HomeMy WebLinkAboutPermit Building 1998-2-12
"'
Page 1
COMMERCIAL/INDUSTRIAL PERMIT APPLICATION
CITY OF SPRINGFIELD Job Number: 971691
COMMUNITY SERVICES DIVISION
BUILDING SAFETY
225 North Fifth Street
Springfield, OR 97477
Office: 726-3759
Inspection Line: 726-3769
Location of Proposed Work: 468 HARLOW RD
Assessors Map #: 17032200
Tax Lot #: 02703
OWner: MCCABE INVESTMENTS
Address: 1200 GATEWAY LOOP
Phone #: 747-6486
City/State/Zip: SPRINGFIELD, OREGON 97477
Description Of Work: OIL CAN HENRY'S NEW Value: 0.00
Name Address Phone
Architect: RAY & GILMORE
Const.
Contractor Contractor # Expires Phone
General: JOSEPH hUGHES 0045645 06/27/98 624-7100
7035 SW Hampton Tigard OR 972230000
Mechanical: DEPENDABLE REFI 0105507 04/04/98 744-2446
PO BOX 70569 EUGENE OR 974010000
Electrical: L H MORRIS 0001838 06/08/98 747-0811
PO Box 466 Eugene OR 974400000
- -- PLUMBING
NO.
9
Fee
Charge
90.00
40.00
40.00
55.00
10.00
Single Fixture
Sanitary Sewer
Water Service
Storm Sewer
BACKFLOW DEVICE
105
108
205
ft.
ft.
ft.
TOTAL PERMIT
235.00
--- MECHANICAL ---
No.
Fee
Charge
4.50
12.00
2.00
2.00
10.00
VENT SYSTEM
SUSPENDED HEATERS
GAS PIPING
AIR PIPING
Permit Issuance
TOTAL PERMIT
30.50
HANDICAP ACCESS: Y
ZONING CODE: CC
- - OFFICE USE
QUAD AREA: 1CNW
LAND USE: 5300
Item
Square Feet
x
$/Square Feet
Value
f'iPAINOPIELD
Job Number: 971691
Page 2
Sq. Ftg Main
1302
213,093.00
TOTAL VALUE OF PROJECT
213,093.00
Plan Check Fee:
500.83 Rec #: 28132 Date: 12/01/97 Rec By: LORNE PLEGER
BUILDING
Surcharge/Admin
MECHANICAL
Surcharge/Admin
PAVING VALUE
PLUMBING
Surcharge/Admin
CITY SDC FEES
689.50
55.17
30.50
1.65
21,954.00 152.50
235.00
18.80
7,211.10
SUBTOTAL PERMITS
8,394.22
TOTAL PERMIT FEES EXCLUDING ELECTRICAL
8,394.22
REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are
made at the proper time. To request an inspection, call 726-3769
(recorder), state your City designated job number, job address, type of
inspection requested and when you will be ready for inspection. Requests
received before 7:00 a.m. will be made the same working day, requests made after
7:00 a.m will be made the following work day.
Special Inspections: In accordance with
a special inspector shall be employed by
construction of any following n*" work.
shall be furnished to Building Safety.
Section 306 of the State Specialty Code
the Owner/Contractor during
A copy of the special testing reports
In addition to the inspections specified, the Building Official may make or
require other inspections of any construction work to ensure compliance with
the Building, City or Development Code.
WATER LINE - Prior to filling trench.
SANITARY SEWER LINE - Prior to filling trench.
STORM SEWER LINE - Prior to filling trench.
UNDERGROUND ELECTRICAL - Prior to Cover.
FOOTING - After trenches are excavated.
FOUNDATION - After forms are erected but prior to concrete placement.
SLAB - To be made after all inslab building service equipment, conduit
piping, and other equipment items are in place but prior to concrete
ROUGH GRADING - After gravel is in place but prior to placing concrete
ROUGH PLUMBING - Prior to cover.
ROUGH MECHANICAL - Prior to cover.
