Loading...
HomeMy WebLinkAboutPermit Building 1996-5-8 SPRINGFIELD ~- Page 1 RESIDENTIAL PERMIT APPLICATION CITY OF SPRINGFIELD COMMUNITY SERVICES DIVISION BUILDING SAFETY Job Number: 960546 225 North Fifth Street Springfield, OR 97477 Office: 726-3759 Inspection Line: 726-3769 Location of Proposed Work: 2277 GREENBRIAR ST Assessors Map #: 17032521 Lot: Block: Tax Lot #: 00900 Subdivision: owner: MARK HEWETT Phone #: 744-9234 Address: 2277 GREENBRIAR STREET City/State/Zip: SPRINGFIELD, OREGON 97477 Describe Work: FMLY/BED/BATH ADDIT ADDITION QUAD AREA: 5RNW # OF UNITS: 1 CONSTR, TYPE: VN OFFICE USE -- LAND USE: 1111 ZONING CODE: LOR HEAT SOURCE: FE # OF BLDGS: 1 OCCY GROUP: R3 SQ FOOTAGE: 712.5 To request an inspection, call the 24 hour recording at 726-3769. All inspections requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following work day. REQUIRED INSPECTIONS --- FOOTING - After trenches are excavated. FOUNDATION - After forms are erected but prior to concrete placement. UNDERFLOOR PLUMBING - Prior to insulation or decking. UNDERFLOOR MECHANICAL - Prior to insulation or decking. POST AND BEAM - Prior to floor insulation or decking. INSULATION - Floor; prior to decking Wall/Ceiling; Prior to cover ROUGH PLUMBING - Prior to cover. ROUGH MECHANICAL - Prior to cover. ROUGH ELECTRiCAL - Prior to cover. ELECTRiCAL SERViCE - Must be approved to obtain permanent power. FRAMING - Prior to cover. INSULATION - Floor; prior to decking Wall/Ceiling; Prior to cover DRYWALL - Prior to taping. FINAL PLUMBING - When all plumbing work is complete. FINAL MECHANICAL - When all mechanical work is complete, FINAL ELECTRICAL - When all electrical work is complete. FINAL BUILDING - When all required inspections have been approved and the building is complete. Lot Faces: E Solar Approved: Y Total Height: 15 Setbacks Setbk From NPL: 54 N S 8 W E House Item Main Total Value BUILDING PERMIT --- Square Feet x 713 $/Square Feet 64.66 Value 46,103.00 46,103,00 Building Permit Fee Surcharge/Admin 265.00 21. 20 TOTAL FEE (A) 286,20 SPRINGFIELD Job Number: 960546 Page 2 --- SYSTEMS DEVELOPMENT CHARGE (SDC) --- (B) 485.03 Systems Development Charge is due on all undeveloped properties within the City limits and the Citys Urban Growth Boundry which are being improved. PLUMBING PERMIT --- Item Fixtures 4 Fee 40.00 Plumbing Permit Surcharge/Admin 40.00 3.20 TOTAL CHARGE (C) 43.20 MECHANICAL PERMIT - - - Furnace Vent Fan Dryer Vent 2 6.00 6.00 .3.00 Mechanical Permit Issuance Surcharge/Admin 15,00 10.00 1. 20 TOTAL PERMIT (D) 26.20 (Excluding Electrical) unless otherwise noted TOTAL AMOUNT DUE (A, B, C, D, and E combined) 840.63 --- BUILDING VALUE, PLAN CHECK AND BUILDING PERMIT --- This permit is granted on the express condition that the said construction shall, in all respects, conform to the Ordinance adopted by the City of Springfield, including the Development Code, regulating the construction and use of buildings, and may be suspended or revoked at any time upon violation of any provisions of said ordinances. Plan Check Fee: 175.18 Date Paid: 04/18/96 Received By: LORNE PLEGER Plans Reviewed By: DON MOORE Date: 04/24/96 Building Site Reviewed By: LISA HOPPER Receipt Number: 21170 - - - ADDITIONAL COMMENTS PATH 1 NEED NEW DRAINAGE PLAN FOR SEPTIC SYSTEM By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. SPAINCFIELD ~. Job Number: 960546 Page 3 I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. Q dt~/n ") ~ 71ft!( ~ ,\1\ \:-\lliJ --- VALIDATION Receipt Number: r!l\\~ ~ h.9J .q l1 Amount Received: ~I. ^~rA.lS Received By: CJ\ IiLJlA $-8-91, Date Date Paid: . . Permit #: l\\ ciJ~O Address: 8<9-f) ~ ("1f~ f\hia r Issued bY:ct\\~ Date: D .sq to Statement: Information Notice to Property Owners About Construction Responsibilities Note: Oregon Law, ORS 701.055(4), requires residential construction permit appli- cants who are not registered with the Construction Contractors Board to sign the following statement before a building permit can be issued. This statement is required for residential building, electrical, mechanical, and plumbing permits, Licensed architect and engineer applicants, exempt from registration under ORS 701.010(7), need not submit this statement. This statement will be filed with the permit. Fill in the appropriate blanks and initial boxes I and 2, and either box 3A or 3B: ~ D ~ I. I own, reside in, or will reside in the completed structure. 