq limit. Identification of water needs for potential clients. Project Type: 100% Performance 1m provement SDC Eligibility: 26% Estimated Project Cost: $3,325,000 (2006 cost inflated to FY08-09). Expected Cash Flow: FY 08-09 = $2,000,000; FY 09-10 = $1,218,000 Prior 2007-08 Exoenditure/Cateoorv: Years Est. Act. 2008-09 2009-1 0 2010-11 2011-12 2012-13 Total ..' Design/Construction $7,000 $100,000 $3,218,000 ' 0 0 0 0 $3,325,090 Other 0 0 0 0 0 0 0 0 Total Cost $7,000 $100,000 $3,218,000 $0 $0 $0 $0 $3,325,000 Page 65 ' FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 67 of 71 Metropolitan Wastewater Management Commission Capital hnprovement Program EFFLUENT REUSE - PHASE 2 "- -..,C ,=~': ~ ~_~!iIi~: ""V 2!I j ~- '- t l ,,~.~~~wY ~, t e Pro-ject Phasing Etl9l?f'lo!!-s.pt'~ngmeid ViPCF N' -L t b:,. .~;~ n',_, ~'i~ ......... "~..,:'...:.", jilL. __: , ,;;';' ,. J T- . - '" Description: This project is identified as Level II Effluent Reuse at the Biocycle Farm in the 2004 Facilities Plan. Provide 1.5 mgd of Level 2 reuse water at the Biocycle Farm. Installation of dedicated' 'reuse irrigation pipeline and microspray system. Total reuse of 3.75 mgd in July and August. The project may change as planning progresses and other opportunities for reuse emerge. Implements Level 2 reuse so that thermal load is removed from the Willamette River. Justification: Project Driver: Expansion of dry weather effluent reuse programs. Current NPDES thermal load compliance. Project Trigger: Potential exceedance of NPDES thermal load limit. Project Type: 100% Performance Improvement , SDC Eligibility: 26% Estimated Project Cost: $5,152,000 Expected Cash Flow: FY 09-;10 = $2,500,000: FY 10-11 = $2,652,000 Prior 2007-08 Exoenditure/Cateaorv: Years Est. Act. 2008-09 2009-1 0 2010-11 2011-12 2012-13 Total Design/Construction 0 0 0 $5,152,000 0 0 0 $5,152,000 Other 0 0 0 0 0 0 0 0 Total Cost $0 $0 $0 $5,152,000 $0 $0 $0 $5,152,000 Page 66 . FY 08-09 BUDGET AND eIP ATTACHMENT A - Page 68 of 71 Metropolitan Wastewater Management Commission , Capital Improvement Program EFFLUENT REUSE - PHASE 3 '-.;:a',~'. ~'II- __'---011I= ,;;;. ,:...- =..,~' v' "'-1l --. t Project Phasing +N ~'Spt'ir>9f.tehi WPCF .... .. -.. i:' . .........:=.. .", ~,S,..~,_ ' '_ ,,~~J"" ''-'IT'~ .',,' ... ~ ."i!!P.':---:' Description: This project is the Facilities Plan project known as Penn anent Level IV Reuse. It is to provide 2.5 mgd of permanent Level IV reuse water to local greenspaces and community areas. Project components may include additional treatment, disinfection with UV system, pumping, pipeline, and distributionlirrigation systems. The project will be better defin'ed as the planning for reuse continues and as markets for reuse are identified. "1, Status: Planning Stage Justification: Implements reuse so that thennalload is removed from the Willamette River and for multiple environmental benefits. Project Driver: Expansion of effluent reuse programs. Current NPDES thennalload compliance. Project Type: Potential exceedance of NPDES thennalload limit. Identification of water needs for poten~ial clients. 100% Perfonnance Project Trigger: Improvement SDC Eligibility: 26% Estimated Project Cost: $6,542,000 Expected Cash Flow: FY 11-12 = $1,699,000; FY 12-13 = $4,843,000 Prior 2007-08 Exoenditure/Cateoorv: Years Est. Act. 2008-09 2009-10 2010-11 2011-12 2012-13 Total Design/Construction 0 0 0 0 0 $6,542,000 0 $6,542,000 Other 0 0 0 0 0 0 0 0 Total Cost $ 0 $ 0 $0 $0 $0 $6,542,000 $0 $6,542,000 Page 67 ' FY 08-09 BUDGET AND CIP ATTACHMENT A- Page 69 of 71 Metropolitan Wastewater Management Commission Capital Improvement Program WASTE ACTIVATED SLUDGE THICKENING . if" ---~,. ~~ ..----- ' f Description: Justification: Status: Project Driver: Project Trigger: ~'...4 '/7-"'~' ,'!-j- r- -w J ~ .. -!Z: __......;...:J~. '~ I' " ' , , ! Project Phasing E<igen'!i-'~ingti""ld \W'CF t<l -L I .:-r .- ..;;:.;:......~'L,._.:..,...., -'~,.