HomeMy WebLinkAboutPermit Building 2000-10-10
~
.
I Job# 00-01517-01 I
.,
Page 1 of2
TRANS#:01-0003430
DATE:OCT 10 2000
AMT RECD:1 $ 50.00
CHANGE:$ 7.64
CASHIER: 061
SPRINQFIELD
~
CITY OF SPRINGFIELD, OREGON
COMMERCIAL PERMIT
City Of Springfield
Community Services Division
Building Safety
Job Number: 00-01517-01
225 North Fifth Street
Springfield, OR 97477
Office: 726-3759
,
Inspection Line: 726-3769
Location Of Proposed Site: 3255 Gateway St Spr
Assessors Map#: 17032220
Lot: Block: Addition:
Tax Lot#: 02200
Subdivision:
Owner: Gateway Village Apartments L.L.C.
Address: 3255 Gateway Village Apartment
Scope Of Work: Commercial
Phone Number: 541-747-6124
City/State/Zip: Springfield, OR 97477
New Value: $2,345
stair replacement
Contractor Type
General Contr
Contractor
L & L Ornamental
po box 12273, Salem, OR 97309
Registration # Expiration Date
Phone
503-364-8441
Quad Area:
# Of Units:
Constr, Type:
Water Heater:
Office Use
Land Use:
Zoning Code:
Bedrooms:
Range:
# Of Buildings:
Occupancy Group:
Heat Source:
~q.Footage:
To request an inspection call the 24 hour recording at 726-376~!(ft..iiirfs~ctions requesteqJ>~0~ef.7':QQjRK
a.m. will be made the same working day, inspections requestedr\!'~3rp'f:p.9J~rri'iJWilllb'eJfljWaethE1 f6l1owin@Jr
working day. AUTHORIZEOUNOERTHISPERMlllbl'l
. . . __ _~.,.. ^clIl\IOONEOFOR
Required Inspecti. . '-,."....v~....
\.IVlVIlYl[;:.
Buildin!l ^l\IY 1~n OAY PERIOO.
Framing
Final Building
- Prior to cover.
- When all required inspections have been approved and the building is complete.
............. .
Construction Types:
Occupancy Groups:
# Of Buildings:
# Of Bedrooms:
Handicap Access? 0
,Area (Sq. Feet)
I Main: Accessory:
'equires you to
ArlEN IION:oreg~n~:~~ Oregon Utility
# Of Stories: folloW rulesAgPgPJ~(feeti: rules are set forth
N t.,. ationG.m,i;lI. . Tv~- AR952-001-
Current Units: 0 IIC :p.rono"e~\1l:Jnit810
. ~AR952-UOI-lJ"rv. '.- fth rulesbY
Census Code: DoID,\ of apolYllay obtain copies 0 I e hone
u1) u. WU, (Note' thete ep
T I' c~\ling th?:n~:~gon Ut,ilitY Notification
ata . nll~)borfo,. e..; oM_<l.,')-~344),
".-:,....
':t
By signature, I state and agree, that I have carefully examined the completed application and do
hereby certify that all information hereon is true and correct, and I further certify that any and all work
performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of
the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made
of any structure without permission of the Community Services Division. Building Safety. I further
certify that only contractors and employess who are in acompliance with ORS 701.055 will be used
on this project.
I further agree to ensure that all required inspections are requested at the proper time. that each
address is readable from the stret, that the permit card is Icoated at the front of the property, and the
approv set of plans will remain on the site at all times during construction.
~/~//
/
..
.
Fee
Building Permit
State Surcharge For Building Permit
Building Administrative Fee
Total Building
Grand Total
'-
Job# 00-01517-01
Paid On Receipt#
BuildinR
10/10/2000 3430
10/10/2000 3430
10/10/2000 3430
.
