HomeMy WebLinkAboutPermit Building 1999-10-1
.'
CO~ERCIAL/INDUSTRIAL
.PERMIT APPLICATION
225 Fifth Street, Springfield, Oregon 97477
~
.
JOB NUMBER 9q~~
INSPECTION LINE: 726-3769
OFFICE: 726-3759
~ '
c'
LOCATION OF PROPOSED WORK: ,::<)! q c( ,. ('rJ~/.-yJl..,,-, 'nn(J
- ~ ( ,
ASSESSORS MAP' II I'J ~ ;:+;::)::LI\ '
.. I - - -
~ SJLp(1l
'/ M-' tl--t-- .-
OWNER: J,lvlil/ 0
ADDRESS' ;::}."2.,C')b
q- J 1-A~A_'"
~-:--\. /1
DESCRIPTION OF WORI<' Sfe t1 rrL-f:/
CITY:
71)~ j}-
NEW
REMODEL
ADDITION
DEMOLISH
NAME
ADDRESS
ARCHITECT'
('{I,
CONTRACTOR'S NAME I
GENERAl' (lr;lPAAIi n
,/' ADDRESS
!J) fit'. .
J
PLUMBING'
MECHANICA' .
ELECTRICA' .
'.
PLUMBING
NO'
FEE
CHARGE
Single Fixture
Relocated Bldg.
lnew fix. addtl)
Water Service
ft.
Sanitary Sewer
Storm Sewer
ft.
ft.
Backflow Device
I TOTAL PERMIT
aUAD AREI"
# OF BLDG~'
- OFFICE USE -
LAND USF'
# OF UNIT~'
OCCY GROUP'
CONSTR. TYP"'
HEAT SOURCE:
# OF STORIES:
Sa. FT.
$/sa. FT.
sa. FTG MAIN
x
x
sa. FTG ACCES~
sa. FTG OTHER
x
PLAN CHECK Fi'~
RCPT#
.DAT"
I BUILDING PERMIT
I ....;; State 1""2
Surcharoe J/?
MECHANICAL
/~ of>
-I.P~-
_ VS-'
I;;, State
:::iurchar~e
FENCE
,!A.LYE$
i:i1D~WALK
, PLUMBING
7 ;.State
Surcharoe
I PAVING
CURBCUT
FT.
FT.
TAX LOT' 8,c=:.tY)
PHONF'
3'-f 2-33 () .
ZIP:~ /I{n (
OTHER
I.t'/>->
VALUE: -/0 ~ 00 .
---'
PHONE
CONST.
CONTRACTOR #
EXPIRES
PHONE
MECHANICAL
Nn
"FF
r.t-tARnF
Furnace/burner & vent
< 100.000 BTUs
Furnace/burner & vent
> 100.000 BTUs
Floor furnace and vent
Suspended wall or.floor
mounted unit heater
ApplIance Vent
separate
Stationary evap.
c.ooler
Vent Fan/Single
duct
Vent System apart
from AC or htg.
Mechanical exhaust
hood and duct
Permit Issuance
$10.00
TOTAL PERMIT
HANDICAP ACCESS:
FLOOD PLAIN'
ZONING' ,
LIGHTING POWER BUDGET:
WATER HEATER'
I
VALUE
TOTA~ VA~UE OF .PROJECT
BY
, DEMOLITION
I
I
I
I
I
SUBTOTAL
PERMITS
SYSTEMS
DEVELOPMENT
TOTAL PERMIT FEES I
EXCLUDINGELECTRICA'
/6.~
.
.
'"
It Is the responsibility of the permit holder to see that all Inspections are made at the proper time. To requeet an Inspectlon;,c~1I
728.3781 (recorder), etate your City designated Job number, Job address, type of Inspection requested and when you will be ready
for Inspection. Requests received. before 7:00 a.m. will be made the same workIng day. requests made after 7:00 a.m. will be made
the following work day.
SITE INSPECTION: To be
made after excavation, but
prior to setup of forms.
REQUIRED INSPECTIONS
UNDERSLAB PLUMBING,
. ELECTRICAL 8<
MECHANICAL: To be made
before any work Is covered.
ROUGH PLUMBING,
ELECTRICAL 8<
MECHANICAL: No work Is to
be covered until these
Inspectlons have been made
and approved.
PAVING: After gravel Is In
place but prior to placIng
asphalt or concrete.
FOOTINGS 8< FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel In place, but
prior to placing concrete.
FIREPLACE: Prior to placing
facing materials and before.
framing Inspection.
SPECIAL INSPECTIONS: In accordance
Section 306 of the State Specialty Code,
a special Inspector shall be employed
by the Owner/ Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
ATTIC DRAFT STOPS &
CURTAIN WALLS
CONCRETE SLAB: To be
made after all Inslab building
serylce equipment, conduit,
piping, accessories and other
ancillary equipment Items are
In place but before any
concrete Is placed.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are In
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
STRUCTURAL CONCRETE: In
excess of 2500 P.S,1. (306 a.1)
STRUCTURAL WELDS:
Performed on the job. (2722 f)
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to Installation of
floor Insulation, decking or
floor sheathing.
