Loading...
HomeMy WebLinkAboutPermit Building 2002-2-8 .' " ~ SPRINQFlELD ~. 225 Fifth Street Springfield, OR 97477 . . I Job# 01-00145-01 I Page 1 of3 TRANS#:01-0007977 OATE:FEB 08 2002 AMT RECD:2 $ 22587.22 CHANGE: CASHIER: 061 CITY OF SPRINGFIELD, OREGON COMMERCIAL PERMIT City Of Springfield Community Services Division Building Safety . Job Number: 01-00145-01 Office: 726-3759 Inspection Line: 726-3769 Location Of Proposed Site: 3266 Gateway St Spr Assessors Map#: 17032220 Lot: Block: Addition: Owner: Address: Tax Lot #: 02002 Subdivision: Mark McDonald 1420 5th Ave STE 2200 Phone Number: 206-391-2345 City/State/Zip: Seattle, WA 98101 New Value: $350,000 Scope Of Work: Commercial 6000 sf retail building shell Contractor Registration # Expiration Date Phone B & B Equipment Construction & Sup' 78752 1/10/2002 503-252-1461 308 Se 113Th Ave, Portland, OR 'Ii" "ou \0 97216-3378 ".,_ reoJOfl ia'N leq~"9~"; Uti'liW Arc Electric Inc AITE.'\liVjl~pted bY t~~~Q02l set I~.~~: 541-741-0494 85783 Hwy 99 South, Eugene, OR 971'tS r\~n center.l\'l~~~U9\'l OAR 95Z\-u; ~" l"atd1ca \ .01\1_0010\" , ",Hoe rll e , Twin Rivers Plumbing '~OAR9~lIO' btalncdViPf/2003ep\'lOl"le 541-688-1444 PO Box 40397, Eugene, OR 9740410090. '(all may e~ter. ~Nate: \\\'lte~~\iliCa\ian ,[_,lhec __111\ I Y Office USA" "t;.I"rt\'leU'~8~O.332-'2~"" "U'" centerlS 1- ,-,. Land Use: # Of Buildings: 1 Zoning Code: Occupancy Group: (VN) Wood Frame Bedrooms: Heat Source: Range: Sq. Footage: 6000 Contractor Type General Contr Electrical Contr Plumbing Contr Quad Area: # Of Units: Constr. Type: Water Heater: To request an inspection call the 24 hour recording at 726-3769. All inspections requested before 7:00,,1=\.\( a.m, will be made the same working day, inspections requested\~.m. will be~~I!!1~'fOUQWlng ~ working day, 1HISPERMI1S\-IAU- lHISPERMITISNOT R. . _J_~"'''INOER _~c"R equlred Inspectla9l'r1uf"~-- SABANUU,4-- I Buildinll ~"MMENCEOORI 0 -After trenches are excavated, - :-t 180 OA'< PERIO . - To be made after all inslab building se~'f&e equipment, conduit piping, and other equipment iter - Before covering sheathing with finish materials. - Prior to installing any roof covering. - Prior to cover. -Prior to taping, -Located and constructed according to plans, - To be done during construction by State Certified Special Inspector. Provide inspection test rel - To be done by a State Certified Special Inspector. Provide inspection test reports to City Buildir Footing Slab Shear Wall Nailing Roofing Framing Drywall Firewall Structural Welds Bolts installed in concrete Roof Sheating/Nailing - Before covering sheathing with finish material. Construction Types:(VN) Wood Frame Occupancy Groups: # Of Buildings: 1 # Of Bedrooms: Handicap Access? D ,Area (Sq. Feet) I Main: 6000 Accessory: '" .. , .J Ceiling Grid 180 Day Extension SUB - InsulationNapor Barrier Final Fire Final Site Plan Final Building Underfloor Plumbing Water Line Sanitary Sewer Line Storm Sewer Line Backflow Device Final Plumbing Rough Grading Final Paving Fee Commercial Plan Check Commercial Plan Check Additional Plan Check Additional Plan Check Total Plan Check . . I Job# 01-00145-01 