Loading...
HomeMy WebLinkAboutPermit Electrical 1994-7-22 " .' The following project as submiMed hes thot!<ll'r- ,~, ~~ 225 FIFTH STREET zoning. nod does not reqUire .I'oeifle land tI~r;eTRICAL PERMIT APPLICAT SPRINGFIELD, OREGON 97477 epproval, n \ \ \ ~, INSPECTION REQUEST: 726-3769 Zoning ~U City Job Number -~ \........~ )' ~ OFFICE: 726-3759 Jf2 Dote'7---:22.-Qc,r '3. COMPLETE FEE SCHEDULE BELOY . W 1. LOCATION OF INSTALLATtlClN:>rlzed Signature_ll,.., 3660 Gateway ST. A. LEGAL DESCRIPTION 17-03-15-00 tax lots 5101 & 5102 JOB DESCRIPTION Install Freeway Pylon Sign Permits are non-transferable and expire if work is not started within 180 days of issuance or if work is suspended for '180 days. 2. CONTRACTOR INSTALLATION ONLY Electrical Contractor Heath Signs Address 4644 SE 17th Ave. Ci ty Portland Phone 232-2620 Supervisor License Number 366-SI Expiration Date 10/1/96 Constr Contr. Number 64263 Expiration Date 2/9/95 ' 51':::? a: '::itf'dd= Owners Name Address City Phone OVNER INSTALLATION The installation is being made on property I own which is not intended for sale, lease or rent. Owners Signature: DATE: ~. <'2-"'2 C./ RECEIPT II: ./~&[? RECEIVED BY: ~___ -" New ~eslu~ntial-Sing1e or Multi-Family per dwelling Service Included: Items 1000 sq.ft. or less Each additional 500 sq. ft or portion thereof Each Manuf'd Home or Modular Dwelling Service or Feeder B. ,Services or Feeders Installation, Alterations or Relocation: 200 amps or less 201 amps to 400 amps 401 amps to 600 amps 601 amps to 1000 amps Over 1000 amps/volts Reconnect Only unit. Cost Sum $ 85.00 $ 15.00 $ 40.00 $ 50.00 $ 60.00 $100.00 $130.00 $300.00 $ 40.00 C. Temporary Services or Feeders Installation, Alteration or Relocation 200 amps or less 201 amps to 4QO amps Over 401 to 600 amps Over 600 amps or 1000 volts D. Branch Circuits $ 40.00 $ 55.00 $ 80.00 see "nil above New, Alteration or Extension Per Panel One Circuit Each Additional Circuit or with Service or Feeder Permit $ 35.00 $ 2.00 , E. Miscellaneous (Service/feeder not included) -Each installation Pump or irrigation $ 40.00 Sign/Outline Lighting ~1 $ 40.00 40.00 Limited Energy/Res $ 20.00 Limited Energy/Comm $'36.00 5. SUBTOTAL OF ABOVE 5% State Surcharge TOTAL 40.00 2.00 L'lQ Q2.88 \. \:). ?D