HomeMy WebLinkAboutPermit Building 1999-5-4
~
.
SPRINGFIELD
Page 1
COMMERCIAL/INDUSTRIAL PERMIT APPLICATION
CITY OF SPRINGFIELD Job Number: 990162
COMMUNITY SERVICES DIVISION
BUILDING SAFETY
225 North Fifth Street
Springfield, OR 97477
Office, 726-3759
Inspection Line, 726-3769
Location of Proposed Work: 3018 GATEWAY ST
Assessors Map #, 17032200
Tax Lot #: 02200
Owner: GENERAL GROWTH
Address: 55 W MONROE ST #3100
Phone #: 315-551-5055
City/State/Zip: CHICAGO, IL 60603
Description Of Work, ROAD HOUSE GRILL
NEW
Value:
0.00
Name
Architect, WILKUS ARCHITEC
Address
EDEN PRAIRIE, MN 55344612-
Phone
612-941-8660
Contractor
Canst.
Contractor #
Expires
Phone
General;
BUFFETS INC 0115294
10260 VIKING DR STE 100 EDEN PRAIRI
09/12/00
942-9760
--- PLUMBING ---
NO.
53
Fee
Charge
530.00
130.00
70.00
70.00
20.00
70.00
Single Fixture
Sanitary Sewer 721
Water Service 316
Storm Sewer 332
2 BACK FLOW DEVICES
316' FIRE LINE
ft.
ft.
ft.
TOTAL PERMIT
890.00
--- MECHANICAL ---
NO.
Fee
Charge
36.00
22.50
12.00
7.50
6.00
9.00
8.00
10.00
4
Furnace/burner & vent < 1000,000 BTUs
Mechanical exhaust hood and duct
Vent Fan/Single Duct
MAU-l
COND #l
APPLIANCE VENTS
GAS PIPING
Permit Issuance
TOTAL PERMIT
111.00
HANDICAP ACCESS: Y
ZONING CODE: CC
-- OFFICE USE
QUAD AREA, lCNW
LAND USE, 5300
Item
Square Feet
x
$/Square Feet
Value
,.,..
.,
.;..- SPRINGFIELD
Job Number: 990162
Page 2
Sq. Ftg Main
7488
700,000.00
TOTAL VALUE OF PROJECT
700,000.00
Plan Check Fee:
1,061.45 Rec #: 32791 Date: 02/05/99 Rec By: LORNE PLEGER
BUILDING
Surcharge/Admin
MECHANICAL
Surcharge/Admin
PAVING VALUE
PLUMBING
Surcharge/Admin
\
CITY SDC FEES
1,633.00
130.64
111.00
8.08
200,000.00 658.00
890.00
71.20
68,069.02
SUBTOTAL PERMITS
71,570.94
TOTAL PERMIT FEES'EXCLUDING ELECTRICAL
71,570.94
REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are
made at the proper time. TO request an inspection, call 726-3769
(recorder), state your City designated job number, job address, type of
inspection requested and when you will be ready for inspection. Requests
received before 7:00 a.m. will be made the same working day, requests made after
7:00 a.m will be made the following work day.
Special Inspections: In accordance with
a special inspector shall be employed by
construction of any following fl*" work.
shall be furnished to Building Safety.
Section 306 of the State Specialty Code
the Owner/Contractor during
A copy of the special testing reports
In addition to the inspections specified, the Buil?ing Official may make or
require other inspections of any construction work to ensure compliance with
the Building, City or Development Code.
GRADING/EXCAVATING/FILLING - To be done during constr by Special State
Certified Inspector. Provide reports/tests to City Building Inspector
STRUCTURAL CONCRETE in excess of 2500 psi. To be done during constr.
by State Cert. Insp. Results to City Building Inspector
FOOTING - After trenches are excavated.
FOUNDATION - After forms are erected but prior to concrete placement.
WATER LINE - Prior to filling trench.
SANITARY SEWER LINE - Prior to filling trench.
STORM SEWER LINE - Prior to filling trench.
UNDER FLOOR PLUMBING - Prior to insulation or decking.
SLAB - TO be made after all inslab building service equipment, conduit
piping, and other equipment items are in place but prior to concrete
ROUGH PLUMBING - Prior to cover.
ROUGH GAS - after line is installed and capped if not attached to an
appliance
ROUGH MECHANICAL - Prior to cover.
ROUGH. ELECTRICAL - Prior to cover.
_,v- SPRINOFIELD
,
~,
Job Number: 990162
Page 3
ELECTRICAL SERVICE - Must be approved to obtain permanent power.
FRAMING - Prior to cover.
SHEAR WALL NAILING - Before covering sheathing with finish materials.
ROOF SHEATING/NAILING - Before covering sheathing with finish material
INSUL-V.B./SUB: TO BE CALLED FOR AT SAME TIME AS SUB FRAMING INSPECT
DRYWALL - Prior to taping.
MECH/SUB: FOLLOWING ROUGH MECHANICAL APPROVAL, PRIOR TO COVER
CEILING GRID
FINAL PAVING - After paving is complete.
FINAL PLUMBING - When all plumbing work is complete.
FINAL GAS - When all gas work is complete.
GAS SERVICE - After line is installed and line has been connected to a
minimum of one applian~e. Pressure test done at this point.
FINAL MECHANICAL - When all mechanical work is complete.
FINAL ELECTRICAL - When all electrical work is complete.
FINAL/SUB
FINAL FIRE - When all Fire Department requirements have been met.
been met.
FINAL BUILDING - When all required inspections have been approved and
the building is complete.
--- ADDITIONAL COMMENTS ---
DRC 98-12-265, PLANNER IS LAUREN LEZELL
SITE PLAN REVIEW JOURNAL #98-12-265, LAUREN LEZELL, PLANNER
FINAL SITE PLAN INSPECTION REQUIRED BY LAUREN LEZELL PRIOR TO OCCUPANCY APPROVAL
Plans Reviewed By: LORNE PLEGER
Building Site Reviewed By: LISA HOPPER
Date: 03/24/99
By signature, I state and agree, that I have carefully examined the completed
application and do hereby certify that all information hereon is true and
correct, and I further certify that any and all work performed shall be done
in accordance with the Ordinances of the City of Springfield, and the Laws
of the State of Oregon pertaining to the work described herein, and that
NO OCCUPANCY will be made of any structure without permission of the
Community Services Division, Building Safety. I further certify that only
contractors and employees who are in compliance with ORS 701.055 will be
used on this project.
I further agree to ensure that all required inspections are requested at the
proper time, that project address is readable from the street, that the
permit card is located at the front of the property, and the approved set
of plans wil' ~o:ain on the site at all times during construction.
/(k,Add
54-95
Date
- -- VALIDATION
Date Paid:
?-;Jg~C/
L;'>- 'I 99
Receipt Number:
Received By:
72 . &./~ -09' '2
~
r i/~7 .
I;f'L~, c:c~"'c7.
Amount Received: