Loading...
HomeMy WebLinkAboutPermit Building 1996-6-12 COMM ERCIALlIN DUSTRIAL. PERMIT APPLICATION ~ . JOB NUMBER 9/~r-=3?/ INSPECTION LINE: 726.3769 OFFICE: 726.3759 225 Fifth Street, Springfield, Oregon 97477 ~ ?""?c>~ PHONF' 77/L--,'; ~ STATf' ~. ZIP: ~? Y'?"? DESCRIPTION OF WORK:.0':~U NEW REMODEL)" ADDITION ~:-"~~ /~L/--=, <~~~ DEMOLISH OTHER VALUE: -;s ~ NAME ADDRESS PHONE ARCHITECT: CONST. CONTRACTOR'S NAME ,. ADDRESS 9-~re ~~CTOR' GENERAl' .fA-~----'-F..17~~A!!=-;_ .i:F.u:;;~ :9?Y6?, ~?:? PLUMBING' EXPIRES PHONE rZ9? b;1'i>"f-~~ ". MECHANICAl' ELECTRICAl' PLUMBING NO, . FEE MEr.HANIr.AI r.HARGE .", OFF N-IABGj 'I~ I I I I I I Single Fixture Relocated Bldg. (new fix. addtll Water Service Furnacel burner & vent < 100.000 BTUs Furnace/burner & vent > 100.000 BTUs It. Floor furnace and vent Suspended wall or tloor mounted unit healer Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent System apart from AC or hlg. I . Mechanical exhaust hood and duct I Sanitary Sewer fl. Storm Sewer ft. Backflow Device ".Permi,! Issuance $10.00 TOTAL PERMIT TOTAL PERMIT - OFFICE USE - HANDICAP ACCESS' QUAD AREA LAND USF' FLOOD PLAIN' . OF BLDG~' . OF UNITS: ZONING' LIGHTING POWER BUDGET: WATER HEATER:, OCCY GROUP' CONSTR, TYPF' . OF STORIES: HEAT SOURCF. SQ. FT. $/SQ. FT. VALUE SQ. FTG MAIN SQ, FTG ACCESS X X SQ. FTG OTHER X TOTAL VALUE OF PROJECT. PLAN CHECK F~ :::< c;:-~,':j' RCPT' ::2/~J DATE C-/:2-SC BY -LZ-.-?-~ 15% Stat,e Surcharoe I MECHANICAL 15% Slate Surcharoe I PAVING 1 BUILDING PERMIT I ~I I I I ~.~ 'i:J.l PLUMBING I I FT. -I FT. I I DEMOLITION 5% Stale SurcharQe FENCE VAIIIF. $ SIDEWA~ SUBTOTAL PERMITS I SYSTEMS DEVELOPMENT '7'/. 59 CURB CUT TOTAL PERMIT FEES EXCLUDING ELECTRICAL b6. b2. ,. REQUIRED INSPECTIONS . It Is the responsibility of the permit holder to see that all Inspections are made at the proper time. To request an Inspection, call 726.3769 (recorder), state your City designated job number, job address, type of Inspection requested and when you will be ready for Inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day, SITE INSPECTION: To be made after excavatlon, but prior to setup of forms. UNOERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work Is covered. ROUGH PLUMBING.' ELECTRICAL & MECHANICAL: No work is to ' be covered until these inspections have been made and approved. PAVING: After gravel Is In place but prior to placing asphalt or concrete. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel In place, but prior to placing concrete. FIREPLACE: Prior to placing facing materials and before framing inspection. SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special Inspector shall be employed by the Owner I Contractor during construction.of the following work. A copy of the special testing reports. shall be furnished to the Building Division. ATTIC DRAFT STOPS & , CURTAIN WALLS ' ,j' FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place arid all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. STRUCTURAL CONCRETE: In excess of 2500 P,S.1. (306 a.1) CONCRETE SLAB: To be made after all Inslab building service equipment, conduit, piping, accessories and other ancillary equipment Items are in place but before any concrete is placed. STRUCTURAL WELDS: Performed on the job. (2722 f) UNDERGROUND: Plumbing. electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. INSULATION & VAPOR BARRIER: To be made after all Insulation and required vapor barriers are in place but before any lath or gypsum board Interior wall covering Is applied, HIGH STRENGTH BOLTING: During all bolt installation and tightening operations. (306 a,6) SPRAYED ON FIREPROOFING: U,B,C. Standards 43,8, UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to Installation of floor Insulation, decking or floor sheathing. FIRE & SEPARATION WALL: Located and constructed according to plans. SPECIAL GRADING. EXCAVATION AND FILLING: , During earthwork. (306 a,11 & Chapter 29) POST & BEAM: To be made prior to Installation of floor Insulation, decking or floor sheathing, LATH AND lOR GYPSUM BOARD: To be made after all .' lathing and gypsum board, interior and exterior, Is in place but before any plastering Is applied or before gypsum board joints and fasteners are taped and finished. / GLU.LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U,BG, STDS. ,25-10,11). STRUCTURAL MASONRY: (306 a,7) FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals In accordance with UBC 2415. SIDEWALK & DRIVEWAY: Aequired for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. .In addition to the Inspec- tions specl fled, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. ------------------------------------------------------- FINAL MECHANICAL SITE PLAN REVIEW BOARD: Must be requested 2 days In advance of the date you wish Inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting this inspection. )( FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made untll a Certificate of Occupancy has been issued by the Building Division and posted on the premises. FINAL PLUMBING FINAL ELECTRICAL FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS. ) PLANS REVIEWED BY 0- /~~ _ f//v DATE .<""/.:) .~ By signature, I state and agree, that I have carefully examined the completed application and do hereby certify th~t all information herein Is true and correct, and I further certify that any and all work performed shall be done In accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with OAS 701.055 will be used on this project. - I further agree to ensure that all required inspections are requested at the proper tlme, that project, address Is readable from the street, that the permit card Is located at the front of the property, and the approved set of plans will remain on the site at all times durln~nstructlon. , Slgnatu~p OMA )}, #.0 t?M~_ fI, C, It. Datp (;, -- /,;;) - C((P I ' - VALIDATION: AMOUNT RECEIVED: /C,c.C 2. RECEIPT ': '2 /q~:;;; DATE PAID' tC-/? ~9C RECEiVED BY. --?~ /~ J