Loading...
HomeMy WebLinkAboutPermit Building 1999-5-4 ~ . SPRINGFIELD Page 1 COMMERCIAL/INDUSTRIAL PERMIT APPLICATION CITY OF SPRINGFIELD Job Number: 990162 COMMUNITY SERVICES DIVISION BUILDING SAFETY 225 North Fifth Street Springfield, OR 97477 Office, 726-3759 Inspection Line, 726-3769 Location of Proposed Work: 3018 GATEWAY ST Assessors Map #, 17032200 Tax Lot #: 02200 Owner: GENERAL GROWTH Address: 55 W MONROE ST #3100 Phone #: 315-551-5055 City/State/Zip: CHICAGO, IL 60603 Description Of Work, ROAD HOUSE GRILL NEW Value: 0.00 Name Architect, WILKUS ARCHITEC Address EDEN PRAIRIE, MN 55344612- Phone 612-941-8660 Contractor Canst. Contractor # Expires Phone General; BUFFETS INC 0115294 10260 VIKING DR STE 100 EDEN PRAIRI 09/12/00 942-9760 --- PLUMBING --- NO. 53 Fee Charge 530.00 130.00 70.00 70.00 20.00 70.00 Single Fixture Sanitary Sewer 721 Water Service 316 Storm Sewer 332 2 BACK FLOW DEVICES 316' FIRE LINE ft. ft. ft. TOTAL PERMIT 890.00 --- MECHANICAL --- NO. Fee Charge 36.00 22.50 12.00 7.50 6.00 9.00 8.00 10.00 4 Furnace/burner & vent < 1000,000 BTUs Mechanical exhaust hood and duct Vent Fan/Single Duct MAU-l COND #l APPLIANCE VENTS GAS PIPING Permit Issuance TOTAL PERMIT 111.00 HANDICAP ACCESS: Y ZONING CODE: CC -- OFFICE USE QUAD AREA, lCNW LAND USE, 5300 Item Square Feet x $/Square Feet Value ,.,.. ., .;..- SPRINGFIELD Job Number: 990162 Page 2 Sq. Ftg Main 7488 700,000.00 TOTAL VALUE OF PROJECT 700,000.00 Plan Check Fee: 1,061.45 Rec #: 32791 Date: 02/05/99 Rec By: LORNE PLEGER BUILDING Surcharge/Admin MECHANICAL Surcharge/Admin PAVING VALUE PLUMBING Surcharge/Admin \ CITY SDC FEES 1,633.00 130.64 111.00 8.08 200,000.00 658.00 890.00 71.20 68,069.02 SUBTOTAL PERMITS 71,570.94 TOTAL PERMIT FEES'EXCLUDING ELECTRICAL 71,570.94 REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. TO request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m will be made the following work day. Special Inspections: In accordance with a special inspector shall be employed by construction of any following fl*" work. shall be furnished to Building Safety. Section 306 of the State Specialty Code the Owner/Contractor during A copy of the special testing reports In addition to the inspections specified, the Buil?ing Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. GRADING/EXCAVATING/FILLING - To be done during constr by Special State Certified Inspector. Provide reports/tests to City Building Inspector STRUCTURAL CONCRETE in excess of 2500 psi. To be done during constr. by State Cert. Insp. Results to City Building Inspector FOOTING - After trenches are excavated. FOUNDATION - After forms are erected but prior to concrete placement. WATER LINE - Prior to filling trench. SANITARY SEWER LINE - Prior to filling trench. STORM SEWER LINE - Prior to filling trench. UNDER FLOOR PLUMBING - Prior to insulation or decking. SLAB - TO be made after all inslab building service equipment, conduit piping, and other equipment items are in place but prior to concrete ROUGH PLUMBING - Prior to cover. ROUGH GAS - after line is installed and capped if not attached to an appliance ROUGH MECHANICAL - Prior to cover. ROUGH. ELECTRICAL - Prior to cover. _,v- SPRINOFIELD , ~, Job Number: 990162 Page 3 ELECTRICAL SERVICE - Must be approved to obtain permanent power. FRAMING - Prior to cover. SHEAR WALL NAILING - Before covering sheathing with finish materials. ROOF SHEATING/NAILING - Before covering sheathing with finish material INSUL-V.B./SUB: TO BE CALLED FOR AT SAME TIME AS SUB FRAMING INSPECT DRYWALL - Prior to taping. MECH/SUB: FOLLOWING ROUGH MECHANICAL APPROVAL, PRIOR TO COVER CEILING GRID FINAL PAVING - After paving is complete. FINAL PLUMBING - When all plumbing work is complete. FINAL GAS - When all gas work is complete. GAS SERVICE - After line is installed and line has been connected to a minimum of one applian~e. Pressure test done at this point. FINAL MECHANICAL - When all mechanical work is complete. FINAL ELECTRICAL - When all electrical work is complete. FINAL/SUB FINAL FIRE - When all Fire Department requirements have been met. been met. FINAL BUILDING - When all required inspections have been approved and the building is complete. --- ADDITIONAL COMMENTS --- DRC 98-12-265, PLANNER IS LAUREN LEZELL SITE PLAN REVIEW JOURNAL #98-12-265, LAUREN LEZELL, PLANNER FINAL SITE PLAN INSPECTION REQUIRED BY LAUREN LEZELL PRIOR TO OCCUPANCY APPROVAL Plans Reviewed By: LORNE PLEGER Building Site Reviewed By: LISA HOPPER Date: 03/24/99 By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans wil' ~o:ain on the site at all times during construction. /(k,Add 54-95 Date - -- VALIDATION Date Paid: ?-;Jg~C/ L;'>- 'I 99 Receipt Number: Received By: 72 . &./~ -09' '2 ~ r i/~7 . I;f'L~, c:c~"'c7. Amount Received: