HomeMy WebLinkAboutPermit Building 1998-1-30
,.
COMMERCIAL/INDUSTRIAL PERMIT APPLICATION
CITY OF SPRINGFIELD Job Number: 971510
COMMUNITY SERVICES DIVISION
BUILDING SAFETY
Page 1
225 North Fifth Street
Springfield. OR 97477
Office: 726-3759
Inspection Line: 726-3769
Location of Proposed Work: 525 HARLOW RD
Assessors Map #: 17032712
Tax Lot #: 00400
Owner: NICKI GUSTIN
Address: 159 EAST 15TH
Phone #: 334-4625
City/State/Zip: EUGENE, OREGON 97401
Description Of Work: ADD 2ND STORY OFFICE
ADDITION Value:
0.00
Name
Architect: NEIL DAUGHERTY
Address
Phone
Contractor
Const.
Contractor #
Expires
Phone
General: RON COIL 0025413
30 West 29th Eugene OR 974050000
Plumbing: BARNES HIGH TEC 0083311
89722 Hill Rd Springfield OR 974780
Mechanical: BEYMERS HEATING 0004483
300 River Rd Eugene OR 974040000
Electrical: THORNTON ELECTR 0069093
06/19/98
334-4625
OS/22/98
726-9854
11/14/97
688-5004
11/06/93
953-0027
--- PLUMBING ---
NO.
2
Fee
Charge
20.00
55.00
Single Fixture
Sto:r:m Sewer
164
ft.
TOTAL PERMIT
75.00
- -- MECHANICAL ---
No.
Fee
Charge
12.00
10.00
Furnace/burner & vent < 1000,000 BTUs
Permit Issuance
TOTAL PERMIT
25.00
HANDICAP ACCESS: Y
ZONING CODE: NC
- - OFFICE USE
QUAD AREA: lCNW
LAND USE: 5300
Item
Sq. Ftg Main
Square Feet
2030
x
$/Square Feet
48.48
Value
98,414.00
TOTAL VALUE OF PROJECT
107,184.00
..
l;jl'~
SPRINGPIELD
Job Number: 971510
Page 2
Plan Check Fee:
203.45 Rec #: 27723 Date: 10/15/97 Rec By: DON MOORE
BUILDING
Surcharge/Admin
MECHANICAL
Surcharge/Admin
PLUMBING
Surcharge/Admin
SIDEWALK
CURB CUT
CITY SDC FEES
451. 00
36.08
25.00
1. 20
75.00
6.00
14.05
14.05
1,696.47
SUBTOTAL PERMITS
2,318.85
TOTAL PERMIT FEES EXCLUDING ELECTRICAL
2,318.85
REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are
made at the proper time. To request an inspection, call 726-3769
(recorder) I state your City designated job number, job address, type of
inspection requested and when you will be ready for inspection. Requests
received before 7:00 a.m. will be made the same working day, requests made after
7:00 a.m will be made the following work day.
Special Inspections: In accordance with
a special inspector shall be employed by
construction of any following "*11 work.
shall be furnished to Building Safety.
Section 306 .of the State Specialty Code
the Owner/Contractor during
A copy of the special testing reports
In addition to the inspections specified, the Building Official may make or
require other inspections of any construction work to ensure compliance with
the Building, City or Development Code.
FOOTING - After trenches are excavated.
FOUNDATION - After forms are erected but prior to concrete placement.
SLAB - To be made after all inslab building service equipment, conduit
piping, and other equipment items are in place but prior to concrete
STORM SEWER LINE - Prior to filling trench.
ROUGH PLUMBING - Prior to cover.
ROUGH MECHANICAL - Prior to cover.
ROUGH ELECTRICAL - Prior to cover.
FRAMING - Prior to cover.
INSULATION - Floor; prior to decking wall/Ceiling; Prior to cover
DRYWALL - Prior to taping.
FIREWALL - Located and constructed according to plans.
SHEAR WALL NAILING - Before covering sheathing with finish materials.