Page 2 of 2
Value/Quantity
Fee Amount
2,345
$38.50
$2.70
$1.16
$42.36
$42.36
1"'/0/07-'
Dat6 I
I
, '; . ".- .... .'... -... .....- .
i COMMERCIAL/lNDUSTRIAL
I PERMI~c.~P.PLICA!ION,,: ,', . .;
I -"'r""" ",..:I. 'l:..\~ \~w" t'~'r.l" I~.". r- -. . .
! 225Flft~;S~r,~e,!,SP:~rigfl.eld"qregon 97477 ~ ~
i ' .,:.
: ~OCATl6~/g~:;~ROPOSED-';';ORK' ~:t S-S- GI4-IE w!l-y 17 7
f . ~it:!I~ISj\i:\.""i ',.'!i"., lL,/,; '" . ,
, ASSEss6RSiMAp:'~'o' I,' ""'.,., 1'70.s Z'Z2;::J
I .' . '.
! o';;~'~'~?;t}Gi~t.):f;/QU~';;:.v.ll{./tr;/~ API!>. L L C....
j iJf}YI':,d.~ p" 'l'l.-p ~"f-fi'G "::\1, . :.- !. ~
; ADDRES'S.c1r,^ 1i'S;:,'Colt4; 1"f.:wA......... > I
I I'~ ,~H~L>>.u~~h....-...!I~ 0.,1: I:"". \ i. I -
! CITY!.:>I'~I/il>il.lo,:.(D;,pl/i,6-t:). ,. STATE: 4-fJ-
; ".ftdJCI:JHl i::Hfi"\lh::t.\ P,.':. I). l ",!" ','
. 00 ~ _
- JOB NUMBER 0 /s 17 -0 I
INSPECTION' LINE: 726.3769
"OFFICE: 726.3759
:rt..
fU T. ~;2~
TAX LOT'
o -z 20 a
PHON~rS"CfI') 7L17.c,,1 ~ G(
ZIP: 47 l~2..?
! DESCFU;'TI6'NioF,WORK"Hr/L.E pt.-fife If fJo1t:,;vf/ DP ,~TJ4.(A wo/
; t-i.(i~~l;jl~~~q.Ifl,(~(xtS' it)' Lie4J:'-~';:'
! NEW',,: "'c\",REMODEL . ADDITION DEMOLISH OTHER
i .~.',.,.~r1'~':;;.., I ./'.....'.~""!~."..
I+f'l: ~;J,,;;J...9
VALUE: 2 3'1 S- <::.:- -
. 1,1 ~.~:)~J"~?.lAI!;t'i, ,tow !:r~H;I..'NAME ADDRESS:
..' -,.,..c. l_\~/.\f'.""", 'c- : .
ARCHrTEcT:,,;'~;rJ";":'!"\" 1 oj(~,\,'", '"......'
:'intJ ,,~\IH:i\!i'it!(\i ~tl.ld l.i~ ~J'jt\U~ CONST.
CONTRAQTOR'SNAME Q"ir.,,',,:,. ADDRESS CONTRACTOR N
i GENER~i'.:.:;<-:L 'T L C)ftj1..(I4J"11 IS Mr,4L-
, . .
I . ;'; ,VIO {,;:,"( Wi.-;
: PLUMBIN('::':.:' .:~. ..~. .. ,: . ..
,Cd:~l ;i H....~,:':,",
MECHANICAl .-
, ELECT~ICA;'..tlV;jCA:l;P J(\l;;':i'l;
'~;''''''''JI-l 1.~'jJ\ 11'. '''.' r ~'"
, " PLUMBING
,",,0.
FEE
CHARGE
Nn
'. '.,
\"'; I :..,. :~' P... t,' , .
"Slngle,Flxture 'lC' ,:.
,Relocated Bldg.:;'-
'l!neW fix: eddU!, .';1
:Water Service
"".. j'lt.
Sanitary Sewer
'. H:l!.'lI~~~"~#.I'j ,j\~:ll-."'" 'ft.
Storm Sewer
fl.
Backflow Device
,....'
." .1, .,,~'f w1l :'il"l'-!l' ,'1'
,.
