Loading...
HomeMy WebLinkAboutComments SUB 4/23/2008 SPRINGFIELD UTILITY BOARD WAT[R HRVICr C[NT[R 202 South 18th Street Springfield, OR 97477-S240 Tel541 7262396 Fax 541 7477348 www subutd com Apnl18,2008 Andy Llmblrd CIty of Spnngfleld 225 N 5th Street Spnngfield, OR 97477 Dear Andy SUBJECT DEVELOPMENT ISSUES MEETING #ZON2008-000 17 McKEE Tax Map 17-03-24-31, Tax Lot 1300, 1742 Delrose Avenue LIsted below are our comments for the above referenced development proposal 1 The proposed development IS wlthm the Spnngfield CIty lImIts and wIll receIve water servIce from the Spnngfleld UtilIty Board (SUB) The water mam IS located on the north SIde of Del rose Avenue and the west SIde of Grand VIsta Dnve The mam can be accessed on eIther SIde of the new parcel wIthout haVIng to cut the street 2 All new water system facIlIties and modIfIcatIOns to water system facIlIties both mSlde and adjacent to the proposed development shall be placed m street nght-of-way at a locatIOn and depth of bury that meets the standards of the SUB Water DIVISIOn 3 All water facIlIty matenals shall be to a standard that must meet SUB Water DIVISIOn specIficatIOns 4 All workmanshIp shall be performed to meet or exceed SUB Water DIVIsIOn construction standards 5 SIze ofwaterlme and other facIlIties, mcludmg water meters, must meet the needs of the SUB \\rater DIVISIon and the long-range needs of the Cny These needs mclude, but are not lImned 10, meter locatIOn and access, SIzes of water dIstrIbutIOn and transmISSIOn lInes, pumpmg facIlIties, and commumcatIOn lInes 6 Please ask the developer to contact the SUB Water DIVISIOn for detaIled mformatIon on the matenals and constructIOn standards, detaIled costs for mstallIng SUB water faclhtIes, and a schedule of constructIOn. ConstructIOn expenses may be reduced WIth good planmng of reqUired water faCIlIties, good tImmg of faclhtIes mstallatIon, and Jomt trench opportumtIes 7 All water meters wIll be placed m publIc nght-of-way at a locatIOn Identified by the developer Each lot or parcel must have ItS own water servIce 8 Water serVIce faclhtIes WIll be mstalled upon collection of development charges. Development polIcIes and charges Identified m thIS letter are subject to change. Actual charges WIll be those m S \SITEPLAN\1742 Delrose Ave development Issues 4-18-08 docx Date Received: Planner: Al 'Ill) jUJcr . ,/- .J effect at the tIme water serVIce IS requested \ 9 Spnngfield has several wellhead protectIon areas Nmety percent of Spnngfield's dnnkmg water comes from wells In every mstance, care shall be taken to prevent groundwater contammatIOn Contractors/developers/owners shall be responsIble for the safe handlIng and storage of chemIcals, petroleum products, fertIlIzers, and the preventIOn of groundwater and storm water runoff contammatIOn SpecIal reqUIrements may be necessary for groundwater protectIon at thIS development Contact Amy ChImtz at Spnngfield UtIlIty Board Water DlVlSIOn for detaIls at 726-2396. PLEASE NOTE: SUB development charges are paid dIrectly to SUB Water DIvISIOn and SUB ElectrIc DIvISIon Smcerely, ~t -Z;L Rebecca Templm, P E Water Engmeenng SupervIsor - Water DIVISIon RATmk cc James Scott McKee, 1101 16th Street, Spnngfield, Oregon 97477 Rob Ward, Ward Northwest Inc, P O. Box 105, Florence, Oregon 97439 S \SITEPLAN\1742 Delrose Ave development Issues 4-18-08 docx Date Received: Planner: Al 1;0 3/.2t1btf -, I-----==-