COMMERCIAL/INDUSTRIAL PERMIT APPLICATION
CITY OF SPRINGFIELD Job Number: 980538
COMMUNITY SERVICES DIVISION
BUILDING SAFETY
225 North Fifth Street
Springfield, OR 97477
Office: 726-3759
Inspection Line: 726-3769
Location of Proposed Work: 2900 GATEWAY ST
Assessors Map #: 17032200
Tax Lot #: 02200
Owner: GENERAL GROWTH
Address: 110 N WACK4ER
Phone #: 312-960-5140
City/State/zip: CHICAGO, IL 60606
Description Of Work: TINSELTOWN THEATER
NEW
Value:
0,00
Name
Architect: KIP DANIEL
Address
7001 PRESTON RD #210, DALLAS TX
Phone
214-522-8494
Contractor
Canst.
Contractor #
Expires
Phone
General:
COLORADO STRUCT 0075359
7515 NE AMBASSADOR PLACE SUITE E PO
07/22/98
800 234-2243
--- PLUMBING
No.
156
Fee
Charge
1,560.00
1. 00
Single Fixture
BACKFLOW DEVICE
TOTAL PERMIT
1,561.00
--- MECHANICAL ---
NO.
Fee
Charge
168.00
73.50
13.50
10,00
23
Furnace/burner & vent ~ 1000,000 BTUs
Vent Fan/Single Duct
27 GAS OUTLETS
Permit Issuance
TOTAL PERMIT
265.00
,'...
QUAD AREA: 1CNW
ZONING CODE: CC
-- OFFICE USE --
LAND USE: 5300
OCCY GROUP: A3
# OF BLDGS: 1
Item
Square Feet
x
$/Square Feet
Value
TOTAL VALUE OF PROJECT
7,169,000.00
BUILDING
Surcharge/Admin
MECHANICAL
11,336.50
906.93
265.00
SPRINGFIELD
~
.
.
/.:tl'~
Job Number: 980538
Page 2
Surcharge/Admin
PLUMBING
Surcharge/Admin
CITY SDC FEES
CP.EDIT FOR PLAN
REVIEW OVERPAY
20.40
1,561.00
124.88
10,000.00
0.00
-322.72
SUBTOTAL PERMITS
23,891.99
TOTAL PERMIT FEES EXCLUDING ELECTRICAL
23,891.99
REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are
made at the proper time. TO request an inspection, call 726-3769
(recorder), state your City designated job number, job address, type of
inspection requested and when you will be ready for inspection. Requests
received before 7:00 a.m. will be made the same working day, requests made after
7:00 a.m will be made the following work day.
Special Inspections: In accordance with
a special inspector shall be employed by
construction of any following 11*11 work.
shall be furnished to Building Safety.
Section 306 of the State Specialty Code
the Owner/Contractor during
A copy of the special testing reports
In addition to the inspections specified, the Building Official may make or
require other inspections of any construction work to ensure compliance with
the Building, City or Development Code.
GRADING/EXCAVATING/FILLING - To be done during constr by Special State
(. Certified Inspector. Provide reports/tests to City Building Inspector
PILING, DRILLED PIERS/CAISSIONS - To be done during construction by
State Certified Special Inspector employeed by owner/contractor.
BOLTS INSTALLED IN CONCRETE - To be done by State Certified Special
Inspector. Provide inspection/test reports to City Building Inspector
FOOTING - After trenches are excavated.
FOUNDATION - After forms are erected but prior to concrete placement.
SLAB - To be made after all inslab building service equipment, conduit
piping, and other equipment items are in place but prior to concrete
ROUGH PLUMBING - Prior to cover.
ROUGH MECHANICAL - Prior to cover.
ROUGH GAS - after line is installed and capped if not attached to an
appliance
ROUGH ELECTRICAL - Prior to cover.
ELECTRICAL SERVICE - Must be approved to obtain permanent power.
MASONRY - Steel location, bond beams grouting or verticals in
accordance with UBC 2415.
FRAMING - Prior to cover.
STRUCTURAL MASONRY - To be done during constr by State Certified
Special Inspector. Provide results to City Building Inspector.
STRUCTURAL WELDS - To be done during constr by State Cert Special
Inspector. Results of inspection/test to City Building Inspector.
SPRAYED ON FIREPROOFING - To be done during constr by State Cert Spec
Inspector. Provide reports/tests to City Building Inspector.
HIGH STRENGTH BOLTING - To be done during constr by State Certified
Special Inspector. Results provided to City Building Division.
INSULATION - Floor; prior to decking Wall/Ceiling; Prior to cover
INSUL-V.B./SUB: TO BE CALLED FOR AT SAME TIME AS SUB FRAMING INSPECT
SPRINGFIELD
Job Number: 980538
Page 3
DRYWALL - Prior to taping.
FIREWALL - Located and constructed according to plans.
CEILING GRID
FINAL PLUMBING - When all plumbing work is complete.
F~NAL GAS - When all gas work is complete.
GAS SERVICE - After line is installed and line has been connected to a
minimum of one appliance. Pressure test d9ne at this point.
FINAL MECHANICAL - When all mechanical work is complete.
FINAL ELECTRICAL - When all electrical work is complete.
FINAL FIRE - When all Fire Department requirements have been met.
been met.
FINAL/SUB
FINAL BUILDING - When all required inspections have been approved and
the building is complete.
--- ADDITIONAL COMMENTS ---
SITE WORK PERMITTED UNDER JOB #980538
FINAL SITE REVIEW INSPECTION BY SARAH SUMMERS, CITY PLANNER
Plans Reviewed By: Date:
Building Site Reviewed By: LISA HOPPER
By signature, I state and agree, that I have carefully examined the completed
application and do hereby certify that all information hereon is true and
correct, and I further certify that any and all work performed shall be done
in accordance with the Ordinances of the City of Springfield, and the Laws
of the State of Oregon pertaining to the work described herein, and, that
NO OCCUPANCY will be made of any structure without permission of the
Community Services Division, Building Safety. I further certify that only
contractors and employees who are in compliance with ORS 701.055 will be
used on this project.
I further agree to ensure that all required inspections are requested at the
proper time, that project address is readable from the street, that the
permit card is located at the front of the property, and the approved set
of plans will remain on the site at all times during construction.
4142
Signature
....
{p- / (5-9R
Date
-- - VALIDATION
Receipt Number: -=3.e> ::J ? s/
Date Paid: hv'12 ~
Amount Received: ?? ~ c.//? ~
, . -
Received By: A~ ~
"~//' -