Loading...
HomeMy WebLinkAboutPermit Building 1994-10-10 ~OMM ERCIAL/IN DUSTRIALe PE8MIT APPLICATION 225 Fifth Street, Springfield, Oregon 97477 ASSESSORS MAP: LOCATION OF PROPOSED WORK' J 7/) ? ~ . JOB NUMBER c; 4/ c:; t9 ::> I . INSPECTION LINE: 726.3769 OFFICE: 726.3759 So.'( '(' 2- 2.. C:::-/"f-7~~ /,. 2- ('J #- / S' -ZG) TAX LOT: -.t2!Ji::?CTD PLUMBIN'" MECHANICAl' ELECTRIC' I. GA,flifC...." JIrA.T7A1{'') to YA)AL.!l'f Cu::-c7f2{f' CITY' A-/'-A kJ1 'I OWNER:~3") / /pJ.A!#'Vc;;::tV??':r DESCRIPTION OF WORK: 'NEW REMODEL AD DR""'" ARCHITECT: caNTRACTOR'S NAME GENERAL: SF' I 10 Single Fixture Relocated Bldg. (new fix. addtll Water Service I I I I , I I I I I TOTAL PERMIT Sanitary Sewer Storm Sewer Backllow Device QUAD AREA- . aF BLDG~' OCCY GRaUp: · aF STORIES: PHON'" STATF' ZIP' /=/A'ctJ/l-?~,.;L ~...vA?.# (K'~'y= ~K,rB) ADDITION DEMOLISH OTHER VALUE: I BUILDING PER;+IT :2 7.~ ,?~ 15% State / ..) , , ... Surcharge 7 " .. $ ~ "" MECHANICAL' } j .lTtr /SU~~ / t" tP- 5% State I - -,7,r Surcharce _-I /- I PAVING. I. I NAME ""'( <-l-, PUlMBING ADDRESS PHONE I ".. I fl. I It. I fl. I I Alq;!A,.,k- //~~T I I r JJ/.IJ //I/::? . Im//,A (; I I I I I I I I I ADDRESS S1I7 ~ IIA u'" caNST. CONTRACTOR' S0oJ,l PHONE I;) h- ~9DC EXPIRES :3/9 )' ) I MECHANICAL eeL -CI:IARG~ ""ARGE I In Furnace/burner & vent I < 100.000 BTUs I Furnace/burner & vent I I > 100000 BTUs I I Floor furnace and vent I I I Suspended wall or floor I mounted unit heater I I Appliance Vent I I separate I I Stationary evap. I I cooler I 4 I Vent Fan/Single I~~ /11 /,v I duct /GQ(J I I Vent System apart I I I from AC or htg. I I Mechanical exhaust I I I hood and duct I I I I Permit Issuance I $10.00 I TOTAL PERMIT L/S~OO I PLAN CHECK FF~ RCPP - OFFICE USE - HANDICAP ACCESS' LAND USE: FLOOD PLAIN' ZONIN'" . OF UNIT~' CONSTR. TYPF' HEAT SaURCE' LIGHTING POWER BUDGET: WATER HEATER: SQ. FT. SQ. FTG MAIN X SQ. FTG ACCES~ X SQ, FTG OTHER ..e9"~ /~ pu6fC1/~(Y''l,,(/I# ~ . ~ . TOTAL VALUE OFPROJECT-4?$_.OZ.e:, / $/ SQ, FT. VALUE DATF BY /5".0-0 DEMaLlTlaN 1- , 7'> I .., .4"- I I SUBTOTAL I PERM ITS I SYSTEMS I DEVELOPMENT I PLUMBING /(t;z)Tr 5% State Surchar e FENCE VALU" ~ ISiDEWALK CURBCUT FT. FT. TOTAL PERMIT FEES I EXCLUDING ELECTRICAl sf 3,1 r; . , . REQUIRED INSPECTIONS . it-Is the-~esponslblllty of the permit holder to see that all Inspections are made at the preper time. To request an Inspection, call 726.3769 (recorder), state your City designated job number, lob address, type of Inspectlon requested and when you will be ready for Inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be. made after excavation, but prior to setu~_of lorms. . ~ UNDERSLAB PLUMBING, . ELECTRICAL & MECHANICAL: To be made belore any work Is covered. y ROUG~LUMBIN(,;'> r. -~.:~'~:~~~~~N~ work Is to 1:re-covered until these Inspections have been made and approved. PAVING: After gravel Is In place but prior to p.laclng asphalt or concrete. ,. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all, steel In place, but prior to placing concrete. FIREPLACE: Prior to placing facing materials and before Iramlng Inspection. SPECIAL INSPECTIONS: In accordance Section 306 01 the State Specialty Code a special Inspector shall be employed by the Ownerl Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. ATTIC DRAFT STOPS & CURTAIN WALLS , - STRUCTURAL CONCRETE: in excess of 2500 PS.1. (306 a.1) CONCRETE SLAB: To be made after all Inslab building service equipment, conduit, pi pi ng, accessories and other ancillary equipment items are I n place but before any concrete Is placed. FRAMING: To be made after the roof, all framing, lire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. STRUCTURAL WELDS: Performed on the job. (2722 f) v { " HIGH STRENGTH BOLTING: During all bolt Installation and tightening operations. (306 a.6) FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sheathing. INSULATION & VAPOR BARRIER: To be made after all Insulation and required vapor barriers are In place but before any lath or gypsum board Interior wall covering Is applied. X FiRE & SEPARATION WALL: C Lo.cated and constructed according to plans. .V--LATH ANDIOR GYPSUM t? ' BOARD: To be made after all lathing and gypsum board, Interior and exterior, Is In place but before any plastering Is applied or before gypsum board Joints and fasteners are taped and finished. SPRAYED ON FIREPROOFING: U.B.C. Standards 43-8. UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to Installation of floor Insulation, decking or floor sheathing. SPECIAL GRADiNG, EXCAVATION AND FILLING: During earthwork. (306 a.11 & Chapter 29) POST & BEAM: To be made prior to installation of 1I00r Insulation, decking or floor sheathing. GLU-LAM BEAMS: Inspection Certificate by an approved agency, furnished to the Clty's Building Division before beams are placed. (2501 U.B.c. STDS. 25-10,11). STRUCTURAL MASONRY: (306 a.7) y / 'In addition to the Inspec- tions specified, the Building Olllclal may make or require CURB AND APPROACH other Inspections of any ROOF SHEATHING AND APRONS: After forms are construction work to ensure NAILING: Prior to Installing erected but prior to placing compliance with the Building, any roof covering. concrete. City or Development Code. ~-;NAL~LUM;NG-------------SITE~LAN~EVIEW~OA~;M:~::;:te;~;~~~:nc~ , " of the date you wish Inspection. All project conditions such as . , ....... / landscaping, parking lot striping, etc. must be completed belore .^ FINAL ELECTRICAL requesting this Inspecllon. ~ V FINAL BUILDING: Requested after the final plumbing, electrical, ~ : FINAL MECHANICAL r...... mechanical and Fire Department Inspections are made and. approved. No occupancy of the premises can be made until a Certlllcate of Occupancy has been Issued by the Building Division and posted on the premises. MASONRY: Steel location, bond beams grouting or verticals In accordance with UBC 2415. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material In place. FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS' PLANS REVIEWED BY /,~A . OAT'" By slgnature,l state and agree, that I have carefully examined the completed appllcallon and do hereby certlly that alllnlormatlon herein Is true and correct, and 1 further certify that any and all work performed shall be done in accordance with th&. OrSilnances of the City 01 Springfield, and the Laws 01 the Stale 01 Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are In compliance with ORS 701.055 will be u.sed on this project. I further agree to ensure street, that the permit c times dUr~co~structl b Signature at all required Inspections are requested at the proper time, thaLproJect address Is readable from the rd Is located at the front of the properly, and the approved set of plans will remain on the site at all n,,~\~ ~ Date (0 /o/")~ VALIDATION: AMOUNT RECEIVED: RECEI PT ': 443,1''7 / C)/')tJ) "? DATE PAID' /Z;//~/'7G/' ( j'} r... ~J RECEIVED BY: ~./~ , .