HomeMy WebLinkAboutPermit Building 1993-5-21
I
"I'
,.
.
RESIDENTIAL
PERMIT APPLICATION
:;'j
..'
;.\
"I
!
.':'"!
Inspections: 726.3769
Office: 726.3759
;',1
LOCATION OF PROPOSED WORK'
18 02 05 1 2
ASSESSORS MAP:
121 A
LOT:
SPRINGFIELD
4493 Glacier street
JOB N~MBER,
'C~t3ctn3_
, .
225 Fifth Streot
Spl'ingfield,OrcgOlL97.177
# SP 66
Springfield, OR 97478
TAX LOT:
Of=)9~
BLOCK'
OWNER:
ADDRESS: P.O.
Box 22636
Capstone Homes, Inc. of Oregon
CITY: Euqene
STATE: _OR
DESCRIBE WORK'
NEW XX
Single Family Residence
REMODEL
ADDITION
DEMOLISH
,OTHER
SUBDIVISION:
Lucerne Meadows
"
PHONE:
689-5567
ZIP: _97402__._
CONST.
CONTRACTOR'S NAME ADDRESS. CONTRACTOR H
.:. \
GENERAi,Capstone Homes, Inc.of OR P.O.B. 22636 Eug:,OR 97402
G 'Frid1und Plumbing 85628 Dilley Lane Eug."OR.'97405
PLUMBIN :
Garibay Heating 4207 W. 5th Ave. Eug.,OR 97402
MECHANICAl'
ELECTRICAl' Rose Corp. 89976 Day Lane Euqene, OR 97402
QUAD AREA: ~~ ___
H OF BLDGS:
~~:';:~,~:.~~~-
WArE:R HEATER, _ _____
- OFFICE USE -
LAND USE _LLU
H OF UNITS: \ f AJ-":'
CONSTR. TY!'E:: -~i----"-
HE^TSOUflC":.__~9.. u.
RANGE: ._" D
EXPIRES PHONE
10-18-93 689-5567
12-14-93 746-9433
12-21-93 344-2481
9-30-95 686-0905
62018
51835
70545
54431
FLOOD PLAIN: _______._.__
ZONING CODE: _LDP_J .
H OF UUHM',: -.$ltJ....- .-..--
"ECOND^llY III'^': 1=1
SC>U^HE FOO,"^GE: . ._ ~.
To request an Inspection, you must call 726.3769. This Is a 24 hour .-acoruing. All inspections IcquC31cd before 7:00 .1.I11. will be
made the same workinu day, Inspections requestod aHor 7:00 a.m. will be marle the following worl~ lJay.
,,",
%Temporary EleCI.'iC
'" .. ._\
-D Site Inspection - To be made
after excavation, but prior to
setting (arms.
o Underslab Plumbing/Eleclrical1
Mechanical - Pdor to cover.
~ Footing - After trenches are
~ excavated.
o Masonry - Steel lo~atlon, bond
beams, grouting.
","XFoundation - After (orms arc
~ erected but prior to concrete
placement.
D Underground Plumbing - Prior
to f111~ng trench.
~ Underflo~umbi_J~~ochal1ic~
~ - Prior ~;,;,u,oll,)n'or decking.
~ Post and Beam - Prior to floor
~insulation or decl~ing.
"f;:::J1 Floor Insulation - p'rior to
~ecklng.
r-:;;z( Sanitary Sewer - Prior to filling
~trcnch.
rVl Slorm Sewer - Prior to filling
.JL=S- trench.
tscr Water Line -=- Prior to filling
~enCh.
'rV1 Rough Plumbing', Prior to
~cover.
REQUIRED INSPECTIONS
~ Rough Mechanical - Prior 10
~uvcr.
1V1" Rou~h Electrical -
~cover.
Prior to
rc7i Electrical Service - Must be
~approved to obtain pennancnl
electrical power.
o Fireplace - Prior to fnclng
materials and (ramlng Insp.
~ Framing - PlioI' to cov.;r.
1':7f, Wt;lIl/Ceiling Insulation - PriOI to
~covcr.
~DrYWall - Prior tu taping.
"C71 Wood Stove - Arter In~;t:lll:lllon.
JA..1 ~ d.~ ;-yd,
o Insert - After fireplace npplUv\ll
and Installalion of unit.
1':?f Curbcut & Approach - After
~ forms are erected b'ut prior to
placement of concrele.
"f'.:?1' Sidewalk & Driveway - After
~excavation is complete, forms
and sub.base malerial in plnce.
o Fence - Wilen completed.
~trcct Trees - When all reqltircd
trees are planted: '.
. .
~ Fin.11 PlurnlJin{l - Wilen :111
~plllrnbino wurl~ is complete.
l'V1 Final Electrical - When all
~lcctrJcnl \Vork Ir; complete.
I"Vf Final Mechanical - When all
~ mechanical work is complete.