:1 . r~:' ,'.
.'.
TOTAL PERMIT
Permit Issuance
$10.00
~
. ,/ ~.y.; ~
2EPu!Jd=~-N~ TOTAL VALUE OF ,PR~ '^ 3 c-/.s. 0 0
TOTAL PERMIT' .
. ;1"')""
- OFFICE USE -
LAND US~'
N OF UNITS'
CONSTR. TYPE"
HEAT SOURCE:
QUAD AREA'
If . . .1-' , .~, ' ,"'II
N OF BLDGF'
OCCY GROUP'."
"
...
N OF STORIES'
SQ, FT.
$/SQ. FT.
sa. FTG MAIN
x
x
'l."( ,...-.... ,-~.
SQ, FTG ACCESS
sa. FTG OTH ER
. .,~:.'.-:~~,:,'~~~r1.~~'~~_.~!......~
x
-S TJ:h Q...
't~..t""''(:'I,,~I''!>''''~l ~l'll; \..1\' ,"" '-'1""
PLAN'CHE'CK:F.E.E'" . '-'.' ',:'"
. ..",' " r,. ".., ',""" .,RCPTN
DATF
'_'." .J.
" ~ '.
I B~U:DING,P.ERMIT,IO', 1("."f' '3;G ~
I ~;\Stete ".' .' .." 7""
SurchSN.8 !~~~d.\':..t. :1" ~i: .,:~.t ,:... L-"~
~~f}(;,n'.. 'H''" "., < ."'.i.1 b
'-' :, ,.3 .' I -
. 7%State '.' '.
Surcharne ~-'-
I P~\!INGh \ c'":''' "." , ," .:,
PLUMBING
1;\. Stete
~urcharoe
FENCE
VALUE $,
SIDEWALK
CURB CUT
FT.
FT.
~'~:';'-:~?,.{~~'~:t ::~'~:":~"~ ":
',' .':)Y~.,~~c~ p .'...- . I:,:,.
. . "::~7,::; ~'-~((~;,'.:~~~.:I~~~'~~,i;.,'.,':t:.;: ':~', ,~, ",,"
. .~~~.-"~.84..l\":"'"f"'\~"'".'''''''~''' ,,\~. "(,:1"':; ,:....
. . ' ".~~~ Y?-!.: 'itf~j;~:~:' ~.T :~~
PHONE
EXPIRES PHONE
S'o 3 - JC,f1.-}?ll"f I
M~~~ANI~AL
~~~
r.~6a:n~
Furnacel burner & vent
< 100.000 BTUs
Furnace/burner & vent
>100.000 BTUs
Floor furnace and vent
Suspended wall or floor
mounted unit heater
Appliance Vent
separate
stationary evap.
cooler
Vent Fan/Single
duct
Vent system apart
from AC or htg.
Mecnanlcal exnaust
hood end duct
HANDICAP ACCESS'
FLOOD PLAIN:
ZONING'
LIGHTING POWER BUDGET:
WATER HEATER:
VALUE
.
BY
DEMOLITION
SU BTOTAL
PERM!TS
SYSTEMS
. DEVELOPMENT
TOTAL PERMIT FEES I, -<,
EXCLUDING ELECTRICA' P
'-/2 1-'
:.]';--..l':tt.
I
I
I
I
I
I
.
REQUIRED INSPECTIONS
.
,
.-
~.
It Is the responsibility of the permit holder to see that all Inspections are made at the proper time. To request an Inspection, call
726-3769 (recorder), state your City designated Job number, Job address, type 01 Inspection requested and when you will be ready
for Inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made
the following work day.
SITE INSPECTION: To be
made after excavation, but
prior to setup of forms.
UNDERSLAB PLUMBING,
, ELECTRICAL &
MECHANICAL: To be made
before any work Is covered.
ROUGH PLUMBING,
ELECTRICAL &
MECHANICAL: No work Is to
be covered until these
Inspections have been mado
and approved.