2. I understand that I must register as a construction contractor if the structure is sold or offered for sale before or upon completion. 3A. My 'general contractor is (Name) Contractor regis. # I will instruct my general contractor that all subcontractors who work on the structure must be registered with the Construction Contractors Board. OR 3B. I will be my own general contractor. If I hire subcontractors, I will hire only subcontractors registered with the Construction Contractors Board, If I change my mind and hire a general contractor, I will contract with a contractor who is registered with the CCB and will immediately notify the office issuing this building permit of the name of the contractor. I hereby certify that the above information is correct and that I have read and do understand the Information Notice to Property Owners about Construction Responsibilities on the reverse side of this form, g~ ~ /1 J.f~ .5- 'tr - '7 t.. , (Signature OfP~~ Ln ~.. '\ \ (White copy to issuing /itn~~le, pink copy to applicant) (Date) . . ][i'1liroU'Ma~ilorro~iO~ilciS ~O PrOiJlsi'\ty Owrnsrs AlOiOU~ iCOi1S~mC~DiOrn ~es~{'j)rnsifoJm~ies Note: This Information Notice to Property Owners about Constmction Responsibilities was developed by the Construction Contractors Board in accordance with ORS 701,055(5). If you are acting as your own contractor to construct a new home or make a substantial improvement to an existing structure, you can prevent many problems by being aware of the following responsibilities and areas of concern. EMPlOVE::! lFIESPONSjiSILi11IES: If you hire persons not registered with the Construction Contractors Board to do labor in constructing or assisting in the construction or improvement of a residential structure, you will, in most instances, be ruled to be an employer and the people you hire will be employees. As the employer, you must comply with the following: Oregon's withholding tax law: As an employer, you must withhold income taxes from employee wages at the time employees are paid. You will be liable for the tax payments even if you don't actually withhold the tax from your employees, For more information, call the Oregon Dep\. of Revenue at 945-8091. Unemployment i~urance tax: As an employer, you are required to pay a tax for unemployment insurance purposes on the wages of all employees. For more information, call the Oregon Employment Division at the Department of Human Resources at 378-3524. Workers' compensation insurance: As an employer, you are subject to the Oregon Workers' Compensation Law, and must obtain workers' compensation insurance for your employees, If you fail to obtain workers' compensation insurance. you may be subject to penalties and will be liable for all claim costs if one of your employees is injured on the job, For more information, call the Workers' Compensation Division at the Department of Consumer and Business Services at 945-7888, V,S. !:nternal Revenue Service: As an employer, you must withhold federal income tax from employees' wages. You will be liable for the tax payment even if you didn't actually withhold the tax, For more information, call the Internal Revenue Service at 1-800-829-1040. OTHER RESPONSIBiliTIES AND AREAS OF CONCERN: Code compliance: As the permit holder for this project, you are responsible for resolving any failure to meet code requirements that may be brought to your attention through inspections, Liability and property damage insurance: Contact your insurance agent to see if you have adequate insurance coverage for accident.; and omissions such as falling tools, paint overspray, water damage from pipe punctures, fire, or work that [Dust be re-done. Time to supervise employees: Make sure you have sufficient time to supervise your employees. Expertise: Make