'tV1' Final Building - When all
~CQuired inspections helve been
approved and building is
completed.
[J Olher --
MOBILE HOME INSPECTIONS
l~ Dlocking and Set.Up - When all
blocking 15 c(HJlpIQlf~.
[~ Plumbing Connections - When
tWine Ilas been connected to
waler and scw~.r.,.
I I Electrical Connection - Wilen
blocking, set-up, and plumbing
Inspections have been approved
and the home is connected 10
lhe service panel.
, .
[J
Final - After all required
inspections ;ne npproved and
porches, sklrllng, d,=,cl~s, and
venting have been ino.tallccl.
L.'
-\11-'1,
Lot sQ. ltg, S'P:O
Lot coverage /6-f?()
Topography.' ";::2%
J)t ~.,/ .
Total height ()(.UL
Lot 1~lccs
BUILDING PERMIT
ITEM sa. FT,
Main
j,p 7t?
~/.3
Garage
Carport
Total Value
Building Parmi I Fcc
Stale SurchcH{Je
Total Fcc
Lot TYfHj
_~ Interior
Corner
PanllarHllc
_ Cul-(Ic.sac
__ _ Solb,ack~.
P.L. HSE GAR ACC
J:.J_/11==
/-' tP1
~--,p_--
, . ..,1' ,
.Y'!.- _..kL_
E
,
X $/SO. FT. VALUE
5~.~ -9385-1-
_~/O_ _513223
(A)
-9Q~a-1
_B3,CJO
__Z/~Y"
421,~
SYSTEMS DEVELOPMENT CHARGE (SDC)
~JLS.. 7'2-
PLUMBING PERMIT
ITEM
Fixtures
Residential Bllth(s)
Sanllary Sewet
Water
'Storm Sewer
Mobile Home
Plumbing Permit
Stale Surcharge
Total Charge
MECHANICAL PERMIT
Furnace
Exhaust Hood
Vent Fan
(B)
N' 3
-- -.-
FT.
FT.
FT,
(C)
N'
."S
Wood Stovcllnse(!j'FircPlacc uuU>
Dryer Vent
~A5 tltuE
MeChanical Permit
Issuance
Stale Surcharge
Total Permli
(D)
MISCELLANEOUS PERMITS
Mobile Home
State Issuance
State Surcharge
Sidewalk -6~ II
Cu,bcut _30- It
Demolition
State Surcharge
-PL!w_tf2?VL&.u__
TOlal Miscellaneous Permits (E)
TOTAL AMOUNT DUE (exclucllng elecllical)
(A, 0, C, D, ;1/)(1 E Combined)
FEE
-I8.2..,~O
__963
.2.02/3
_&zI!O
4,~o
_9'- M)
_152,0 D
<,~
_z.~
-5:7 5"0
_/.<2 DO
J."J~
_;=:; J:le
_'Z3.'ZO
-Ld $'0
l IS .,.tPIiOPOSED WORK IN THE
'.HISTORICAL DISTRICT, OR ON
THE HISTORICAL REGISTER?
II yes, this application must be signed
and approved by the Historical
Coordinator prior to permit issuance.
APPROVED: -
BUILDING VALUE, PLAN CHECK
AND BUILDING PERMIT
This permit is granted on the express condition that the said
construction shall, in all respects, conform to the OrdInance
adopted by the City 01 Sp,lnglleld, including the
Development Code, regulating the construction and use of
buildings, and may be suspended or revoked at any time
upon violation of any provisions of said ordinances.
~
Plan 'Check Fee:
Date Paid:
Receipt Number.
. ._~1/9-1
7-;'aI0
Systems Development Charge is due on all undeveloped
properties within the City limits ~hich a~e being Improved.
ADDITIONAL COMMENTS
( . \.)
~~ljLif- ~ . ~~5ri5
\cl-~ \: \ \ \nOC) -
d{\f\O){lmo ., \G\I~
Cui.J)SJrie.- ~('rJ fJ11 ~
I
I
I
~ -, .
.EN fi(t:::;v CAl-cliLA=11oA-.-'-'S
( ..
By signature, I state and agree, thai I have carefully examined
tllO completed application and do hereby certify that all
Information hereon Is true and correct, and I further certify
that any and all work performed shall be done In accordance.
with the Ordinances of the City of Springfield, and the Laws
of the State of Oregon pertaining to the work descrIbed
herein, and that NO OCCUPANCY will be made of any
structure without permission of the Building Safely DivisIon.
I further certify that only contractors and employees who
are In compliance with ORS 701.055 will be used on this
project.
I further agree to ensure that all required Inspections are
requested at the proper time, that each address Is readable
from th.~ street, that the permit card Is located at the front
of the property, and the approved set of plans '-:."!II remain
on the site at all times during construction.
Signaturep~~
Date ~/~?'