ROOF SHEATING/NAILING - Before covering sheathing with finish material
CEILING GRID
INSUL-V.B./SUB: TO BE CALLED FOR AT SAME TIME AS SUB FRAMING INSPECT
MECH/SUB: FOLLOWING ROUGH MECHANICAL APPROVAL, PRIOR TO COVER
EXTER LIGHT/SUB
FINAL PLUMBING - When all plumbing work is complete.
FINAL MECHANICAL - When all mechanical work is complete.
FINAL ELECTRICAL - When all electrical work is complete.
SPRINOPIELD
Job Number: 971510
Page 3
FINAL FIRE - When all Fire Department requirements have been met.
been met.
FINAL SITE PLAN - After all requirements have been met for Minimum
Development Standards or from the Development Agreement.
FINAL/SUB
CURB CUT - After forms are erected but prior to placement of concrete.
SIDEWALK - After excavation is complete, forms and sub-base material
in place.
FINAL BUILDING - When all required inspections have been approved and
the building is complete.
-- - ADDITIONAL COMMENTS ---
SITE REVIEW JOURNAL #95-09-171, LAUREN LEZELL, PLANNER
Plans Reviewed By: LORNE PLEGER
Building Site Reviewed By: LISA HOPPER
Date: 12/12/97
By signature, I state and agree, that I have carefully examined the completed
application and do hereby certify that all information hereon is true and
correct, and I further certify that any and all work performed shall be done
in accordance with the Ordinances of the City of Springfield, and the Laws
of the State of Oregon pertaining to the work described herein, and that
NO OCCUPANCY will be made of any structure without permission of the
Community Services Division, Building Safety. I further certify that only
contractors and employees who are in compliance with ORS 701.055 will be '
used on this project.
I further agree to ensure that all required inspections are requested at the
proper time, that project address is readable from the street, that the
permit card is located at the front of the property, and the approved set
of plans will remain on the site at all times during construction.
/----
Date
30 -r-}Y
-- - VALIDATION
Date Paid:
'<~c:;;?
/ -~~~~
'd:-~// ~
~~g>:9:>
..
Receipt Number:
/ Amount Received:
"; t Received By:
. . JOB NO. '77/~)/.)
An ACHMENT A .
, .
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE
WORKSHEET
. ..
NAME OR COt,!P,!!'NY: Al6J:/ ht./sA--/YJ
LOCATION ./.)";J.f>- 4",~/"h/U!<.d. (J-ea-,~/cJ-r: Jk../ E~A-e)
DEVEL.OPMENT TYPE: "J.. -~/II7fl:.t{;&- t 11;" . JW-'bb~
BUILDING SIZE #.uJ ,JJ.'.Ir't>11 .)13'1 LOT SIZF "0. Ft.
,
1. STORM OR~Ti'Jt>r;F Mi /7.bJ Or"U.....
!l1PER'iI OUS SO. FT.
(f)
x SO. 226 PER SO. ;- i. $ if
2. SA~ITTt>R'( "F~,FR-c:rTY
/.s.,;.,-)<" / dn,,/c..:..; ;"u4H';'
NO. OF PEU' S J X 546.86 PER PFU
(See Reverse Side)
$ /'/0 @....
3. TRANSP0RTATTON
'NO OF UNITS X TRIP RATE X C.~T PER TRIP
LG~{/M~)
~ ,J..J X /: yO X $472 49
//
$ /q- 7:)-
.
x
. X $472.49
$
x
X $472.49
$
4. SilNiTAR'! "c:.fED -M\'iI''1C
NO. OF FEU'S
x
PER FEU + $10 MWMC/ADM FEE $
MWMC CREDIT IF APPLICABLE (SEE REVERSE)
$
TOTAl-MWMC SOC
$
~.
$ It" /.'7
,
SUBTOTAL (ADD ITEMS 1.2.3 & 4)
5. ADMTNISTRATIVE FEFS
BASE CHARGE (SUBTOTAL ABOVE) X .05
~
$ '00
K_71-v~
/' tSba:.Coordinator
Date:/t'/N/.Y7
I
'17
. . .:--
TOTAL SDC $ /, c., "H::J _