sure you have the expertise to act as your own general contractor, to coordinate the work of rough-in and finish trades, and to notify building officials at the appropriate times so they can perform the required inspections. If you have additional questions, write or call the Construction Contractors Board (PO Box 14140, Salem, OR 97309-5052, 503/378-4621). The Board is located at 700 Summer St. NE Suite 300, in Salem. prop-own.pm4 1/94 ~ /( . . CITY OF SPRINGFIELD SYSTEMS DKVKLOPMENT CHARGE (RllSIDIlNTIALl Name or Company: MARK HEWETT Location: 2277 GREENBRIAR ST Developement Type: R Building Size: 1, STORM DRAINAGE Impervious Sq Ft 752 2, SANITARY SEWER Number Of PFUs (see Page 2) - CITY o 3, TRANSPORTATION Number Of Units X Trip Rate Transportation Total 4, SANJ:TARY SEWER - MWMC Number Of PFUs o MWMC CREDJ:T If Applicable (see Page 2) TOTAL - MWMC SDC SUBTOTAL - (Add Items 1. 2. 3 & 4) 5, ADMINISTRATIVE FEES Base Charge (Subtotal Above) X TOTAL SDC Reviewed By: TROY MCALLISTER Job No.: 960546 Lot Size: X 0.210 Per Sq Ft = X 43.43 Per PFU X Cost Per Trip X X Per PFU + MWMC'Admin Fee 18.750 0.50 Date: 04/22/96 Lo(2a;.c..nc.O ,,;;.O.c. Page 1 Sq Ft $157.92 $0.00 1:> ..} '30-1 ,,. - $0.00 $0.00 $0,00 $0.00 $157.92 $7.90 :f" -LC 1:>"""5 - $165,82 , .J/" . Job Number: 960546 . Page 2 FIXTURE UNIT CALCULATION TABLE Fixture Type Bathtub Drinking Fountain Floor Drain Interceptors For Grease/Oil/Solids/Etc Inteceptors For Sand/Auto Wash/Etc Laundry Tub/Clotheswasher Clotheswasher - 3 Or More Receptor For Refrigerator/water Station/Etc Receptor for Commercial Sink/Dishwasher/Etc Shower, Single Stall Shower, Gang Sink, Bar, Commercial, Residential Kitchen Urinal, Stall/Wall Wash Basin/Lavatory, Single Water Closet, Public Installation Water Closet, Private Miscellaneous Number of New Fixture Unit Equivalent Fixture Units o o o o o o o o o o o o o o o o o 2 1 2 3 6 2 6 1 3 2 o o o o o o o o o o o o o o o o o 2 2 1 6 4 TOTAL FIXTURE UNITS 0 CREDIT CALCULATION TABLE: Based on assessed value. If improvements occured after annexation date, credits are calculated separately. (calculations are by $1000) Year Annexed: Credit For Parcel Or Land Only If Applicable: Improvement (if after annexation date) : o X 0.00 0.00 o x 0.00 0.00 CREDIT TOTAL = $0,00 (If land value is multiplied by 1 then the parcel/land credit is not accurate.) . x Y OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE (R'ESIDENTIAL) Name or Company: MARK Location: 2277 Developement Type: R Job No.: 960546 Lot Size: Ft 1. STORM DRAINAGE Impervious Sq Ft x 0.210 Per Sq Ft , $157.92 2. SANITARY SEWER - CITY Number Of PFUs 7 (see Page 2) 43.43 Per PFU ~ 3. TRANSPORTATION Number Of Units Trip Rate x Transportation Total $0.00 4, SANITARY SBWBR - MWMC Number Of PFUs o x X Per PFU 18.750 $0.00 MWMC CREDIT If Applicable (see Page 2) $0.00 TOTAL - MWMC SDC $0,00 SUBTOTAL - (Add Items 1, 2, 3 & 4) $461. 93 5, ADMINISTRATIVE FEES Base Charge (Subtotal Above) $23// ;/ TOTAL SDC $485.03 Reviewed By: TROY MCALLISTER Date: 04/22/96 , Job Number: 960546 Page 2 FIXTURE UNIT CALCULATION TABLE Fixture Type Bathtub Drinking Fountain Floor Drain' Interceptors For Grease/Oil/Solids/Etc Inteceptors For Sand/Auto Wash/Etc Laundry Tub/Clotheswasher Clotheswasher - 3 Or More Receptor For Refrigerator/Water Station/Etc Receptor for Commercial Sink/Dishwasher/Etc Shower, Single Stall Shower, Gang Sink, Bar, Commercial, Residential Kitchen Urinal, Stall/Wall Wash Basin/Lavatory, Single Water Closet, Public Installation Water Closet, Private Miscellaneous TOTAL FIXTURE UNITS Number of New Fixture Unit Equivalent Fixture Units o o o o o o o o o 1 o o o 1 o 1 o 2 1 2 3 6 2 6 1 3 2 o o o o o o o o o 2 o o o 1 o 4 o 2 2 1 6 4 7 CREDIT CALCULATION TABLE: Based on assessed value. If improvements occured after annexation date, credits are calculated separately. (calculations are by $1000) Year Annexed: Credit For Parcel Or Land Only If Applicable: Improvement (if after annexation date) : o X 0.00 = 0.00 o X 0.00 0.00 CREDIT TOTAL = $0.00 (If land value is multiplied by 1 then the parcel/land credit is not accurate.)