Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2002-5-23 (2) OS/24/02 14:52 F~X 5417467163 PSI SPRINGFIELD . I4J 002 '. ,.",..,e-Z Information ~.". .To Build On EPflineetfng. Consulting. TlIsting SPECIAL INSPECTION ~'INAL SUMMARY REPORT May 23, 2002 Report No.: 722-20054-23 \. Mr. Tim Sprouse. .... Cross Lands Construction 8955 S. Ridgeline Blvd., Suite 1500 Highlands Ranch, CO 80126 3f)"z.-o. ~ Re: Applebee's #1075 Gateway Mall Springlield, Oregon Dear Mr. Sprouse: This is to certiJythat in accordance with Chapter 17 of the Uniform Building Code and design requirements, we have performed Special Inspection at the above referenced project on the following items: 1. Reinforcing Sleel, Anchor Bolts 2. ReInforced Concrete 3. So.nctural Welding 4. Nailing 5. Shear Walls 6. S [ructural Masonry Bond Beams Inspectiuns and tests were performed and reported according to the requirements of Chapter 17 and as directed by our client. To the best1lf our knowledge, the work inspected was performed in accordance with the approved plans, specifications, revisions, applicable workmanship provisions of State Building Cnde and Standards and Uniform Building Code. Note: Our firm also perfonned in-place nuclear density tests on crushed aggregate backfill. For specific details regarding our inspection and testing services, please reference our previously submitted reports. Respectfully submitted, Il ()llr])fNl Raym~ v. ~ii~e~ Department Manager c: City or Springfield Prolcssional Stlrvtce Industries. Inc.' \04QA Shelley St- Springlield. OR 97417' Phone 541/746-9049' Fax 541n46-7163