HomeMy WebLinkAboutPermit Plumbing 1993-3-5
-..J
COMMERCIAL/INDUSTRIAL
PERMIT APPLICATION
"-
,
..--
.,A
225 Fifth Street, Springfield, Oregon 97477
~
JOB NUMBER
9~1YJ?1L
INSPECTION LINE: 726.3769
OFFICE: 726.3759
LOCATION OF PROPOSED WORK: 3-1-:2. '2_~Af-;f ~-r;
~SSESSORS MAP: 17.(/ <. '? ~ '2,....? TAX LOT:
/4120
OWNER: -1-HJ.2P CdtuC' PHONE: J3L~ 7~ - /,;,CJ,<",C:;
ADDRESS: -;:;2 S- U. ~~-I-~-l ?~
CITY:~/./'C STATE: CA ZIP:_9LU'3
DESCRIPTION OF WORK: ---./2iu~/~~: .n?a!tt/ ~~~f,f'
NEW REMODEL~ ADDITION DEMOLISH OTHER
VALUE: _
NAME
ADDRESS
---',--_.
PHONE
ARCHITECT:
CONTRACTOR'S NAME
ADDRESS
CONST.
CONTRACTOR'
EXPIRES
PHONE
GENERAL: -IJ)~~ L~N
PLUMBING:~{u~ML-'3'1~~~~-=ZU'i.
, ' 1/Jt1W~ ,dl<. 17bi?
MECHANICAl. 44 - ,', ,
'7t:z.... 10.2.1-
f';1.~~.J ~4f!..3.::7t/.i'
( ~~Lt:Z6.7-/~Z."'I:
ELECTRICA' '
I PLUMBING I MECHANICAL,'
I NO, FEE CHARGE In ~~~ r.IIARGE-
I !it Single Fixture ID ~ Furnace/burner & vent
<100.000 BTUs
I Relocated Bldg, I Furnace/burner & vent
Inew fix, addtll > 100,000 BTUs
I Water Service Floor furnace and vent
fl.
Sanitary Sewer Suspended wall or floor I
II. mounted unit heater
Storm Sewer I Appliance Vent I
ft. separate
I Statlonaryevap. I
Backflow Device cooler
I Vent Fan/Single I
duct
I I Vent System apart I
from AC or htg,
1 I Mechanical exhaust I
hood and duct
1 I 6/1"S" L,/p6 ~/Iti )5~1
1 I Permit Issuance $10.00 I
TOTAL PERMIT -59.~1 I TOTAL PERMIT 1
- OFFICE USE -
HANDICAP ACCESS'
FLOOD'PCA.IN'
ZONING'
LIGHTING POWER BUDGET:
WATER HEATER'
OUAD AREA'
LANO USF'
. OF BLDGS'
. OF UNIT~'
OCCY GROUP'
CONSTR. TYpo,
."
. OF STORIES'
HEAT SOURCF'
SO, FT,
$/SO, FT.
VALUE
SO, FTG OTHER
x
X
X
SO, FTG MAIN
SO. FTG ACCES~
TOTAL VALUE OF PROJEC"T
PLAN CHECK FEE
RC PI'
DATF
BY
, I BUILOING PERMIT
5% Slale
Surcharge
MECHANICAL
I'~'<(~t?
15% Slate
Surcharae
I PAVING
PLUMBING
5'o~
z :;"'<>
.
I DEMOLITION
1<6.-
/1'> ee
. }r
5% State
SurcharQe
FENCE
VALUE $
SIDEWALK
CURB CUT
;,
I
I
I
TOTAL PERMIT FEES I
EXCLUDING ELECTRICA'
1G;" 2..)'
1
1
I
FT,
FT,
SUBTOTAL
PERMITS
SYSTEMS
I DEVELOPMENT
.-.. ...
" REQUIRED INSPECTIONS
,i'
..
It Is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726.3769 (recorder), state your City deslgnaled job number. job address, type of Inspection requesled and when you will be ready
for Inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a,m, will be made
thE> following work day,
SITE INSPECTION: To be
made after excavation, but
prior ~o' se~up' 9f f~rr~~...
. ..' . . .
UNDERSLAB PLUMBING,
ELECTRICAL & ,
MECHANICAL: To be made
before any work Is covered,
'I ROUGH.~LUMBI~
~NoworklSlO
---m::-l..UVI,;,I;;\J"U'ntil these
Inspections have been made
and approved,
PAVING: After gravel is in
place but prior to placing
asphalt or concrete.
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel In place, but
prior to placing concrete.