I Required Inspections Building Page 2 of3 - To be called for at the same time as the SUB framing inspection. -When all Fire Department requirements have been met. -After all requirements have been met for Minimum Development Standards or from the Develo~ -When all required inspections have been approved and the building is complete. I Plumbing -Prior to insulation or decking, -Prior to filling trench, - Prior to filling trench, - Prior to filling trench, -After device is installed but before backfilling trench. -When all plumbing work is complete. I Permits w/o Srchg I -After gravel is in place but prior to placing concete. -After paving is complete, # Of Stories: Current Units: Census Code: Does not apply Height (feet): 19 Proposed Units: Total:6000 Paid On Receipt# I Plan Check 02/21/2001 4494 12/31/2001 7654 12/31/2001 7654 02/08/2002 7977 Value/Quantity Fee Amount 259,000 220,500 -56 130 $513.99 $458.41 $-55,58 $130.17 $1,046.99 Building 02/08/2002 7977 02/08/2002 7977 02/08/2002 7977 Building Permit State Surcharge For Building Permit Building Administrative Fee Total Building $905.50 $63,39 $27,17 $996.06 310,000 Plumbing 02/08/2002 7977 02/08/2002 7977 02/08/2002 7977 02/08/2002 7977 02/08/2002 7977 02/08/2002 7977 02/08/2002 7977 02/08/2002 7977 Minimum Plumbing Permit Fee Number of Fixtures State Surcharge - Plumbing Water Service Footage Sanitary Sewer Footage Storm Sewer Footage Backflow Prevention Device Administrative Fee - Plumbing Total Plumbing $.00 $80.00 $17.50 $85.00 $25.00 $40.00 $20.00 $7.50 $275.00 8 380 7 76 2 , . . --- Fee Impervious Surface Area - Storm Sanitary Sewer MWMC Administrative Fee SDC Administrative Fee Retail - Transportation Retail- MWMC Sanitary Sewer SDC Reimbursement Transportation SDC Reimbursement Total System Development Paving Total Permits w/o Srchg Grand Total Plan Check Type Checked By Engineering-C/I/P Pam Ownby Planning-C/I/P Colin Stevens Planning-C/I/P Colin Stevens Structural-C/I/P Lome Pleger Fire Marshal-C/I/P AI Gerard Job# 01-00145.01 . Page 3 of3 Fee Amount $3,414,60 $452.20 $10,00 $997,52 $11,996,63 $531,84 $595,00 $2,950,20 $20,947.99 $238,00 $238.00 $23,504.04 Need signed Development Agreement Plan review - condstruct 6000sq ft retail bldg, Group M Type VN - 4retail suites 1500 sq ft ea, 1. Address #'s on bldg 2. Address #'s on each suite 3. Extinguisher for each suite By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety, I further certify that only contractors and employess who are in acompliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the stret, that the permit card is Icoated at the front of the property, and the lPPrOve!j set of plans will remain on the site at all times during construction, ~/~..:) J(ez-, e- <;} --- 32 - ~ - D"2- Vure . ?/ P/ Paid On Receipt# System Development 02/08/2002 7977 02108/2002 7977 02/08/2002 7977 02/08/2002 7977 02/08/2002 7977 02/08/2002 7977 02/08/2002 7977 02108/2002 7977 Value/Quantity 12,600 28 1 6 6 595 2,950 Permits w/o Srchn 02/08/2002 7977 40,000 Date Completed Comment 02/22/2001 02/08/2002 12/18/2001 04/10/2001 03/07/2001 Date ATTACHMENT A CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE WORKSHEET JOURNAL OR JOB NUMBER 01-00145-01 NAME OR COMPANY: MARK MCDONALD LOCATION: 3266 GA TEW A Y STREET MAP & TAX LOT NUMBER: 17-03-22-20 02002 DEVELOPMENT TYPE: RETAIL BUILDING . .