HomeMy WebLinkAboutPermit Demolition 2003-9-29
Status
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
SITE ADDRESS: 433 HARLOW RD
ASSESSOR'S PARCEL NO.: 1703224407200
.
.- CITY OF SPRINGFIELD
Buil~ing/Combination Permit
PERMIT NO: COM2003-00980
ISSUED: 09/29/2003
APPLIED: 09/26/2003
EXPIRES: 03/29/2004
VALUE:
Springfield TYPE OF WORK: Duplex
TYPE OF USE: Demolition
PROJECT DESCRIPTION: 443 and 4431/2 Harlow Rd - Demolition and sanitary sewer cap
Residential
Owner: COCKERLINE MARTHA LIFE EST
Address: 2525 CAL YOUNG RD APT 315 EUGENE OR 97401
Contractor Type
General
Plumbing
Contractor
OWNER
OWNER
# of Buildings:
Primary Occupancy Group: R-3
Secondary Occupancy Group:
Primary Construction Type VN
Secondary Construction Type:
# of Bedrooms:
SETBACKS
Frontyard Setback:
Side 1 Setback:
Side 2 Setback:
Rearyard Setback:
Solar Setbacks:
Street Improvements:
Storm Sewer Available:
Special Instruction:
Notes:
I CONTRACTOR INFORMATION I
License
Expiration Date Phone
~\O
_,-,0 .,\\,-1
BUILDING INFORM&Nl')N:P~ \)~~,o~
\0-" J. ~0 '" r/..J::JO
# of St9{le,<l,o~ '0'1 \\,0~\0'i> ~p...~ ~c:.i \}\0'i>iot Size:
H~'Ot ~\fb\;t~0 ~\' 0 ~ <<-0 ~ l\\0~ Ft 1st Floor:
<(;.~~I!.t ~e.\ll:~\' <<-~O~ '/0,0'0 0 \0\0~. c?%fFt 2nd Floor:
~ ~'ie~s:P'O ~ co9 . <<-0 ~o\~~ Sq Ft Basement:
,o\\O~~~);ype:o'O\~ ~o\~"",'ct '?,tJ>.,\. Sq Ft Garage/Carport
o",\~~'ti!Y ~l!lh: ~\0~' O~ f!J7;?:. Sq Ft Other:
~ OP'l -(o\) ",0 C0 O~0t()(),~ Impervious Surface Area:
\~ p,f\. ~ \\. .,<\0 :-.0
p"''':; .....".--: lC' .......
I DE""'.....y"AE!'fl,.......u",,'ATION I
~vI - REQUIRED PARKING
Overlay Dist: Total:
# Street Trees Rqd: Handicapped:
Paved Drive Rqd: :-/--Compact:
% of Lot Coverage: ,\\'t. ~~IJ'
_:,o\'i''t. \~\:S\~, \~o.
I PUBLIC IMP.JiUil\'EM~.sl. -;.;,\\\'il ~()~'t.\) (-
\ I II ." \I..~'v
\\\l ~~ '?'t.W~i'i.) ~~~\'il \>.'9ldewalk Type:
,\\'\ ~'i'\... \l IJ" ~\\.
\>o~,~ x.~c,'i;:. '?'t.'i'\ ''DownspoutslDrains:
c,lJ~~'O~ 'i.)~
\>o~i
Paee I of2
Status Issued
'225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
.
PERMIT NO: COM2003-00980
ISS,,: 09/29/2003
AP~D: 09/26/2003
EXPIRES: 03/29/2004
VALUE:
I Valuation Descriotion I..
Description
Type of Construction
$ Per Sq Ft
or multiplier
Square Footage
or Bid Amount
Value
Date Calculated
Total Value of Project
Fpp~ Pair! I
Fee Description
+ 10% Administrative Fee
+ 7% State Surcharge
Demolition
Sanitary or Storm Sewer Cap
Amount Paid
Date Paid
Receipt Number
$9,00
$6.30
$45.00
$45.00
9/29/03
9/29/03
9/29/03
9/29/03
1200200000000002225
1200200000000002225
1200200000000002225
1200200000000002225
Total Amount Paid
$105.30
I Plan Reviews I
To Request an inspection call the 24 hour recording at 726-3769. All inspection requested before 7:00 a.m.
will be made the same working day, inspections requested after 7:00 a.m. will be made the following work
day.
