Loading...
HomeMy WebLinkAboutPermit Correspondence 1997-9-15 SPRINQFIELD 1:11'~ Page 1 COMMERCIAL/INDUSTRIAL PERMIT APPLICATION CITY OF SPRINGFIELD Job Number: 970811 COMMUNITY SERVICES DIVISION BUILDING SAFETY 225 North Fifth Street Springfield, OR 97477 Office: 726-3759 Inspection Line: 726-3769 Location of Proposed Work: 530 HARLOW RD Assessors Map #: 17032200 Tax Lot #: 02604 Owner: SFP-B LIMITED PTNR Address: 646 N MADRAS HWY Phone #: 541-416-5162 City/State/Zip: PRINEVILLE, OR 97754 Description Of Work: LES SCHWAB TIRE CNTR NEW Value: 0,00 Name Architect: ANDERSON-PEYTON Address Phone --- PLUMBING --- No, 13 Fee Charge 130,00 100,00 40,00 160,00 20,00 40.00 Single Fixture Sanitary Sewer 460 Water Service 80 Storm Sewer 885 2 BACKFLOW DEVICES 80' FIRE LINE ft, ft, ft, TOTAL PERMIT 490.00 - -- MECHANICAL --- No, Fee Charge 7,50 12,00 6,00 2,00 16,00 10,00 4 Furnace/burner & vent < 1000,000 BTUs Vent Fan/Single Duct APPLIANCE VENTS 4 GAS OUTLETS 32 AIR OUTLETS Permit Issuance TOTAL PERMIT 53.50 HANDICAP ACCESS: Y -- OFFICE USE QUAD AREA: 1CNW LAND USE: 5300 Item Sg, Ftg Main Square Feet 16851 x $/Square Feet = Val ue 650,000,00 TOTAL VALUE OF PROJECT 650,000,00 Plan Check Fee: 1,012,70 Rec #: 25916 SPRINQFIELD ~- Job Number: 970811 Page 2 Date: OS/22/97 Rec By: HEIDI KNIGHT BUILDING Surcharge/Admin MECHANICAL Surcharge/Admin PAVING VALUE PLUMBING Surcharge/Admin SIDEWALK CURBCUT 175,000.00 1,558,00 124,64 53,50 3,49 601. 75 490,00 39,20 27,70 27,70 SUBTOTAL PERMITS SYSTEMS DEVELOPMENT {'", ..." r. . _~'''..-..1 - 2,925,98 54,339,'i't/" .~ 57. 265 .~t;5" ~.!.J"~ . TOTAL PERMIT FEES EXCLUDING ELECTRICAL REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time, To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a,m, will be made the same working day, requests made after 7:00 a,m will be made the following work day, Special Inspections: In accordance with a special inspector shall be employed by construction of any following n*n work. shall be furnished to Building Safety, Section 306 of the State Specialty Code the Owner/Contractor during A copy of the special testing reports In addition to the .inspections specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code, ROUGH GRADING - After gravel is in place but prior to placing concrete UNDERGROUND PLUMBING - Prior to filling trench, BACKFLOW DEVICE - After device is installed but before backfilling trench. FOOTING - After trenches are excavated, FOUNDATION - After forms are erected but prior to concrete placement. SLAB - To be made after all inslab building service equipment, conduit piping, and other equipment items are in place but prior to concrete UNDERGROUND ELECTRICAL - Prior to Cover, ROUGH PLUMBING - Prior to cover, ROUGH MECHANICAL - Prior to cover, ROUGH GAS - after line is installed and capped if not attached to an appliance TEMPORARY POWER ROUGH ELECTRICAL - Prior to cover, ELECTRICAL SERVICE - Must be approved to obtain permanent power, MASONRY - Steel location, bond beams grouting or verticals in accordance with UBC 2415, FRAMING - Prior to cover, INSULATION - Floor; prior to decking wall/Ceiling; Prior to cover DRYWALL - Prior to taping, ROOF SHEATING/NAILING - Before covering sheathing with finish material BOLTS INSTALLED IN CONCRETE - To be done by State Certified Special Inspector, Provide inspection/test reports to City Building Inspector SPRINQFIELD ~- Job Number: 970811 Page 3 STRUCTURAL CONCRBTB in excess of 2500 psi. To be done during constr. by State