Loading...
HomeMy WebLinkAboutPermit Electrical 1989-9-12 S~AL DEPUTY ELECTRICAL INS~TION Reauested Bv: Lebanon Serveo, Malllna Address: PO BOX 99 .Cl tv: Lebanon, InsDection Date: qu.z'/Rq Installation Address: Tv De of Eoutpment: Name of Owner: .Address: ,COMMENTS: Ine State: Date: 9112/89 'phone: 451-5090 OR ZiD Code:97355 f.Q..ji: 111q_lnl?_t;'1l'l Citv: Sprinqfield Sears Air Compressors Sears In HP Mnnpl HRln_R SIN R30-18603 Oregon Label # 1090 Approved (MJR) SIN R30-18329 Oregori Label # 1091 Approved (MJR) ~111 ; prt:.r:L :":":"3~t-c:: m; n ; ml1m nr,::)4)......... C'::iI4=..".....u co.... '::iI....A'::iI"':.~... Corrections shall be made within 15 days of receipt of this letter. The billing for this safety inspection will follow this report promptly. Payment will be expected within thirty (30) days from receipt of billing. If you had corrections noted in this report, an additional inspection will be required to verify the corrections have been completed. The final acceptance letter will not be sent until all corrections have been met. The visual safety inspection conducted does not certify the functional capability or longevity of the equipment. The working safety is the responsibility of the manufacturer and owners. Should there be additional questions and/or concerns, please feel free to contact this office at 373-1353. Sincerely, mJ,J7)- ILM Michael Rudd ' Special Deputy Electrical Inspector State of Oregon S~AL DEPUTY ELECTRICAL IN~TION Reauested Bv: Selco Products, Mal1lna Address: PO BOX 406 Cl tv: Baxley, Insne~tlon Date: Installation Address: Tvne of Eaulnment: Name of Owner: Address: WMMENTS: rnc Jekyll'Road .s1ate: GA q/l?/Rq Sears 3000 Ga,tewav Card Board Baler Street Date: 9112/89 phone: 912-367-4661 Zl n Code: 31513 PO #: CltV:Sprinqfield Sears Verticle Baler - SeIco Product". Inc_ Model V5-HD-LH SIN 07893808 Oreqon Label #1087 Approved (MJR) Mara~non - ~~H~ Moae~ ~~~HU SIN 27442-W Oreqon Label #1092. Approved (MJR) Both units of equipment meet minimum Oregon safety standards. Corrections shall be made within 15 days of receipt of this letter. The billing for this safety inspection will follow this report promptly. Payment will be expected within thirty (30) days from receipt of billing. If you had corrections noted in th1s report. an additional inspection will be required to verify the corrections have been completed. The final acceptance letter will not be sent until all corrections have been met. The visual safety inspection conducted does not certify the functional capability or longevity of the equipment. The working safety is the responsibility of the manufacturer and owners. Should there be additional questions and/or concerns. please feel free to contact this office at 373-1353. SIncerely. ~). fL&/ Michael Rudd Special Deputy Electrical Inspector State of Oregon