ROUGH GAS - after line is installed and capped if not attached to an
appliance
ROUGH ELECTRICAL - Prior to cover.
ELECTRICAL SERVICE - Must be approved to obtain permanent power.
FRAMING - Prior to cover.
INSULATION - Floor; prior to decking wall/Ceiling; Prior to cover
Job Number: 971691
Page 3
INSUL-V.B./SUB: TO BE CALLED FOR AT SAME TIME AS SUB FRAMING INSPECT
DRYWALL - Prior to taping.
SHEAR WALL NAILING - Before covering sheathing with finish materials.
FINAL PAVING - After paving is complete.
FINAL PLUMBING - When all plumbing work is complete.
FINAL MECHANICAL - When all mechanical work is complete.
FINAL GAS - When all gas work is complete.
GAS SERVICE - After line is installed and line has been connected to a
minimum of one appliance. Pressure test done at this point.
FINAL ELECTRICAL - When all electrical work is complete.
FINAL/SUB
FINAL FIRE - When all Fire Department requirements have been met.
been met.
FINAL SITE PLAN - After all requirements have been met for Minimum
Development Standards or from the Development Agreement.
FINAL BUILDING - When all required inspections have been approved and
the building is complete.
- - - ADDITIONAL COMMENTS
DRC #97-02-048, PLANNER IS GARY KARP
SITE PLAN REVIEW JOURNAL #97-02-048, GARY KARP, PLANNER
Plans Reviewed By: LORNE PLEGER
Building Site Reviewed By: LISA HOPPER
Date: 02/09/98
By signature, I state and agree, that I have carefully examined the completed
application and do hereby certify that all information hereon is true and
correct, and I further certify that any and all work performed shall be done
in accordance with the Ordinances of the City of Springfield, and the Laws
of the State of Oregon pertaining to the work described herein, and that
NO OCCUPANCY will be made of any structure without permission of the
Community Services Division, Building Safety. I further certify that only
contractors and employees who are in compliance with ORS 701.055 will be
used on this project.
I further agree to ensure that all required inspections are requested at the
proper time, that project address is readable from the street, that the
permit card is located at the front of the property, and the approved set
of plans will remain on the site at all times during construction.
. ~ 1l1C(.MA
S1gnature
J.-/l-9i
Date
-- - VALIDATION
Receipt Number: 2:;gg~O
Date Paid: 2'-/< '98.
Amount Received: -52 '::;.;;~ Y. -:<2-
Received By: ~/:!"'_,:_
CITY OF
JOB NO. "t7/C;~i /
... ATTACHMENT A ...
SPRINGFIELD SYSTEMS DEVEL~ENT CHARGE
WORKSHEET
NAME OR COHF,IlNY.
~"'j' /
( ~)/ L(,;.,~,
l!~~! /'../ S-
/
LOC.:l.TION.
'''/,- .:::
.y'(/ t',
'1 I I'd
h:~...../ k~ i~) .^ -
DEVELOPMEiF TYPE r; / '; (:;:~~dlC7"'..r;.i. //1 ).J
/j /
,-
BUILDING SIZE;:: 9 ,;'.2 7,''; /?-.; LOT SIZF '
SC. Ft,
. /
1. STDR~! ;!~_i: !!\L~_GE /:!.:2/ ~fTe'I""~/7
. "
_ cJ.' ;''''/ 'L.I--.
er- ,
IMPERViGUS SO FI,
C ,} ,;", .
(".~ c.~ I
. .....j--'
X 50.226 PER SQ, FT. 5/"7/-
2. SAN rT~R"1 SF1AF~ -f' TT'(
NO, OF PEU' S /7
(Seo P.""rse <;' -i","
.... "c. .~, ~ I U.....)
x $46.86 PER PFU
'.. ./,7"
~ P"'C'-
_ L.' / _
3. TRANSPr,PTATTO~
NO OF UN ITS X TR I P R.oTE X COST PE,P TRI P
/) Cl"
'" , -J-'
X '2.0/ X $472,49
...,
..N?-
. -::: c 7 ~-
.) J / \J
X
X $472,49
$
x
X $472. 49
$
4. SANITARY SFWFR.~1',me
NO. OF FEU'S,,J,'}J X C2'7~ER FEU + $10 MWMC/ADM FEE $ .;?/1 i::f..