Cert, Insp, Results to City Building Inspector STRUCTURAL MASONRY - To be done during constr by State Certified Special Inspector, Provide results to City Build~ng Inspector, CBILING GRID FINAL PLUMBING - When all plumbing work is complete, FINAL GAS - When all gas work is complete, GAS SBRVICB - After line is installed and line has been connected to a minimum of one appliance, Pressure test done at this point, FINAL MECHANICAL - When all mechanical work is complete, FINAL BLBCTRICAL - When all electrical work is complete, FINAL FIRB - When all Fire Department requirements have been met, been met, FINAL SITB PLAN - After all requirements have been met for Minimum Development Standards or from the Development Agreement, FINAL BUILDING - When all required inspections have been approved and the building is complete, --- ADDITIONAL COMMENTS --- PLANNER IS JIM DONOVAN, DRC #97-04-085 SITE REVIEW JOURNAL #97-04-085, JIM DONOVAN, PLANNER Plans Reviewed By: LORNE PLEGER Building Site Reviewed By: LISA HOPPER Date: 07/08/97 By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety, I further certify that only contractors and employees who are in compliance with ORS 701,055 will be used on this project, I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the street, that the permit card is located at the front of the property, and the approved set of p&?i:Jn ~te at all times during construc;~:s _ 9 7 Signature Date --- VALIDATION Receipt Number: "2773d2... Date Paid: q~9:::> Amount Received: <t;".?'2.tt:5":~~ , - Received By: // _~ r ~'~ -.Y SPRINGFIELD CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE (COMMERCIAL / INDUSTRIAL) Name or Company: SFP-B LIMITED PTNR Location: 530 HARLOW RD Developement Type: C Building Size: Job No,: 970811 Page 1 Lot Size: 132144 Sq Ft 1. STORM DRAINAGE Impervious Sq Ft 1,0 X 31350 X 0,216 Per Sq Ft 2. SANITARY SEWER Number Of PFUs (see Page 2) - CITY 1. 0 X 27 X 44,75 Per PFU = 3. TRANSPORTATION Number Of Units 1.0 X 1 X X Trip Rate 97,000 X X Cost Per Trip 451. 26 $43,772,22 Transportation Total 4. SANITARY SEWER - MWMC Number Of PFUs o X X Per PFU + MWMC Admin Fee 20,690 MWMC CREDIT If Applicable (see Page 2) TOTAL - MWMC SDC SUBTOTAL - (Add Items 1, 2, 3 & 4) 5. ADMINISTRATIVE FEES Base Charge (Subtotal Above) X 0,50 TOTAL SDC Reviewed By: TROY MCALLISTER Date: 06/17/97 $6,771,60 $1,208,25 $43,772,22 $0,00 $0,00 $0,00 $51,752.07 $2,587,60 $54,339.67 Job Number: 970811 FIXTURE UNIT CALCULATION TABLE Page 2 Fixture Type Bathtub Drinking Fountain Floor Drain Interceptors For Grease/Oil/Solids/Etc Inteceptors For Sand/Auto Wash/Etc Laundry Tub/C1otheswasher Clotheswasher - 3 Or More Receptor For Refrigerator/Water Station/Etc Receptor for Commercial Sink/Dishwasher/Etc Shower, Single Stall Shower, Gang Sink, Bar, Commercial, Residential Kitchen Urinal, Stall/Wall Wash Basin/Lavatory, Single Water Closet, Public Installation Water Closet, Private Miscellaneous Number of New Fixture Unit Equivalent Fixture Units o 2 o 1 o o o o o o o 1 o 4 2 1 o 2 1 2 3 6 2 6 1 3 2 o 2 o 3 o o o o o o o 2 o 4 12 4 o 2 2 1 6 4 TOTAL FIXTURE UNITS 27 CREDIT CALCULATION TABLE: Based on assessed value, If improvements occured after annexation date, credits are calculated separately, (calculations are by $1000) Year Annexed: 1979 Credit For Parcel Or Land Only If Applicable: Improvement (if after annexation date) : o X 3,47 0,00 o x 3.47 = 0,00 CREDIT TOTAL = $0.00 (If land value is multiplied by 1 then the parcel/land credit is not accurate,)