HomeMy WebLinkAboutPermit Building 2000-2-15
Ii
.
.
I Job# 99-01 ti04-Q1 I
Page 1 of TRANS#: 01-0000601
DATE:FEB 15 2000
AMT RECD:2 $ 4179.04
CHANGE:
CASHIER: 059
~
, 225 North Fifth Street
Springfield, OR 97477
CITY OF SPRINGFIELD, OREGON
COMMERCIAL PERMIT
City Of Springfield
Community Services Division
Building Safety
Job Number: 99-01604-01
Office: 726-3759
Inspection Line: 726-3769
Location Of Proposed Site: 3660 Gateway St Spr
Assessors Map#: 17031500
Lot: Block: Addition:
Owner:
Address:
Tax LoU: 01501
Subdivision:
Wood Products Credit Union
P.O. Box 297
Phone Number: 541-747-9401
City/StatelZip:
New
Sprinfield, OR 97477
Value: $145,000
Scope Of Work: Commercial
WOOD PRODUCTS CREDIT UNIO
ADDITION
Contractor Type
General Contr
Designer
Electrical Contr
Mechanical Contr
Quad Area:
# Of Units:
Constr. Type:
Water Heater:
Contractor Registration # Expiration Date Phone
Mckenzie Commercial Contractors Inc 45539 7/21/99 541-343-7143
865 W 2nd Ave, Eugene, OR 97402-4967
Conway Architecht
X,X,X
Alert Electric Inc 12772 5/22/99 541-747-2213
1970 N 28th St, Springfield, OR
97477-3401
Comfort Flow Heating Co 460 6/27/99 541-726-0100
1951 Don St Ste D, Springfield, OR
97477-1993
Office Use
Land Use: Banking Services
Zoning Code: CC
Bedrooms:
Range:
# Of Buildings:
Occupancy Group:
Heat Source:
Sq. Footage:
To request an inspection call the 24 hour recording at 726-3769. All inspections requested before 7:00
a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following
working day,
Footing
Foundation
Slab
Framing
Drywall
Structural Concrete
Bolts installed in
concrete
Required Inspections
I Building
-After trenches are excavated.
-After forms are erected but prior to concrete placement.
- To be made after all ins lab building service equipment, conduit piping, and other equipment ite
-Prior to cover.
- Prior to taping.
-In excess of 2500 psi. To be done during construction by a State Certified Inspector. Provide r
- To be done by a State Certified Special Inspector. Provide inspection test reports to City Buildin
I
Ceiling Grid
SUB -lnsulationNapor
Barrier
SUB - Final
Final Fire
Final Site Plan
Final Paving
Final Building
Underground Electrical
Rough Electrical
Final Electrical
Underfloor Plumbing
Rough Plumbing
Final Plumbing
Rough Mechanical
Final Mechanical
.
.
Job# 99-01604-01
Required Inspections
Building
Page 2 of 3
- To be called for at the same time as the SUB framing inspection.
-When all Fire Department requirements have been mel.
-After all requirements have been met for Minimum Development Standards or from the Develop
-After paving is complete.
-When all required inspections have been approved and the building is complete.
Electrical
- Prior to cover.
- Prior to cover.
-When all electrical work is complete.
I Plumbing
- Prior to insulation or decking.
- Prior to cover.
-When all plumbing work is complete.
Mechanical
- Prior to cover.
-When all mechanical work is complete.
Zoning: CC
FloodPlain? 0 Wetlands? 0
Journal numbers
1: 2000-01-0008
CommentsMDS Pending
Planner: Kay Bork
Urban Growth Boundary?D
Quantity Of Fill:
Supplier:
Drainage:
Floodway FEMA:
2:
Overlay District:
# of Street Trees:
Land Use: Banking Services
Pave Driveway? 0
3:
Additional Requirements:
Glenwood Area? 0 Required Attachments:
Source Locn:
Material:
Construction Types:
Occupancy Groups:
# Of Buildings:
# Of Bedrooms:
Handicap Access? 0
IArea (Sq. Feet)
I Main: Accessory:
Fee
Plan Check Fee
Total Transfered Records
Building Permit
Flood Plain FEMA:
# Of Stories:
Current Units:
Census Code: Does not apply
Height (feet):
Proposed Units:
Total:
Paid On Receipt#
Transfered Records
11/23/1999 36275
Value/Quantity
Fee,Amount
347
$347.26
$347.26
Building
02/15/2000 601
145,000
$534.25
.
