Loading...
HomeMy WebLinkAboutPermit Building 1996-10-22 SPRINQFIELD Page 1 COMMERCIAL/INDUSTRIAL PERMIT APPLICATION CITY OF SPRINGFIELD Job Number: 961355 COMMUNITY SERVICES DIVISION BUILDING SAFETY 225 North Fifth Street Springfield, OR 97477 Office: 726-3759 Inspection Line: 726-3769 Location of Proposed Work: 755 HARLOW RD Assessors Map #: 17032721 Tax Lot #: 10120 Owner: SPFLD SCHOOL DIST Address: 525 MILL STREET Phone #: 726-3244 City/State/zip: SPRINGFIELD, OREGON 97477 Description Of Work: DRIVEWAY IMPR/STORM SEWER ADDITION Value: 0.00 Name Address Phone Architect: KENNETH NAGAO Const. Contractor Contractor # Expires Phone General: DELTA SAND 0079069 11/04/95 995-6105 PLUMBING NO. Fee Charge 40.00 Storm Sewer 138 ft. TOTAL PERMIT 40.00 QUAD AREA: 1CNW -- OFFICE USE -- LAND USE: 6800 Item Square Feet x $/Square Feet Value TOTAL VALUE OF PROJECT 0.00 Surcharge/Admin MECHANICAL Surcharge/Admin PAVING VALUE PLUMBING Surcharge/Admin SIDEWALK CURB CUT 47,000.00 0.00 0.00 0.00 269.50 40.00 3.20 16.00 16.00 SUBTOTAL PERMITS SYSTEMS DEVELOPMENT 344.70 1,247.40 TOTAL PERMIT FEES EXCLUDING ELECTRICAL 1,592.10 SPRINGFIELD ~- Job Number: 961355 Page 2 REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m will be made the following work day. Special Inspections: In accordance with a special inspector shall be employed by construction of any following "*11 work. shall be furnished to Building Safety. Section 306 of the State Specialty Code the Owner/Contractor during A copy of the special testing reports In addition to the inspections specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. STORM SEWER LINE - Prior to filling trench. ROUGH GRADING - After gravel is in place but prior to placing concrete CURBCUT - After forms are erected but prior to placement of concrete. SIDEWALK - After excavation is complete, forms and sub-base material in place. FINAL PAVING - After paving is complete. ADDITIONAL COMMENTS TRAFFIC REVIEW APPROVED BY DEAN BISHOP 10-15-96, LAST REVISION Plans Reviewed By: LORNE PLEGER Building Site Reviewed By: LISA HOPPER Date: 10/18/96 By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. tw ;(. IWJ ;0 - ..2:<.- fb Date Signature --- VALIDATION Receipt Number: -:2 '3 s-s--s-- Date Paid: /0 -<"2"' <;7':: /5'"72... /0 ~.::::...-~--_. /,j! Amount Received: Received By: SPRINGFIELD . CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE (COMMERCIAL / INDUSTRIAL) Name or Company: SPFLD SCHOOL DIST Location: 755 HARLOW RD Developement Type: C Building Size: Job No.: 961355 Lot Size: 1. STORM DRAINAGE Impervious Sq Ft 1.0 X 5500 X 0.216 Per Sq Ft = 2. SANITARY SEWER Number Of PFUs (see Page 2) - CITY 1.0 X 0 X 44.75 Per PFU = 3. TRANSPORTATION Number Of Units Trip Rate x Cost Per Trip X Transportation Total 4. SANITARY SEWER - MWMC Number Of PFUs o x X Per PFU + MWMC Admin Fee 20.690 MWMC CREDIT If Applicable (see Page 2) TOTAL - MWMC SDC SUBTOTAL - (Add Items 1, 2, 3 & 4) 5. ADMINISTRATIVE FEES Base Charge (Subtotal Above) X 0.50 TOTAL SDC Reviewed By: TROY MCALLISTER Date: 10/14/96 Page 1 Sq Ft $1,188.00 $0.00 $0.00 = $0.00 $0.00 $0.00 $1,188.00 $59.40 $1,247.40 . Job Number: 961355 Page 2 FIXTURE UNIT CALCULATION TABLE Fixture Type Bathtub Drinking Fountain Floor Drain Interceptors For Grease/Oil/Solids/Etc Inteceptors For Sand/Auto Wash/Etc Laundry Tub/Clotheswasher Clotheswasher - 3 Or More Receptor For Refrigerator/Water Station/Etc Receptor for Commercial Sink/Dishwasher/Etc Shower, Single Stall Shower, Gang Sink, Bar, Commercial, Residential Kitchen Urinal, Stall/Wall Wash Basin/Lavatory, Single Water Closet, Public Installation Water Closet, Private Miscellaneous TOTAL FIXTURE UNITS Number of New Fixture Unit Equivalent Fixture Units o o o o o o o o o o o o o o o o o 2 1 2 3 6 2 6 1 3 2 o o o o o o o o o o o o o o o o o 2 2 1 6 4 o CREDIT CALCULATION TABLE: Based on assessed value. If improvements occured after annexation date, credits are calculated separately. (calculations are by $1000) Year Annexed: Credit For Parcel Or Land Only If Applicable: Improvement (if after annexation date) : o x 0.00 = 0.00 o x 0.00 0.00 CREDIT TOTAL = $0.00 (If land value is multiplied by 1 then the parcel/land credit is not accurate.)