ATTIC DRAFT STOPS &
CURTAIN WALLS
FIREPLACE: Prior to placing
facing materials and before
framing Inspection.
FOOTINGS & FOUNDATIONS:
To be msde after trenches are
excavated and forms are
erected, all steel In place, but
prior to piecing concrete.
FRAMING: To be made sfter
the roof, all framing, fire
blocking and bracing are In
place and all pi pes, chimneys
and vents BrB complete and
the rough electrical, plumbing
and mechanical are approved.
CONCRETE SLAB: To be
msde sfter sll Inslsb building
service equipment, conduit,
pIping, accessories and other
snclllary equipment Items are
In place but before any
. concrete Is placed.
INSULATION & VAPOR
BARRIER: To be made after all
Insulation and required vapor
barriers are In place but
before any lath or gypsum
board Interior wall covering Is
applied.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer. water and
drainage lines. To be made
prior to covering or filling
trenches.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to Installation of
floor Insulation, decking or
floor sheathIng.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
Interior and exterior, Is In
place but before sny
plastering Is applied or before
gypsum board Joints and
fasteners are taped and )
finished.
POST & BEAM: To be made
prior to Installation of floor
Insulation, decking or floor
sheathing.
I
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to Installation of
decking or floor sheathing.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material In
place.
MASONRY: Steel location,
bond beams grouting or
verticals In accordance with
UBC 2415.
ROOF SHEATHING AND
NAILING: Prior to Installing
any root covering.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
PAVING: After gravel Is In
place but prior to placing
asphalt or concrete.
SPECIAL INSPECTIONS: In accordance
Section 306 of the State Specially Code
a special Inspector shall be employed
by the Ownerl Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
STRUCTURAL CONCRETE: In
excess of 2500 P.S,1. (306 a,1)
STRUCTURAL WELDS:
Performed on the Job. (2722 f)
HIGH STRENGTH BOLTING:
During all bolt Instellatlon and
tightening operations. (306'
, a.6)
SPRAYED ON
FIREPROOFING: U.B.C.
Standards 43-8.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork. (308'a.11 & ..
Chapter 29)
GLU.LAM BEAMS: Inspection
Certificate by an approved
agency, furnished to the City's'
Building Division before
beams are placed. (2501 U.B,C.
STDS. 25-10,11).
STRUCTURAL MASONRY: (306
a.7) .
Oln addition to the Inspec,
tlons specified, the Building
, .Offlclal may make or require
other Inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
FINAL PLUMBING
-------------------------------------------------------
SITE PLAN REVIEW BOARD: Must be requested 2 days In advance
of the date you wish Inspection. All project conditions such as'
landscaping. parking lot striping, etc. must be completed before
requesting this Inspection.
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department Inspections are made and .
approved. No occupancy of the premises can be made until a
Certificate ot Occupancy hes been Issued by the Building Division
and posted on the premises.
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENTS'
PLANS REVIEWED BY
DAT~
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all Information
herein Is true and correct, and I further certify that any and all work performed shall be done In accordance with the Ordinances
of the City ot Springfield, and the Laws ot the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are In compllsnce with ORS 701.055 will be used on this project.
I further agree to ensura that all required Inspections .are requested at the proper .tlme, that project eddress Is readable from the
street, that the parmlt card Ie located at the front of the property. and the approved set of plans will remain on th~lte at all
times during constru on. ~ 0;3 .
~;~r~ ( AA/~ f)Q.,,~/~ Date f/~;;!~~
IJ 2 3Q _/~ tOGll-"-t1-"
VALIDATION: AMOUNT RECEIVED: -, DATE PAID: jQ'l'o cr0 ~ ':':'= ~..L,
. ! './7 rrt ~ 0 co
RECEIPT #: ,)L/"J, U RECEIVED BY: rDU") ;0 _, ~ 1',,8
o. . o.+:-.
~?<J::J{j
?
.
..
....
....