- USE # I NEW DEVELOPED BUILDING AREA (S,F,): NEW DEVELOPED AREA (S.F,): TOTAL DEVELOPED BUILDING AREA (S,F,): 6000 6600 12600 ITE: ITE: LOT SIZE (S,F,): 814 . Parkin,g Area 15931 = I. STORM DRAINAGE IMPERVIOUS SQ, FT, 12600,00 x $ 0,271 PER SQ. FT, $3,414.601/ 2. SANITARY SEWER-CITY A. REIMBURSEMENT COST: NUMBER OF DFU's B, IMPROVEMENT COST: NUMBER OF DFU's (SEE REVERSE SIDE) 28 x $ 21.25 PER DFU $595,00 r/ x $ 16,15 PER DFU $452,20 1""""- TOTAL LOCAL WASTEWATER SDC:I _$1,~1 28 3. TRANSPORTATION BLDG AREA TGSF x TRIP RATE x COST PER ADT x NEW TRIP FACTOR A. REIMBURSEMENT COST: ........- 6 x 40.67 x $ 16,12 PER TRIP x 0.75 NTF $2,950,20 B. IMPROVEMENT COST: /' 6 x 40,67 x $ 65,55 PER TRIP x 0,75 NTF $11,996,63 TOTAL TRANSPORTATION SDC $14946.8+ I 4, SANITARY SEWER - MWMC A. REIMBURSEMENT COST: NUMBER OF FEU's 6 x $81.69 PER FEU $490,13 I B. IMPROVEMENT COST: NUMBER OF FEU's 6 MWMC CREDIT IF APPLICABLE (SEE REVERSE) MWMC ADMINISTRATIVE FEE x $6,95 PER FEU $41.70 I $0,00 I _$10 00 I $51UJ..1 TOTAL MWMC SDC SUBTOTAL (ADD ITEMS 1,2,3, & 4) $190'046 I 5. ADMINISTRATIVE FEES: BASE CHARGE (SUBTOTAL ABOVE) x 0,05 $997,52 I ~ jZ'~ ,9. (J~-ep SDC COORDINATOR 1/10/02 DATE TOTAL SDC CHARGES $20,947.981 DECEMBER 2000 DRAI_E FIXTURE UNIT (DFU) CALCULATION ILE NUMBER OF NEW FIXTURES x UNIT EQUIV ALENT ~ DRAINAGE FIXTURE UNITS (NOTE: FOR REMODELS, CALCULATE ONLY THE NET ADDITIONAL FIXTURES) /, .. FIXTURE TYPE BATHTUB DRINKING FOUNTAIN FLOOR DRAIN INTERCEPTORS FOR GREASE/OILlSOLIDS/ETC, INTERCEPTORS FOR SAND/AUTO W ASH/ETC. LAUNDRY TUB CLOTHES WASHER/MOP SINK CLOTHES WASHER - 3 OR MORE (EA) MOBILE HOME PARK TRAP (I PER TRAILER) RECEPTOR FOR REFRIGERATOR/WATER STATION/ETC. RECEPTOR FOR COMMERCIAL SINK! DISHWASHER/ETC. SHOWER, SINGLE STALL SHOWER, GANG (NUMBER OF HEADS) SINK: COMMERCIAL, RESIDENTIAL KITCHEN SINK: COMMERCIAL BAR SINK: WASH BASINIDOUBLE LAVATORY SINK: SINGLE LA V ATORY/RESIDENTIAL BAR URINAL, ST ALLlW ALL TOILET, PUBLIC INSTALLATION TOILET, PRIVATE INSTALLATION MISCELLANEOUS: FIXTURES NEW OLD UNIT EQUIVALENT 3 I 3 3 6 2 3 6 12 I 3 2 2 3 2 2 I 5 6 3 4 4 DRAINAGE FIXTURE UNITS o o o o o o o o o o o o o o o o 4 o 24 o NUMBER OF EDU'S' 0 o o TOTAL DRAINAGE FIXTURE UNITS~ 28 .EDU (Equivalent rAvelling Unit) is a discharge equivalent to a single family dwelling (20 DFU) set at 167 gallons per day " CREDIT CALCULA TION TABLE: BASED ON ASSESSED VALUE IF IMPROVEMENTS OCCURRED AFTER ANNEXATION DATE IN TABLE, CALCULATE CREDITS SEP ARA TEL Y YEAR ANNEXED 1979 or before 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 RATE PER $ I ,000 ASSESSED V AWE -- $4,74 $4,65 $4.59 $4.46 $4,30 $4,14 $3,93 $3.63 $3,26 $2.85 $2.40 YEAR ANNEXED 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 RATE PER $1,000 ASSESSED VALUE $ 1.96 $ 1.55 $ 1.36 $ 1.23 $ 1.05 $ 0,90 $ 0.75 $ 0,57 $ 0,35 $ 0.15 CREDIT FOR PARCEL OR LAND ONLY IF APPLICABLE IMPROVEMENT (IF AFTER ANNEXATION DATE) x x $0.00 $0,00 CREDIT TOTAL $0,00 DECEMBER 2000