- =::. Third gravity belt thickener (GBT) with associated at grade building. Assumes additional basement floor space is not required. Includes funds for landscaping in vicinity of thickeners. Provides additional capacity for Waste Activated Sludge 0NAS) thickening and, along with addition of primary sludge thickening, will help to eliminate the need for additional digester capacity. Planning stage. Additional capacity to provide WAS thickening with one unit offline at upper limn flow projections. Nitrification required by the NPDES permit and increasing wastewater flows and loads generates more WAS solids. Provide ability to conduct recuperative thickening so that need for additional digestion volume can potentially be deferred. Exceeding solids and hydraulic loading rate design criteria. The latest evaluations of need for Waste Activated Sludge thickening indicates a need by about 2012 or later. After the secondary treatment modifications are completed and operational for a time, the timing of need for this project should be reevaluated. Estimated Project Cost: $3,901,000 Improvement SDC Eligibility: Expected Cash Flow: Exoenditu re/Cateoorv: Design/Construction Other Total Cost 100% FY 12-13 = $3,901,000 Prior 2007-08 Years Est. Act. 2008-09 0 0 0 0 0 0 $ 0 $ 0 $ 0 2009-1 0 o o $ 0 2010-11 o o $ 0 2011-12 o o $ 0 2012-13 $3,901,000 . 0 $3,901,000 Total $3,901,000 o $3,901,000 Page '68 FY 08-09 BUDGET AND CIP ATTACHMENT A - Page 70 of 71 Metropolitan Wastewater Management Commission Capital Improvement Program INCREASE DIGESTION CAPACITY AND PROVIDE CLASS A CAPABILITY I . Description: Justification: Project Driver: Project Trigger: Improvement SDC Eligibility: -ii'UJi;. ~ .~. - lli ~r: -=- ~ i t = lr~ =..;;:-m Project PNtsin.g Eugene-~WPCF ~=' ~--_:- .l:L. . .1llIi! - ?-. Installation of either a fourth conventional high rate digester for continued production of Class B biosolids, or conversion of existing conventional anaerobic digestion system to an advanced digestion system capable of producing Class A biosolids. Continue to meet, at a minimum, the requirements for ClassB with the' ability to take one digester out of service for cleaning. This project addresses 1) the future need for more anaerobic digestion capacity, and 2) the potential future need to change the existing digestion process to produce Class A biosolids as a strategy to secure a wider range of future beneficial end-use options. The capacity issue will be influenced by several operational factors including the effectiveness of new primary sludge and expanded WAS thickening processes, as well as digester cleaning protocols and schedules. qkewise, the decision to invest in an advanced digestion process to produce Class A biosolids will depend on the course of regulatory policy, scientific findings, and public attitudes toward land application of Class B biosolids over the next several years. In both cases, observation over the next several years is required prior to making a decision on what type of digestion facilities are needed and when they will be needed. A study of the anaerobic digestions system capacity and process alternatives is planned to begin in FY 2011. This study will be conducted as part of the Facilities Plan Engineering Services contract with CH2M HILL. The trigger for design and construction of new digestion facilities will depend on the findings of the digestion system capacity and process alternatives study, which will be started in FY 2011 under the continuing Facilities Plan Engineering Services contract. 54% Expected Cash Flow: Estimated Project Cost: $25,777,000 FY 12-13 = $2,034,000; FY 13-14 = $16,765,000; FY 14-15 = $6,978,000 Exoenditure/Cateaorv: Design/Construction Other Total Cost Prior 2007-08 Years Est. Act. 2008-09 2009-1 0 2010-11 2011-12 2012-13 Total 0 0 0 0 0 0 $25,777,000 $25,777,000 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $25,777,000 $25,777,000 Page 69 FY 08-09 BUDGET AND ClJ> ATTACHMENT A - Page 71 of 71