't.
~
.
.
D..
'"
..
..
:\I
:>
:>
:>
"
o
.,
o
D...-
J
;.
UP =:>
.,
",
'\:::.,
, "
'..~,
...~.:
~~,
/'~,
'~...
"
/
1 1/2 . 1/_
ANQ.E ~b;( 0
CROSS ERSIIlE OF 1READS
UNO
SO.TS. ,"
. MAX 4"
- ''''''\.. r ';-'
.< \
../
~
.
.....
..~
~ ~
'"
~
-!;>
~i
.............;- II
---24--t
\
,
u
"
~I
.-
.-
"
,'j.'
,-
"
"
"
..
,~'
,"
..
"
..
..
~'
"
"
"
-'$
15. I 1/2~/f
l'
~
./
y
RECT,
,
-
1
. , I'!!J
, ,
, ,
-~j-
~~- .
.-~4-
"
"'"
II
"
!!
;af:=-
2ND
, '-13-'
.. .
--' ~ ... I~
....ry,
...
'"
"-
~
.~
~
11/2.1/
ANGlE , 1/2 '.
CROSS 8IW:ES l1lOIlS
. OF
l - '.....,_
, .-
=~\
- ygJ,-::-
'. .
---------------
r
FLR.
~ I
I ~
H
~!i
II ]/
~ I
o
<:>
~
c;::,
""
~
i I
. ~
~-
15
~~ I
': !f
~ I
~Ul L:
w ~I .
~'~_L
5' -' ...
>- oX zj
~ .:.'~'
-~ I }I ~
I i..l I;;;
,
"
Oct OS 00 02:47p
~
, ,
p.2
.
.
SheelL-ofL-
L&L ORNAMENTAL
Commercial and Residential Metal Fabrication.
CCB# 100498
Salim 50)-364.8441 Fa.t 503,364.8442 Portland 50).246.4201
Pronn.al Nn.
tOC-0927 Date
9127/00
Gateway Village Apartments
Eugene, Or.
Phon. # 541-747~124
Fax # 541-741-0854
Fabricate. paint black. and install 1 - .tandard stairs with 10" channel stringers. bolt-<:n precast concrde treads. and 2-
yenlcal picket downrail, betww,," apartm<nls # 228 alld # 229. $2045.00
Fab,ica.., paint black, and install 2 - 3" x 3" sq. tube column under 'lairs at apanment # 143.'~ J. / D $300.00
L &. L Omamento.l charges S 40.00 per hour if we do the demoli!ion and removal of existing stairs._C Initia!!:)
Demolition and removal of existing stairs by others. " /ni,ials)
Concrete flU at columns by others.
'This prop08al dOlla not meet plane and epeclfications, SOl L.&~ Ornamental Standard exclusions ~ist (Attached)
L&L Ornarnontal, herein.fter L&L Orn.mente~ does hereby propose to furnish material and/of labor on t~ abcve listed items only in
accordance with above apecificetions. for the sum of:
Two Thousand Thrae Hundred Fortv Five Dollars S 2345.00 which does not include taxes
and/or special local fees. if any.
Any changes from typicall&L fa,ricatlon an,d/et installatIon methOds must be noted in crder to be a part of this agreement. Typal
standard L&L ORNAMENTAL fabric;tion and installation practices supersedeS purchasers blue print and project specifcatlons unless
noted on this proposal. All mat....;ls are guaranteed to bG OlS spocified .and subjed to :Ivailabil;ty. All 'M)n: to be completeclln accofdar:ce
'Nith industry ltandard practice and the applicable b:Jilding cod.s. All agreements contingent upon strikes, accidents. or deiays beyond our
control. L&L Ornamental is! non-union.