INSULATION & VAPOR
BARRIER: To be made after all
Insulation and required vapor
barriers are In place but
before any lath or gypsum
board Interior wall coverIng Is
applied. "
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
HIGH STRENGTH BOLTING:
During all bolt Installation and
tightening operations. (306
a.6)
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches.
SPRAYED ON
FIREPROOFING: U.BC.
Standards 43-8.
Sp'ECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork. (306 a.11 &
Chapter 29)
POST & BEAM: To be made
prior to Installation of floor
Insulation, decking or floor
sheathing.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
Interior and exterior, Is In
place but before any
plastering Is applied or before
gypsum board Joints and
fasteners are taped and
finished.
GLU.LAM BEAMS: Inspection
Certlflcate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.BC.
STDS. 25-10,11).
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to Installation of
decking or floor sheathing.
STRUCTURAL MASONRY: (306
a.7)
MASONRY: Steel location,
bond beams grouting or
verticals In accordance with
UBC 2415.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material In
place.
'In addition to the Inspec-
tions specified, the Building
Official may make or require
other Inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
ROOF SHEATHING AND
NAILING: Prior to Installing
any roof coverl ng.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
FINAL PLUMBING
SITE PLAN REVIEW BOARD: Must be requested 2 days In advance
of the date you wish Inspection. All project conditions suCh as
landscaping, parking lot striping, etc. must be completed before
requesting this Inspection.
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department Inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been Issued by the Building Division
and posted on the premIses.
FINAL ELECTRICAL
FINAL MECHANICAL
)( FINAL FIRE DEPARTMENT
ADDITIONAL COMMENTf"
PLANS REVIEWED BY
DAT"
By signature, I state and agree, that I have carefully examined the completed applicatIon and do hereby certify that all Information
herein Is true and correct, and I further certify that any and all work performed shall be done In accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any stru without permission of the Building Safety Division. I further certify that only contractors and employees
who are In compliance h 701.055 will be used on this orolect.
red Inspections are requested at the ~me,-that project ad~ress Is readable from the
d at the front of the property, and the approved set of plans will remain on the site at all
Date~~
/.::>>/ ~"9-S>
RECEIVED ,BY: ~ //~L-
// c.- 'l-
~I
Slgnatur
VALIDATION:
AMOUNT RECEIVED' /-" . S'c
RECEIPT #. ~ ~ ::::>~
" -
DATE PAID:
.
BANNER PERMIT
COMMUNITY SERVICES DIVISION
225 FIFTH STREET
SPRINGFIELD, OR 97477
(541) 726-3753
FAX(541) 726.3689
225 Fifth Street
Springfield, Oregon 97477
Office: 726-3753
INSPECTION LINE: 726.3769
Assessors Map #:
'2.,1 CJ c.j 0~~'"\~ (
\Ih~~
Owner of Property: IN\t~i J T-4~ ~C~b
Address: ;:},-::Z.8A Uv(RJ..1- ,n/).
City:~
I..J
ContractorlInstaller: .A!"(TLMP;"'.
Address:
l{J
Banner Location:
Tax Lot
A~T\
~
City:
n1~
5.~<k/
~oe State:
Phone #: Co "1\7 - (9/6
Statc:SV' Zip: 9}:{~
/ 6(LJn~r
,
Phone#:3C)C{ -,~~~')
(loA
Zip:
Construction Contractors Registration Number:
Expires:
Description:
Date of Installation:
\t'l\(U
Date of Removal:
I rl~ (Cf9
Banner Permit Fee $40,00
Deposit Required $10,0.00
By signature, 1 state and agree that I have carefully completed this application and hereby certify that all
infonnation herein is true and correct. 1 further agree and understand that the above described banner (s) is not
larger than 60 square feet, and will be removed within 14 days from the date listed above. Ifthe banner(s)
is not removed wi hin the timeline specified, I will forfeit the $ I 00.00 deposit. I also understand that this special
penn it can be issu 0 Iy twice per calendar year per development area. I also agree to call the inspection line at
726-3769 by th en "0 the th day to request a' ion-to-verify.the removal of the banner(s). This inspection
~ ro'=~' .OOd'PO'",'."-*)""""~'''d.'f\rk hq
.. -
Date
- f
.______mmn______n___n___n__._________'--__._______________nn___.______m.______________n_________.___n___n_____._____________
-
OFFICE USE
Date of Application:
/P~/ /'''9.::s
~ ~---'~/"? .
, 1 t/-~-
Job#: ~/3.~:t- Receipt#:::? ~<~
-- .. ,
Issued By:
Amount Collected: / t./.t::J. ~