Rpouirpr! ~
1 Demolition: After demolition is complete, sewer is capped or septic is pumped and filled and inspection is
requested and approved, and all debris is removed from the site.
2 Sanitary Sewer Cap: Capped within five (5) feet of the property line and capped with an approved material as
required by the code.
By signature, 1 state and agree, that 1 have carefully examined the completed application and do hereby certify that all
information hereon is true and correct, and 1 further certify that any and all work performed shall be done in accordance with
the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and
that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety.
1 further certify that only contractors and employees who are in compliance with ORS 701.005 will be used on this project.
1 further agree to ensure that aU required inspections are requested at the proper time, that each address is readable from the
street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all
times during construction.
~;;/ ~f--lAA?~
Owner or Contractors Signature
q /;..51'10'2..
Date
Paee 2 of2
I~
"'225 Fifth Street
Springfield, Oregon 97477
541-726-3759 Phone
Job/Journal Number
C0M2003-00980
C0M2003-00980
COM2003-00980
COM2003-00980
Payments:
Type of Payment
Check
.
.
,,,~,,c"""""_D
Ill', ....... .-...~ ". ",
,. .. .
~ - .
, ,
~_... '
:.... - "'. ;
J. "
-.."""""""",-,.,' .~...j ..'
Receipt #: 1200200000000002225
Description
+ 7% State Surcharge
+ 10% Administrative Fee
Demolition
Sanitary or Storm Sewer Cap
Paid By
REBECCA STENZEL
Received By
djb
Check Number
Batch Number Authorization Number
City of SpringfielciOfficial Receipt
Development Services Department
Public Works Department
Date: 09/29/2003 1:24:57PM
Amount Paid
Item Total:
6.30
9.00
45.00
45.00
S105.30
How Received
In Person
Payment Total:
Amount Paid
$105.30
S105.30
f~
. u. CITY OF S'.._2INdFIELD, OREGON 0
SPRINGFIELD
225 FIFTH STREET. SPRINGFIELD, O~ 97477 . PH:(541)726-3753 . FAX: (541)726-3689
-
DEMOLITION PERMIT APPLICATION
Address:
43:2, C\.~ Ll33~ Ho..ILfu.J RJ..
Structure to be Demolished:
Y\OL.l~
Job Number: COWl 2003 - 00 9 go
The applicant is hereby notified that any redevelopment of the subject site must
comply ",~th all of the applicable laws, codes, ordinances, polices and plans in
effect at the time the redevelopment proposal is accepted as complete for City
re\~ew. This would include correction of substandard conditions associated ",~th
the present development. Examples of such corrections may include
modification of inadequate drainage facilities; compliance ",~th building set-
backs from property lines; correction of substandard sidewalks and street
improvements, including driveway width and placement; and other corrections
which may be necessary to comply with existing development standards.
Furthermore, if an existin.g use is demolished or otherwise removed prior to the
development of the proposed use, then the system development charge credit for
the previously existing use shall expire two years after the date ofissuance of the
demolition permit or other removal of the previously existing use. (Springfield
Municipal Code 3-416(1)).
My signature below indicates that I have read and understand the above
conditions relating to the demolition of the above mentioned structure. '
It ;I .-A t-J AM -" J..
9/?-< In?,.
Signature
Date
"
SPRINGFIELD
225 FIFTH STREET. SPRINGFIELD, OR 97477 . PH:(541)726-3753 . FAX: (541)726-3689
-
DEMOLITION PERMIT APPLICATIONS
Your demolition permit is currently being processed. There may be a slight delay, of
up to 2 working days for small structures, dueto the time required to review the
history of the structure to determine if it needs to be documented before demolition.
This documentation is for archival purposes only and 'will not affect the granting of
the demolition permit. If the structure is very large or complicated the
documentation process may take up to a maXimum of 4 working days. '
Documentation ....'ill consist of photographing the building, taking measurements and
making scaled dra\\'ings. The documentation will be undertaken by the City at no cost
to you. Documentation is being done on all structures dated prior to 1940 that may
have historic importance to the City's development.
