HomeMy WebLinkAboutNotes, Work APPLICANT 10/14/2005
P~&;2tJO.s- L /o~1 .::JOI<IHGN / 11:;. ,If-"(
/()f~fd5 ~. Me/<~NN?V
TENTATIVE LAND DIVISION APPLICATION
PRE-SUBMI I I AL CHECKLIST
TRANSPORTATION
o Right-of-Way Approach Permit application must be provided where the property has
frontage on an Oregon Department of Transportation (ODOT) facility.
Complete Incomplete See
Notes
~ 1M Iif: (I) Copy of ROW approach Permit Application
~o raffic Impact Study-four copies of a study prepared by a Traffic Engineer in
~. \" \ accordance with SDC Section 32.020(1)(c). Traffic Impact Studies (TIA) allow the City to
analyze and evaluate the traffic impacts and mitigation of a development on the City's
transportation system. In general, a TIA must explain how the traffic from a given
development affects the transportation system in terms of safety, traffic operations,
access and mobility, and immediate and adjoining street systems. A TIA must also
address, if needed, City, metro plan and state land use and transportation policies and
objectives.
Complete Incomplete See
Notes
f5m
T;iim
~
I':%l
~
Traffic impact Study
o Tentative Land Division Plan
Complete Incomplete See
Notes
~ E:1j El
"'+'~'f
W fill ~
..... ~ 1
(Ph
Location and type of existing and proposed street
lighting
Location, widths and names of all existing and
proposed streets, alleys, dedications or other right-of-
ways within or adjacent to the proposed land division
1M
IT'Jl
CJ
o
ti::.4'
Location of existing and required traffic control devices
Notes:
~.~...lI'/&T_i~.~~1&t.
( I ') '\Ze~ I tz-eS .:Su aM /. /" I Kt. -() F E ;</1 riAl 9 PGfZ.IVI (T a t<!.
A??t-I c.A 'T7 () AI .
7121/04
d