FIREPLACE: Prior to placing
facing materials and before
framing Inspection.
SPECIAL INSPECTIONS: In accordance
Secllon 306 of the Slale Specialty Code
a special Inspector shall be employed
by the Owner I Contractor during
construction of the following work, A
copy of the special tesllng reports shall
be furnished to the Building Division.
ATTIC DRAFT STOPS &
CURTAIN WALLS
CONCRETE SLAB: To be
made after all inslab building
service equipment, co~dult,
piping, accessories and other
ancillary equipment items are
In place but before any
concrete is placed.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are .approved.
STRUCTURAL CONCRETE: In
excess of 2500 P,S,I. (306 a,1)
STRUCTURAL WELDS:
Performed on lhe job, (2722 f)
UNDERGROUND: Plumbing.
electrical, gas, sanitary sewer,
storm sewer, water and
d ral nage /I neg:. To. be made
prior to covering or filling
trenches.
INSULATION' & VAPOR
BARRIER: To be made aller all
Insulation and required vapor
barriers are In place but
before any lath or gypsum
board interior wall covering Is
applied,
HIGH STRENGTH BOLTING:
During all bolt installation and
tightening operations, (306
a,6)
SPRAYED ON
FIREPROOFING: U,B.c,
Standards ,43-8,
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installatlon of
floor Insul"tlon, decking or
floor sheathing.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork. (306 a,11 &
Chapter 29)
POST & BEAM: To be made
prior to Installation of floor
Insulation, decking or floor
sheathing.
LATH AND/OR GYPSUM
BOARD: To be made aller all
lathing and gypsum board,
interior and exterior, Is in
place but before any
plastering 15 applied or before
gypsum board Joints and
fasteners are taped and
finished,
GLU.LAM BEAMS: Inspecllon
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U,B.C,
STDS, 25-10.11),
FLOOR tNSULATION &
VAPOR BARRIERS: To be
made prior to Installation of
decking or floor sheathing,
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavatlng complete and form
work and sub-base material in
place.
-x
STRUCTURAL MASONRY: (306
a,7) -
&.>'\-'\ / /AY;::
MASONRY: Steel location,
bond beams grouting or
verticals In accordance with
UBC 2415.
ROOF SHEATHING AND
NAILING: Prior to Inslalllng
any roof covering.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
.In addition to the Inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
-------------------------------------------------------
X FINAL PLUMBING
"
,FINAL ELECTR.ICAL
SITE PLAN REVIEW BOARD: Musl be requested 2 days in advance
of the date you wish Inspection, All project conditions such as
landscaping, parking lot striping, etc. must be completed before
r.equestlng this inspection.
t......1 'II.:
FINAL BUilDING: Requested arter the final plumbing, electrical,
mechanIcal and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
. , Certificate of Occupancy has been issued by the Building Division
and posted on the premises:
FINAL MECHANIC~L",
..,.
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENTS:
PLANS REVIEWED BY
,,/~
,
DATE~~ - \-5' (
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that alllnformatlon
herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of lhe Stale of Oregon pertaining to the work described herein. and lhat NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in compliance with ORS 701,055 will be used on lhls project.
I further agree to ensure that all required inspections are requested at the proper time, lhat project address Is readable from the
street, that the permit card Is located at the front of the property, and the approved sel of plans will remain on the site at all
times durln'g ~tructlon. .,
Slgnalure 1/;.01) It Y..e-P.f~. Date "? -<) -7 7
. ~ ~
AMOUNT RECEIVED' 7f!b, 2..-S"
'77/1
RECEIPT .'
DATE PAID: 'i: - 5" -'7 :!-
RECEIVED BY: -4k~
VALIDATION:
~
.~
J1~
20198~
"-
BACKFlOW PREVENTION DEVICE TEST REPORT
o NEW
o REPLACEMENT
fiRM
NAME:
T )./GP
~~yj~~SS' 3'12-1 atJ~/
(?r'/2/N~:~O ~~ STREE8L-
CITY
ZIP
~,~~'CE LLJ.~ ~~V~~E ,C,tl nA6'~ MODEL t.f..J.P,
WATERSY$TIM ~t~~~R &'Il'l ,;1IQ!.?~,QJ I , , I
~6~~ON bA..lLJ$/Y y"'tC}..... ..D.;<?qg:,Ar-r:/VLjN W,..-rllle~s. S~
REDUCED PRESSURE DEVICE I' PRESSURE VACUUM
DOUBLE CHECK VALVE I CHECK" ! BREAKER
, CHECK" CHECK' 2 AIR INLET I CHECK
f1. lit OPENED AT PRESS DROP
INITlAl TIGHT TIGHT REUEFOPENEOAT
TEST L5'1.~"" ,
ILU-UPSIO UJeUI'Slll
LEAKED 0 lEAKED 0 RELIEF VALVE!