VALIDATION: 85CE)
__.:;Lo.t'-O RECEIPT NUMBER -z:s;., . rJ (I. U .:...(
cP. "7. '1~ DATE PAID "-" ~ ~ ---J . . .
~-I.~~_ :~'~~~:DR:~~X:~-~~ ~~'~:O-/
.
. JOB NO. Cf-:;'Oi'T3
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE
WORKSHEET
(COMMERCIAL & RESIDENTIAL)
~I NAME OR COMPANY: CA-PS-roAiE:.. I-bME3:S IAiC, OF (')ReG-ON
LOCATION: LJt../-q'1;:; (?/A'Gf eF<:. S-r. I q, 0 '}... c> S i 1- - i-~ '5 q 00
.
DEVELOPMENT TYPE: Lt?~ - f.ieN 5Fe..
BUILDING SIZE: :'.~' N. LOT SIZE
,.
r. STORM DRAINAGE . .~., '. ..
IMPERVIOUS SQ. FT. '21~ ; X $0.192 PER SQ. FT.
SQ. Ft.
G'-/IS7?)
........ ---
2. SANITARY SEWER-CITY
NO. OF PFU'S
(See Reverse)
1-~
X $39.78 PER PFU
c: q,'-I- <(L/:)
-----------
3. TRANSPORTATION
NO OF UNITS X TRIP RATE X COST PER TRIP
I X (,I) c) '5 X $401. 05
~
--- ---
x
X $401.05
X $401.05
~
-
x
~
SUBTOTAL (ADD ITEMS 1,2, & 3)
S
1IL':b &73-
4. ADMINISTRATIVE FEES
BASE CHARGE (SUBTOTAL ABOVE) X .05
(( <;S(,~)
--- --
TOTAL-CITY SDC $ i ~'2-? S,j
5. ~ANITARY SEWER-MWMC
.., ~ '2-'-
NO. OF PFU'S ~:.- x $13.62 PER PFU + $10 MWMC ADMIN. FEE $~'2'~ --
(Use PFU Total From Item 2 Above)
~~~
tj'Kip Burdick .
SDC Coordinator
l /-z&/q~
,
$ 311.l;.,
TOTAL-MWMC SDC~1-~
- ---
TOTAL SDC $ '2-11 51?;;..
MWMC CREDIT IF APPLICABLE (SEE REVERSE)
,.
FIXTURE UNIT CALCULA TIO~ ABLE: Number of New Fixtures X Unittuivalent = Fixture Units (NOTE:
For remodels, calculate only the NET additional fixtures)
FIXTURE TYPE
NUMBER OF
NEW FIXTURES
UNIT FIXTURE
EQUIVALENT UNITS
Bathtub..... ............................ ........... ............. .............
Drinking Fountain............... ......... ........................ .....
Floor Drain.................................................,..............
Interceptors For Grease/Oil/Solids/Etc.................
Interceptors For Sand/Auto Wash/Etc..................
Laundry Tub /Clotheswasher. .......,....................,.,...
Clotheswasher - 3 Or More..................;..................
Mobile Home Park Trap (1 Per Trailer).................. ','" :,.
Receptor For Refrigeralor fWater Station/Etc........ .
Receptor For Commercial Sink/Dishwasher /Etc..
Shower, Single Stall...................,.......,......,.,......,.....
Shower, Gang................................................,.......,'
Sink, Bar, CommerciaL......................,......,.............
Urinal, StallfWall...............................,.......................
Wash Basin/Lavatory, Single..................................
Water Closet, Public Installation.............................
Water Closet, Private...............................................
Miscellaneous:
'2-
2
1
2
3
6
2
6
6
1
3
2
l/Head
2
2
1
6
4
;;
'z,
?
TOTAL FIXTURE UNITS
t..J
'2..-
il
2-
'2,
12--
2!:>
Based on assessed value. If improvements occurred after annexation date in table,
CREDIT CALCULATION TABLE:
calculate credits separates.
I
Rate per $1,000
Assessed Value
r
I
Rate per $1,000
Assessed Value
Year
Annexed
Year
Annexed
1979 or before
1980
198t
1982
1983
1984
$2.83
2.76
2.71
2.60
2.46
2.33
1985
1986
1987
1988
1989
1990
1991
$2.16
1.90
1.60
0.25
0.87
0.50
0.16
Credit for Parcel or Land Only If Applicable Z ' ~ :, X $ II, 0 ~ { I}:..
(Rate X Assessed Value)
Improvement (ff after annexation date) X $ =
(Rate X Assessed Value)
CREDIT TOTAL = $ -~{ ~
RUNOFF COEFFICIENTS FOR STORM DRAINAGE
ResidentiaL...................... ..... .......... ............ ..... 0.4
CommerciaL.................................................... 0.9
Industrial..... .................... ............................ ...... 0.45
GovernmentaL...............,' ................................ 0.5
IMPERVIOUS AREA = TOTAL LOT SIZE X RUNOFF COEFFICIENT
,.