.
Fee
Job# 99-01604-01 I
Paid On Receipt#
Building
02/15/2000 601
02115/2000 601
Page 3 of 3
Value/Quantity Fee Amount
.,
State Surcharge For Building Permit
Building Administrative Fee
Total Building
$37.40
$16.03
$587.68
Permanent: 200 Amps or Less
Permanent: 201 to 400 Amps
Branch Circuits With Feeder or Service
State Surcharge For Electrical Permit
Electric Administrative Fee
Total Electrical
Electrical
02/15/2000 601
02/15/2000 601
02/15/2000 601
02/15/2000 601
02/15/2000 601
1
1
24
$50.00
$60.00
$48.00
$11.06
$4.74
$173,80
Minimum Plumbing Permit Fee
Number of Fixtures
State Surcharge For Plumbing Permit
Plumbing Administrative Fee
Total Plumbing
Plumbing
02/15/2000 601
02/15/2000 601
02/15/2000 601
02/15/2000 601
5
$.00
$50.00
$3.50
$1.50
$55,00
Minimum Mechanical Permit
Mechanical Administrative Fee
Less than 100,000 BTU
Vent Fan to One Duct
Evaporative Cooler/Fan
Mechanical Issuance
State Surcharge For Mechanical Permit
Total Mechanical
Mechanical
02/15/2000 601
02115/2000 601
02115/2000 601
02/15/2000 601
02/15/2000 601
02/15/2000 601
02/15/2000 601
1
2
1
$.00
$.50
$6.00
$6.00
$4.50
$10.00
$1.16
$28,16
Drive In Bank - Transportation
Impervious Surface Area - Storm
Financial Institution - MWMC
Sanitary Sewer
MWMC Administrative Fee
SDC Administrative Fee
Total System Development
Grand Total
By signature, I state and agree, that I have carefully examined the completed application and do
hereby certify that all information hereon is true and correct, and I further certify that any and all work
performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of
the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made
of any structure without permission of the Community Services Division, Building Safety. I further
certify that only contractors and employess who are In acompliance with ORS 701.055 will be used on
this project.
I further agree to ensure that all required inspections are requested at the proper time, that each
address is rea.dable from the ,stret, that the permit card is Icoated at the front of the property, and the
apP/r1~:I~Xthe site at all times during construction. ~s~O
Signature oate /
/
System Development
02115/2000 601
02/15/2000 601
02/15/2000 601
02/15/2000 601
02/15/2000 601
02/15/2000 601
831
14
1
$2,258.43
$192,79
$38,62
$675.78
$10.00
$158.78
$3,334.40
$4,526.30
.
.
ATTACHMENT A
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE WORKSHEpT
JOURNAL OR JOB NUMBER ;JoDJ~o.~99.16.04~' ..
NAME OR COMPANY: Woo,d'l'roducts credit Union
LOCATION: !3'6(iOJ:illte:waY:Street '-
TAX LOT NUMBER !17~03y1'!i'O.0',OJ~or
DEVELOPMENT TYPE: !Iildg'Kddiiioi{forQrive-ilirough banking
. 1-",.
. .".-
'I:
BUILDING SIZE: , '232 LOT SIZE
Aoomon ::SIze, .t.,....lulud):; .....adUVy
I. STORM DRAINAGE Additional paving - scaled from planS--
,. :,"'j..
IMPERVIOUS SQ. FT. ;
. ----s3'il x
$0.232 PER SQ. FT.
$192.79 I
2. SANITARY 1;J:.wJ:.K-CITY
NUMBER OF PFU's jq-iT.~--. ,:.j x
(SEE REVERSE SIDE)
$48.27 PER PFU
-$(),OO+
'" 7-5'. 1'$
.3. TRANSPORTATION #912 - Drive-up Bank -- Capped at 20 PM Peak Hour Trips per Council Res. No. 95-47
. .
NUM?pR OF TRIPS x TRIP RATE x COST.PER PM PEAK HOUR TRIP
-- 0.23"2
x
X
.20C
x
X
$486.73 PER TRIP
$486.73 PER TRIP
TOTAL TRANSPORTATION SDC
$2,258.431
$0.00
$2,258.43 I
4, SANITARY SEWER - MWMC
A. REIMBURSEMENT COST:
NUMBER OF FEU's
. "0.232
x
$ " '152.59: PER FEU
$35.40 I
B. IMPROVEMENT COST:
NUMBER OF FEU's
. 0.232 "
x
$' .
13.86 ;PER FEU
$3.22 I
MWMC CREDIT IF APPLICABLE (SEE REVERSE)
MWMC ADMINISTRATIVE FEE
NOTE: Full Credit was applied to
the Levi Straus use. No turther
MWMC credit is available.
1$
$10.00 I
$48.62 I
$2.499.84 l!
TOTAL MWMC SDC
SUBTOTAL (ADD ITEMS 1,2,3, & 4)
5, ADMINISTRATIVE FEES:
BASE CHARGE (SUBTOTAL ABOVE)
x
0.05
11iB.'Ia
-$1'24:99..1
~u~~
~~~
DAlE IV'
TOTAL SDC CHARGES 1-S2;624:83i
'3;J?~. 'Ie:'
3660Gateway.xls
.
.
PLUMBING FIXTURE UNIT (PFU) CALCULATION TABLE
NUMBER OF NEW FIXTURES x UNIT EQUIVALENT = PLUMBING FIXTURE UNITS
JNOTE, F<:'R REMODEI~~. CALCULATE ONLV THE NET ADDITIONAL FIXTURES)
FIXTURE TYPE
BATHTUB
DRINKING FOUNTAIN
FLOOR DRAIN
INTERCEPTORS FOR GREASE/OIUSOLIDS/ETC.
INTERCEPTORS FOR SAND/AUTO W ASH/ETC.
LAUNDRY TUB/CLOTHESW ASHERlMOP SINK
CLOTHESW ASHER - 3 OR MORE
MOBILE HOME PARK TRAP (I PER TRAILER)
RECEPTOR FOR REFRlGERA TORIW A TER ST A TION/ETC.
RECEPTOR FOR COMMERCIAL SINK! DISHW ASHER/ETC.
SHOWER, SINGLE STALL
'SHOWER, GANG (NUMBER OF HEADS)
SINK: BJ\R; COMMERCIAL, RESIDENTIAL KITCHEN
URiNAL:STAL~ALL
WASH BASINILA V A TORY, SINGLE OR DOUBLE
TOILET, PUBLIC INSTALLATION
TOILET, PRIVATE INSTALLATION
MISCELLANEOUS:
FIXTURES
NEW OLD
L
p~ . t
UNIT
EQUIVALENT
2
I
2
3
6
2
6
6
I
3
.2
I
2
2
I
6
4
TOTAL PLUMBING FIXTURE UNITS
'.
I ,
-- ,'::1-"" i
,,?,I'
"2,1- .. ..
1
CREDIT CALCULATION TABLE: BASED ON ASSESSED VALUE
IF IMPROVEMENTS OCCURRED AFTER ANNEXATION DATE IN TABLE,
CALCULATE CREDITS SEP ARA TEL Y
Year Annexed:
I YEAR
~NNEXED
1979 or before
1980
1981
1982
1983
1984
1985
1986
. .1987
~,\: ,... . ,"
'1988'" ,
RATE PER $1,000
ASSESSED VALUE
$4.47
$4.38
$4.32
$4,20
$4.03
$3.88
$ 3.68
$ 3.38
$3.03
$ 2.62
CREDIT FOR PARCEL OR LAND ONLY IF APPLICABLE
IMPROVEMENT (IF AFTER ANNEXATION DA TEl
..t'.", .... :..
YEAR
ANNEXED
1989
1990
1991
1992
1993
1994
.1995
1996
1997
1998
3660Gateway.xls
-=
RATE PER $1,000
ASSESSED VALUE
$ 2.18
$ 1.75
$ 1.35
$ Ll7
$ 1.03
$ 0.86
$ 0,71
$0.57
$0.39
$0.18
x I $
x I
CREDIT TOTAL 1$
PLUMBING
FIXTURE
UNITS
o
o
o
o
o
o
.0
o
o
o
o
o
o
o
02,
On
o
o
o
o
0/"7< I