MWMC CREDIT IF APPLICABLE (SEE REVERSE) 6 ,At') 9..:i: )
(';'
TOTAl -MWMC soe $ /.1-:' -
SUBTOTAL (ADD ITEMS 1.2.3 & 4)
, 71'
$11 ,<:t: 7-
/
5. AOMTNTSTR.L\TIVF FFFS
., ..
,BASE CHARGE (SUBTOTAL ABOVE) X .05
'$
'-""7
;?..-
.-? L/'3
'J7.
k~JiYu'~ ,','
,/ I SD0CoO,?<l nator
Date.t0~
TOTAL soe
/0
$ 7.2//~'
"
'. .
, FIXTURE UNIT CALCULA TJON TABLE: Number of New F.' es XUni.r E~uivalent = Fixwre Units
(NOTE: For remodels, calculate. the NET additional fixtures) , . .'
, . NUMBER OF ,U~JIT FIXTURE
FIXTURE TYPE NEW FIXTURES EQUIVALENT UNITS
Bathtub. ........... ....................,...........................,....,. r.,
Drinking. Fountain.........,..,....,..,.....,.,........................
r=!oor Drain.... ........... .......................... ........................
Interceptors For Grease/Oil/Solids/Etc.................
lmerceprors For Sand/Auto Wash/Erc..................
Laundry Tub/Clotheswasher.......,..""...................,.
Ciotneswasher - 3 Or More,....'......,.........................
MObile Home Park Trap 11 Per Trailer:..................
Receptor For Refrigerator/Water Staricn/E:c........
Receptor For Commercial Sink. Dish'.'/asher/E:c..
Shower, Single Stall..............,..,...............................
3r;ower, Gang.......................,...."..................,.".,....
Sink: Bar. Commercial, Resiceraial Ki~chen........................
Uiir.ai. Stalli'NaJI......................,................"..............
'Nash Basin/Lavatory. Single......... ,......... ............,..
Toilet, Public Installation,......"............................,..
Toilet, Private............................... .......................
ivlisce!ianeous:
CREDIT CALCULATION TABLE: Based on assessed value.
:alculate credits separates,
r
1
Vear
Annexed
Rate per $ 1.000
Assessed Value
1979 or before
19BO
19B1
1982
1983
1984
1985
1986
$3.97
3.89
3.83,
3.70
3.55
3.39
3.20
2.91
,
2
2
I
2
L.j
:3
3
6
2.
6
3
2
1;~eac
/ .
"
..,
2.
2.
--'..
'7
,~
6
'I
.""
cl.
, ,
/-,
TOTAL FiXTURE UNITS
/9'
=
If improvements occurred after annexation date in table,
Vear
Annexed
- ,1
Rate per $1,000
Assessed Value I
$2.56
2.17
1.73
1.31
0.92
0.74
0.61 J
...0...45
<...6.31';
0.17
8"
. ;.....:..
= PO'-
=
1987
1988
1989
1990
1991
1992
1993
1994
~
1996
Credit for Parcel or Land Only If Applicable .ft.,C>, '7 X $ _ .1/
IRate X Assessed Value)
Improvement lif after annexation date) X $
IRate X Assessed Value)
. 8"<'"
CREDIT TOTAL = $80
RUNOFF COEFFICIENTS FOR STORM DRAINAGE
(For. Estimating Purposes Only)
: Residential...:..;............;...;... OA
Commerical...........,......,....... 0.9
Industrial.....;...;............:...:. 05
Governmental........:............. 0.5
.. ~ I"
.' IMPERVIOUS AREA = TOTAL LOT SIZE X R'UNOFF COEFFICIENT
." . ~
.,:
.". -'" ...~ ".