PRESS DROP PASSED 'lZI DID NOT LEAKED
LS.,>"" FAilED 0 OPEN 0 0
IN1TlAl TEST
PASSED so.
FAILED 0
I OATU:ll~- ~9JJ
REPAIRS
AND/OR
PARTS
o
1" PRESS DROP !I
TIGHT 0 UJ-UPSCl
I RELIEF OPEN
UJ-UPSll '
AFTER REPAIR
TEST
AFTER 'TIGHT
REPAIR
OPENED AT
PRESS DROP
DATE. LlJ/LlJ/LlJ
LJ...J.UPSIl
LLJ.UPSIO
'I
DETECTOR METER READING.
IN COfvPLETtNG AND SUBMITTING THIS TEST REPORT. THE TESTER CERTIFIES THAT THE
DEVICE HAS BEEN TESTED AND MAINTAINED IN AOCORDANCE WITH ALL APPLICABLE
RULES AND REGULATIONS OF THE WATER SYSTEM ONNER AND THE STATE OF OREGON.
-;:L
" ..9' /' TESTERS SIGNATURE
I~~
GAUGE #
/J/'T37
CEIO'#
REPORT RECEIVED
BY:
(REPRESENTATIVE OR FIRM)
WATER SYSTEI';.'lS COPY
.
COM M ERCIALII N DUSTRIAL
PERMIT APPLICATION
225 Fifth Street, Springfield, Oregon 97477
~
.'
JOB NUMBER 93CLJBI
INSPECTION LINE: 726,3769
OFFICE: 726.3759
LOCATION OF PROPOSED WORK'
"?42/1
~-l.JAu
-f I ,
~r:
ASSESSORS MAP' J7../J3 ? 2-
/ J+t? F> Cdiu<? .
ADDRESS: ~2 S- 1Y . ~~~ .
CITY: h.~6rY()k/./~
2'-?
TAX LOT'
/4t:;t?
OWNER'
PHONE: ...B./~
?~ - /-./l,<:'.<
:<...e...l
P~.
STAT~'
rA
ZIP:
9'1?..,ns
DESCRIPTION OF WORK: ~4/~//J~
NEW REMODEL ~ ADDITION
I
f .n?&!#,
~//'(7/a.u.!'
DEMOLISH
OTHER
VALUE:
NAME
ADDRESS
PHONE
ARCHITECT'
CONTRACTOR'S NAME
ADDRESS
CONST,
CONTRACTOR #
EXPIRES
PHONE
GENERAL: ),('lDe/i17rF L'>inv
PLUMBING: }3C~,J?:Ml) ;O/b~-t);,
MECHANICA"
~,
-
1~'1~ .f.UI, ~)JI,,0~ ~ /2S8'i'
.?JikP~~tI)(. ")7/J;S'
7.f?-/02-f
<f2.'0.3 ,t;4~ -7~r
(""CALi 7~7-/~z..-(-
ELECTRICA' '
I PLUMBING I MECHANICAL I
I NO. FEE CHARGE I ...n "~~ ""ARGE-I
1 'it Single Fixture It) ~ Furnace/burner & vent
< 100.000 BTUs
I , Relocated Bldg, Furnace/burner & vent
(new fix, addU) > 100.000 BTUs
I Water Service 1 Floor furnace and vent
ft.
I Sanitary Sewer 1 Suspended wall or floor
It, mounted unit heater
I Storm Sewer 1 Appliance Vent
It. separate
1 1 Stationaryevap.
Backflow Device cooler
1 1 Vent FanfSingle
duct
I 1 Vent System apart I
from AC or htg,
I 1 Mechanical exhaust 1
hood and duct
1 1 6/'tf' ~/p6 .$/~ /5~1
I I Permit Issuance $10,00 I
I TOTAL PERMIT -59.~1 TOTAL PERMIT .1
- OFFICE USE -
HANDICAP ACCESS:
FLOOD PLAIN'
QUAO AREA:
LAN D USE:
# OF BLDGC'
. OF UNIT~'
ZONING'
OCCY GROUP'
CONSTR, TYpo,
. OF STORIES:
HEAT SOURCE:
LIGHTING POWER BUOGET:
WATER HEATER'
SQ, FT,
$/SQ, FT,
VALUE
SQ, FTG MAIN
SQ, FTG ACCESS
X
X
SO, FTG OTHER
X
TOTAL VALUE OF PROJECT
PLAN CHECK FEF
RC PT'
DAT"
BY
I BUILDING PERMIT
15% State
Surcha~qe
I'MECHANICAL
IS{ lfIih"J<i
15% State
SurcharQe
1 PAVI NG
I~.-
/e::> ee
).J
I PLUMBING
15% State
Surcharge
I FENCE
VALUE $
I SIDEWALK
I CURBCUT
5'o,~
Z~<>
.
