Loading...
HomeMy WebLinkAboutPermit Building 1998-1-30 ,. COMMERCIAL/INDUSTRIAL PERMIT APPLICATION CITY OF SPRINGFIELD Job Number: 971510 COMMUNITY SERVICES DIVISION BUILDING SAFETY Page 1 225 North Fifth Street Springfield. OR 97477 Office: 726-3759 Inspection Line: 726-3769 Location of Proposed Work: 525 HARLOW RD Assessors Map #: 17032712 Tax Lot #: 00400 Owner: NICKI GUSTIN Address: 159 EAST 15TH Phone #: 334-4625 City/State/Zip: EUGENE, OREGON 97401 Description Of Work: ADD 2ND STORY OFFICE ADDITION Value: 0.00 Name Architect: NEIL DAUGHERTY Address Phone Contractor Const. Contractor # Expires Phone General: RON COIL 0025413 30 West 29th Eugene OR 974050000 Plumbing: BARNES HIGH TEC 0083311 89722 Hill Rd Springfield OR 974780 Mechanical: BEYMERS HEATING 0004483 300 River Rd Eugene OR 974040000 Electrical: THORNTON ELECTR 0069093 06/19/98 334-4625 OS/22/98 726-9854 11/14/97 688-5004 11/06/93 953-0027 --- PLUMBING --- NO. 2 Fee Charge 20.00 55.00 Single Fixture Sto:r:m Sewer 164 ft. TOTAL PERMIT 75.00 - -- MECHANICAL --- No. Fee Charge 12.00 10.00 Furnace/burner & vent < 1000,000 BTUs Permit Issuance TOTAL PERMIT 25.00 HANDICAP ACCESS: Y ZONING CODE: NC - - OFFICE USE QUAD AREA: lCNW LAND USE: 5300 Item Sq. Ftg Main Square Feet 2030 x $/Square Feet 48.48 Value 98,414.00 TOTAL VALUE OF PROJECT 107,184.00 .. l;jl'~ SPRINGPIELD Job Number: 971510 Page 2 Plan Check Fee: 203.45 Rec #: 27723 Date: 10/15/97 Rec By: DON MOORE BUILDING Surcharge/Admin MECHANICAL Surcharge/Admin PLUMBING Surcharge/Admin SIDEWALK CURB CUT CITY SDC FEES 451. 00 36.08 25.00 1. 20 75.00 6.00 14.05 14.05 1,696.47 SUBTOTAL PERMITS 2,318.85 TOTAL PERMIT FEES EXCLUDING ELECTRICAL 2,318.85 REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726-3769 (recorder) I state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m will be made the following work day. Special Inspections: In accordance with a special inspector shall be employed by construction of any following "*11 work. shall be furnished to Building Safety. Section 306 .of the State Specialty Code the Owner/Contractor during A copy of the special testing reports In addition to the inspections specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. FOOTING - After trenches are excavated. FOUNDATION - After forms are erected but prior to concrete placement. SLAB - To be made after all inslab building service equipment, conduit piping, and other equipment items are in place but prior to concrete STORM SEWER LINE - Prior to filling trench. ROUGH PLUMBING - Prior to cover. ROUGH MECHANICAL - Prior to cover. ROUGH ELECTRICAL - Prior to cover. FRAMING - Prior to cover. INSULATION - Floor; prior to decking wall/Ceiling; Prior to cover DRYWALL - Prior to taping. FIREWALL - Located and constructed according to plans. SHEAR WALL NAILING - Before covering sheathing with finish materials. ROOF SHEATING/NAILING - Before covering sheathing with finish material CEILING GRID INSUL-V.B./SUB: TO BE CALLED FOR AT SAME TIME AS SUB FRAMING INSPECT MECH/SUB: FOLLOWING ROUGH MECHANICAL APPROVAL, PRIOR TO COVER EXTER LIGHT/SUB FINAL PLUMBING - When all plumbing work is complete. FINAL MECHANICAL - When all mechanical work is complete. FINAL ELECTRICAL - When all electrical work is complete. SPRINOPIELD Job Number: 971510 Page 3 FINAL FIRE - When all Fire Department requirements have been met. been met. FINAL SITE PLAN - After all requirements have been met for Minimum Development Standards or from the Development Agreement. FINAL/SUB CURB CUT - After forms are erected but prior to placement of concrete. SIDEWALK - After excavation is complete, forms and sub-base material in place. FINAL BUILDING - When all required inspections have been approved and the building is complete. -- - ADDITIONAL COMMENTS --- SITE REVIEW JOURNAL #95-09-171, LAUREN LEZELL, PLANNER Plans Reviewed By: LORNE PLEGER Building Site Reviewed By: LISA HOPPER Date: 12/12/97 By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be ' used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. /---- Date 30 -r-}Y -- - VALIDATION Date Paid: '<~c:;;? / -~~~~ 'd:-~// ~ ~~g>:9:> .. Receipt Number: / Amount Received: "; t Received By: . . JOB NO. '77/~)/.) An ACHMENT A . , . CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE WORKSHEET . .. NAME OR COt,!P,!!'NY: Al6J:/ ht./sA--/YJ LOCATION ./.)";J.f>- 4",~/"h/U!<.d. (J-ea-,~/cJ-r: Jk../ E~A-e) DEVEL.OPMENT TYPE: "J.. -~/II7fl:.t{;&- t 11;" . JW-'bb~ BUILDING SIZE #.uJ ,JJ.'.Ir't>11 .)13'1 LOT SIZF "0. Ft. , 1. STORM OR~Ti'Jt>r;F Mi /7.bJ Or"U..... !l1PER'iI OUS SO. FT. (f) x SO. 226 PER SO. ;- i. $ if 2. SA~ITTt>R'( "F~,FR-c:rTY /.s.,;.,-)<" / dn,,/c..:..; ;"u4H';' NO. OF PEU' S J X 546.86 PER PFU (See Reverse Side) $ /'/0 @.... 3. TRANSP0RTATTON 'NO OF UNITS X TRIP RATE X C.~T PER TRIP LG~{/M~) ~ ,J..J X /: yO X $472 49 // $ /q- 7:)- . x . X $472.49 $ x X $472.49 $ 4. SilNiTAR'! "c:.fED -M\'iI''1C NO. OF FEU'S x PER FEU + $10 MWMC/ADM FEE $ MWMC CREDIT IF APPLICABLE (SEE REVERSE) $ TOTAl-MWMC SOC $ ~. $ It" /.'7 , SUBTOTAL (ADD ITEMS 1.2.3 & 4) 5. ADMTNISTRATIVE FEFS BASE CHARGE (SUBTOTAL ABOVE) X .05 ~ $ '00 K_71-v~ /' tSba:.Coordinator Date:/t'/N/.Y7 I '17 . . .:-- TOTAL SDC $ /, c., "H::J _