This prcposal is based on ---.1-instaUation trips. If purchaser ~equirea additional installation trips, trlp marges, mileagG, and por cern are
apolieable. Any changes from spedficatic:nl on drawings, Of others .. liste<: herein will be at the e~er:se of the ~urchaser. No credits, baci<
charges, or deductions will be allowed without authorization of the Management of L&L Om2lmental. L&L Ornementai vehicles and equipment
must be let! propelled to all job site work areB&. Extra costs resulting from lot conditions. building abslru~io"s. or other factors preventin~ easy
access, will be result In addl1lonal Charges. Prompt service is contingent upon the customers timely notification as tJ when the prqect is ready
to measure and ageln when the site Is prepared for installalion A trip charge will be implemented In the event purchaser ~uest& installation
Ytt\Gn not prapaired.
TERNS: Balance due 30 d.y' after invoice date with 'l)pro\'8<1 credit application. Ol~ers due upon receipt of inYOlce. InstaIla~lon and shol)
work In progr... wi. be billed at the end of each month. L&L Ornamental wiD not be obfigated Ie continue work on;, project if the account
become. delinquent. A ,ervlce charge of 11/2% p.r month (18% per .nnum) will b. charged on past due accounts. A fee will be charged on
any returned cheek within Federal. State, and Local Laws. Should' legal action become necessary, purchaser 'Nill ba r9&ponsible for legal fees
ArrJ teRn listed in propcaelllupersedoll te~51:stcd here. ,
The above prices al1l vatldfor I period of 30 days from the date mtnis proposal.
L&LAuthorizedSlgnatur. {)~...~l () Cl~U"'Y\.J oal.~-q-.(Y)
Acceptance of PrvPOSB~","ces. specifications. ton~lItion5, with illt~ched L&L E~cluaion5 List are satisfactory and hereby
acceptable L&L Ornamental Is authorized to proceed >Mth the wO!'K as outlined herein. Payment will be made as outlined herein.
Purcnaser authOrizes Charges or additIons by)Db superlntenoents (Initial Required)
Purctlllera Slgnatu... " Date Y
Oct. 09 00 02:4Bp
p.4
.
,.
,
'.
" ,
.
.
Shoot & of ,
L&L Ornamental
"Standard Exclusions
Gatewa,,' vmaO'e ADsrtments - Eu~ene. Or.
The following Standard Exclusions are items not supplied by L&L OR~AMENT AL unless otherwise specified on
proposal nUl!lber 10C~927 date; 9.27-00
1. Perfonnance bonds, pennits, fees. or applicable taxes,
2. Engineering. testing. or inspections.
3. Union personnel, special wages or benefits unless noted othet'\.\o'ise.
4. Code requirements not specificaily identified by owner, architect. or general contractor.
5. Temporary stairs. guardrails. handrails. or product protection.
6. Steel mill certifications, or exclusively domestic: materials.
7. Metals other than mild steel.
8. Sheet metal. reinfOrcing steel. wire mesh. or chain link products.
9. Welds ground smooth (standard L&L grinding is applicable).
10. Manholes, grates or castings.
II. Abrasive. extruded, or cast tread nosing.
12. Bolts, screws, fasteners, or dowels ofany kind other than those used ror L&L installed items.
13. Framing or Simpson type hangers or connc:ctors.
14. Responsibility for finish paint, galvanizing, plating. epoxy. powder. or other coatings applied by others.
15. Woodwork, carpet, concrete, rubber, resilient coverings. or coatings, of any kind, by others.
16. Concrete fin for landings, footings, or any other application.
17. I!UI! protection of architectural, structural. landscaping. glazing or mechanical surfaces.
18, Removal, relocation. or replacement of electrical. structural, or architectural items. including, but not limited to,
siding, insulation, fire coating. waterproofing, stair systems, deck coatings. or other existing mo.terinls.
19. Worl< site grade. elevations or grid locations.
20. Responsibility for reactions to deck finishes from welding and grinding residue due to
preservatives, sealants. stains or others.
21. Items are not bid as per specifications unless indicated.
Contractor I Purchaser
(p(\'\Q\~;\\~Cl M)
Name
SIGNATURE '1
Title
Date Y..