I DEMOLITION
1
I
I SUBTOTAL
PERMITS
I SYSTEMS
, OEVELOPMENT
I
1
1
1
J
FT,
FT.
~OTAL PERM'IT FEES I
EXCLUDING ELECTRICAl
7~, zS-
~ REQUIRED INSPECTIONS.
It is the responsibility of the permit holder to see that all inspections are made at the proper time, To request an inspection, call
726.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready
for inspection, Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made
the following work day,
SITE INSPECTION: To be
made after excavation, but
prior to setup of forms,
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work is covered.
'I ROUGH.~LUMBI~'-
'~
<...:::. _. '''I'r'.- ~~ No work is to
.:n:r ...U....I<;;U until these
inspections have been made
and approved.
ATTIC DRAFT STOPS &
CURTAIN WALLS
FOOTINGS & FOUNDATIONS:
To be made atter trenches are
excavated and forms are
erected, all steel in place, but
prior to placing concrete,
FIREPLACE: Prior to placing
facing materials and before
framing inspe~tion,
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are .approved.
CONCRETE SLAB: To be
made after all inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
in place but before any
concrete is placed,
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are in place but
before any lath or gypsum
board interior wall covering is
appiied, -
UNDERGROUND: Plumbing.
electrical, gas, sanitary sewer,
storm sewer, water arid
drainage lines, To be made
prior to covering or filling
trenches,
UNDERFLOOR: Piumbing.
electrical, mechanical. To be
made prior to installation of
floor insulation, decking or
floor sheathing,
FIRE & SEPARATION WALL:
Located and constructed
according to plans,
POST & BEAM: To be made
prior to installation of floor
Insulation, decking or floor
sheathing,
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
Interior and exterior, Is In
place but before any
plastering Is applied or before
gypsum board joints and
fasteners are taped and
finished.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made atter all
excavating complete and form
work and sub-base material in
place,
, MASONRY: Steel location.
bond beams grouting or
verticals in accordance with
UBC 2415,
ROOF SHEATHING AND
NAILING: Prior to installing
any roof covering.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
,
PAVING: After gravel is in
place but prior to placing
asphalt or concrete.
SPECIAL INSPECTIONS: In accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Ownerl Contractor during
construction bf the following work, A
copy of the ~peclal testing reports shall
be furnished to the Building Division.
STRUCTURAL CONCRETE: In
excess of 2500 P.S,1. (306 a,1)
STRUCTURAL WELDS:
Performed on the job, (2722 f)
HIGH STRENGTH BOLTING:
During all bolt installation and
tightening operations. (306
a,6)
;
SPRAYED ON,
FIREPROOFING: U,B,C,
Standards 43.8,
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork, (306 a,11 &
Chapter 29)
GLU.LAM BEAMS: Inspection
Certificate by an approved
agency, furnished to the Cify's
Building Division before
beams are placed, (2501 U.BC,
STDS, 25.10,11).
)(
V ......
STRUCTURAL MASONRY: (306
a,7)
6*'\ !..u);:;
-In addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work t'o ensure
compliance with the Building,
City or Development Code.
X
;- -
FINAL PLUMBING
-------------------------------------------------------
SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish inspection. All project conditions such as
landscaping, parking lot striping, etc, must be completed before
requesting this inspection,
FINAL ELECTRICAL
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved, No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Buildir]g Division
and posted on the premises. .
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENTf"
PLANS REViEWED BY
~f~
DATE 't - ,,- ~ "l
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all Information
herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division, I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that project address Is readable from the
street, that the permit card is located at the front of the property, and the approved set of plans will remain on-the site at all
times during ~tructlon.
Signature~'.P ~~. Date {-S--77
VALIDATION: AMOUNT RECEIVED: 7~,:z.-S- DATE PAID: ~ - 5" - '7 ~
RECEIPT N: '77/; RECEIVED BY: - 4~"""""'~