THIS DOCUMENTATION WILL NOT IMPEDE THE DEMOLmON PROCESS.
An age cut-off of 1940 was chosen because this is the date that the National Parks
Service and The Springfield Development Code use to determine potential historic
significance. '
If you would prefer to complete this documentation yourself you must prO\'ide the
City with,the following information: 1) black and white photographs of each
elevation, a floor plan ....'ith measurements, and 2) a set of elevation drawings with
measurements.
Thank you for your patience.
I grant the City of Springfield permission to enter my property to complete
documentation prior to the requested demolition of the structure located at:
Address: _(,I'1..?.. / 4.3.3 Y,1 Jdi:J.LI m..u t<,.1.. ~(,.r {'; ^j ~ ,,\A
Property Owner Signature: I<."i _ xli-,.M-z.{
Job Number: (j)1?! 2003 -009 gO
Date: C;-Zb -03
-Ej ~ f:illi il EJ; ~_
drdintl@connect-america.net
.
.
.
.
.
. .
o.,'f\OEN1'\A.L .
COr.. .
.....
PO Box 40876
Eugene Oregon 97404 USA
5414619115
541 461 8995 faxx
Douglas J. Moore
President / Sale: Proprietor
August 19, 2003
Minds In Motion
3356 Kings Edwards Court
Eugene, Oregon 97401
Attn: Becky Stenzel
Re: Pre-demolition asbestos survey
433 Harlow Road, Springfield Oregon
. .
On July 30, 2003 an inspection and site survey for asbestos containing building
materials was conducted at the above-mentioned addresses. From the
homogeneous list of building materials established, Roofing, ceiling tile and
several types of flooring materials were sampled and analyzed by an
independent laboratory, Magnum Environmental Services. The results indicated
that no asbestos was present in the materials sampled.
The house, following this exercise, is considered ready for demolition pursuant to
the rules specified in DEQ Division 340 and LRAPA's Title 43 regarding
asbestos.
All documentation from these activities and the credentials of those who
performed them are on file at the offices of Pacific Environmental Group Inc.
If you or any of your associates have any questions regarding the activities
described, please don't hesitate to call me at 541-461-9115 or 541-954-4369.
Thanks for your patronage.
-~-Q 1 ' vtI\
Douglas J. Moore, Inspector.
Joug'as -nternationa: :nc.
(Jlmmf':1l'@r:'t.IQFlClD
1l::l[2j~LJLJL.:::Jl.!:Jt:...J
. , . . · · CCB#66770 DEQ#FSC-560
~ . PACIFIC
: - _ .. Environmental
~ Group Inc. P.O. Box 22306 Eugene, OR 97402 PH. (541) 767-3770 FX. (541) 767.3775
September 24, 2003
Minds In Motion
3356 Kings Edwards Court
Eugene, Oregon 97401
Attn: Becky Stenzel
Re: Pre-demolition asbestos abatement,.
4331/2,447,449 Harlow Road, Springfield Oregon
. . .
On July 30, 2003 an inspection and site survey for asbestos containing building
materials was conducted at the above-mentioned addresses. From the
homogeneous list of building materials established, Roofing, ceiling tile and
several types of flooring materials were sampled and analyzed by an
independent laboratory, Magnum Environmental Services. The results indicated
that asbestos was present in 5 of the 7 types of flooring materials sampled in the
amongst the addresses above.
These materials were properly abated from these three locations on September 2
and 5, 2003.
These structures, following this exercise, are considered ready for demolition
pursuant to the rules specified in DEQ Division 340 and LRAPA's Title 43
regarding asbestos.
All documentation from these activities and the credentials of those who
performed them are on file at the offices of Pacific Environmental Group Inc.
If you or any of your associates have any questions regarding the activities
described, please don't hesitate to call me at 541-461-9115 or 541-954-4369.
Thanks for your patronage.
-v-J2 \ ,(V\
Douglas J. Moore, Superintendent, Inspector.