Mdrch 16, 1993
&
city,ef,Springfield
225 N. 5th
Springfield, OR 97477
PoSI-IP brand fax transmittal memo 7671 I. of p'g'" -::Z~_~
ITO -r ,^ "..m Nt .j.'
I /)'IV\ Nl6r y i\or- :LLI::__,_,..
Icoc.'.L ~s.."':llh.J/o ,__,_,__
DlIpt. 1 . l I.J Phon. /I
cozy Hemes
l717 Centennial Loo.p
Springfield, OR 97477
F.. ,
'7...2.& -3[. H
I
Fell ,
"
Attention: Tern Marx
l./H)IJ 1C.t98 Fi L-e /J .. ~~ _ "
6,g13 -G'~
RE: " s..~3 & 68951G1acier. Soringfield - W.o.#6484-RDR
As yeu requested, a site, inspectien was perfermed to. determJ.ne the
suitabil i ty ef the lets fer placement o.f co.nventienal weo.d framGd
single family dwellings eri cencrete feundatio.ns. Based en site and
seil canditians, I make the fallawing recammendatians:
At 6893 Glacier, a minimum af 12" af ~ampacted crushed rack is to
be placed an the building site.
At 4e~~S Glacier, an additianal lift, af crushed rack is to. he
placed an the site to. bring the minimum depth o.f crushed rack ,to.
12". '
At bath sites, the attached "Pracedures" are to. be used as a
guideline fo.r placement af the crushed rack.
I hape yau find this repartadequate far yo.ur purpases at this time.
Please cantact me if yo.u have Thank yo.u fo.r this
appartunity to. be o.f service.
Enclo.sure: "procedures"
Very truly yo.urs,
Emile Martier, P.E.
ECM/rc
..
'1",I':, ,~.: - 1 t. - ';,. :3
l
.
TUE
.---=-
. _ 0 _
~
.
p _ &.:1:::
MORTIER
ENGINEERING, P.c.
STRUCTURAL
BUILDING DESIGN. FIRE PROTECTION
CODE CONSULTANT. PLAN CHECKINO
CONSTRUCTION INSPECTION
P,Q, BOX 139 . l74 WlLLAMmE STREET
EvGE"E, ORtOON 97HO
PHONE (6<})) llI"9000 . FM (W3) 48-4-6859
June 15, 1977
(Rev, 11/1/84, 10/15/91)
FOUNDA nON IFILL PROCE~
The following procedure can be used with the proper controls and materials:
1, Sit, rrC,nRrRrioq; The site should be properly drained with no free water present, The surface should be capablc
of supporting (he equipment used without rutting or causing the existing soil to turn into mud due to the
opcration of equipment. The site should be, scalped of all vegetation to at least 8" . 12" below original gTound
surfac, to extend at least 12", or the depth of the fill beyond the perimeter footing line. The subgrade should
be al a uniform elevation with a maximum l' tolerance.
2, fill Malerial & Placement' The gravel or crushed rock fill material should be well graded with a sufficient
amount of coarse and flOe material to fill all voids wben compacted. The material should be frce of silt,
overburden or olher material whiCh would react adversely to compaction or variations in moisture C()nlent. The
fill should be placed by end dumping and blading in a manner to prevent separation of course and fine materials,
Placement 3hould be. i.D mAXimum 6" "deep lifts with compaction 8.ccoruplbhc..J ~o tbe $urfUI.:C or eac.h layer
pre,enrs a weU keyed ~ppearance and WiU support a loaded dump truck without rutting, FiJI should extend at
ka,\I 12" beyond the perimeter footings Or to a distance equal to the depth of fill, whichever is grealer, The fill
n1aterial should be graded to a uniform surface without the presence of loose material, A hand operated
vibralOry plate compactor may be used in the footing areas for flOaI compaction, If lI?Y looseness in the surface
OCC\lrs, thcn a topping of wcll graded crushed rock should be used as a flOalleveling course and compacted with
a portable vibratory plate compactor. '
3. C,Q1ltrJll Uniform Building Code, Section 2903[aJ. last paragraph, states, "Fills to be used to support the
foundation of any buildIng or struclure shall be placed in accordance with accepted engineering practice, A soils
investigation report and a report of satisfactory placement of ml, both acceptable 10 the Building Official, shall
be submined", To comply with this requirement, the following procedure is recommended:
a, Engineer is to inspect and approve site prior to any excavation or grading being performed.
b, Engineer is to make any additional or special recommendations for modifiution of the above
procedures based on specific site conditions.
c, Engineer is to inspec1 site during the subgtade excavation and preparation.
d, Engineer is to Inspect site during or after completion of the fill placement.
e, Engineer Is to provide report of compliance with this procedure and verification of satisfactory
soil bearing for the proposed structures,
f. foundation inspection by rbe local code enforcemcnt authority Ls to be In accordance with U8C
Sec,30S[e]1.
Emile Mortier, P,E,