HomeMy WebLinkAboutPermit Building 1999-2-18
, .
CO M M ERCIALlI N DUST RIAL
PERMIT APPLICATION
~
"OB NUMBER??' ~/?.i-
INSPECTION LINE: 726-3769
OFFICE: 726-3759
225 Fifth Street, Springfield, Oregon 97477
/!,) ;ry.-J tl'1--
i
LOCATION OF PROPOSED WORK. ~ "/ Jl t'J
ASSESSORS MAP: 17 ~'3 ~2 '2.0
OWNER.
ADDRESS'
CITY.
,,6tfll
TAX LOT'
:z:. L L rf 1/15- 7: ;'
?0) \' (f// /Ir--.,)
c<:::;/)f'~'/ j/./
) :J
PHONE:
7 f' ~-ft,/~<V.
/ /_J
STATF.
ZIp.
NEW
DESCRIPTION OF WORK:
REMODEL
4J}P r_,1.fJ c.J_7',..-r- /.I,
V-ADDITION DEMOLISH
VALUE:
ARCHITECT.
OTHER
NAME
ADDRESS
PHONE
CDNST.
CDNTRACTDR'S NAME ADDRESS . CDNTRACTDR ::-..>j)~EXPIRES;;.1'~ PHDNE
GENERAL: ~~ .;Z~~er /'..J"r+v.1.SD 2117 ~.it...,,,...11,j5p_~ ...::: etffZ,?dO
PLUMBIN(" ~1t.,"1" ~ '$38SI( (l...., 1t,,,41L . ~J V' ~pl.fl'f~ 1 "'-I2-~7.z1
N\iTICE:
Thi.:i r-t:NMII IiHALL EXF IRE IF 1 fiE WORK
t.:.m IJili'<:i::u UNUl:H TH S PER~ IT IS NOT
,....("\.p,...,.,....._~ _.-
..",-,..t"~,,VL.U un ,;:, flt:lfl ~UUNEII FOR
^l\fV.oj nJ"\ .....,t... "'-t'"" --
, -, ......'" ...."1. L.n'UIJ
TOTAL PERMIT - ", .
MECHANICAL'
ELECTRICA' .
I
i NO.
i
I
I
I
I
I
1
I
I
I
I
I
OUAD AREA:
# DF BLDGS'
PLUMBING
MECHANICAL
FEE
NO
r.HARl1F
FFF
CHARGE
Single Fixture
Relocated Bldg.
Inew fix. addtll
Water Service
Furnace/burner & vent
< 100,000 BTUs
Furnace/burner & vent
> 100.000 BTUs
Floor furnace and vent
Suspended wall or floor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
~. ._ VenLF.anI.Sin.Qle .
AI'I crCludiJr~:ure\lon law reqUlrols you hi'
10110." Nml~Gl1l!ltiBp;;ny me ure~ Oil UlIlI'lY
'lOtili(atl~~~~~tt"F-~P ",I,,~ 0 -" ''''It f! rlh
'n OAll m~-\;~o"!tJ1K'ibugh OA ~ 952-0 )1-
0090, You may oDtalO copies or II Ie rUle~ oy
s:'.!,~~:;~~""':' ':9nter {t\lnto' tho to. lO!"hQ[l1=
numbEll'e1illitlrssQrregon Utility Notificatio, $10.00
TOTAL PEAMi~ter IS 1-8UU-;j;j~-~;j44), .
It.
Sanitary Sewer
It.
.zr:w
Storm Sewer
ft.
Backllow Device
- OFFICE USE -
HANDICAP ACCESS:
LAN D USE:
FLDDD PLAIN'
# DF UNIT!':'
ZONING'
CDNSTR TYPF.
HEAT SDURCF'
LIGHTING PDWER BUDGET:
DCCY GRDUp.
WATER HEATER"
# DF STORIE!':.
so. FT.
VALUE
$/SO. FT.
X
so. FTG MAl N
SO. FTG ACCESS
X
so. FTG DTHER
X
. . TDTAL VALU E DF PROJECT
PLAN CHECK FEF
I BUILDING PERMIT
15% State
Surcharg.e
I MECHANICAL
15% State
Surcharoe
I PAVING
RC PTN
DATF
BY
PLUMBING
z.s-e<>
.
I. 1..S'ln"
DEMOLlTlDN
5% State
Surcharge
FENCE
VALUE $
SIDEWALK
SUBTOTAL
PERMITS
SYSTEMS
DEVELDPMENT
CURBCUT
FT.
FT.
TOTAL PERMIT FEES I
EXCLUDING ELECTRICA'
,:J. 7. ov
.
REQUIRED INSPECTIONS
.
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made
the following work day.
SITE INSPECTION: To be
made after excavation, but
prior to setup' of forms.
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work Is covered.
ROUGH PLUMBING,
ELECTRICAL &
MECHANICAL: No work is to
be covered until these
inspections have been made
. and approved.
PAVING: After gravel is In
place but prior to placing
asphalt or concrete.
ATTIC DRAFT STOPS &
CURTAIN WALLS
SPECIAL INSPECTIONS: In accordance
Section 306 of the State Specialty Code
a special Inspector shall be employed
by the Owner I Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to placing concrete.
FIREPLACE: Prior to placing
facing materials and before
framing inspection.
STRUCTURAL CONCRETE: In
excess of 2500 P.S.1. (306 a.1)
CONCRETE SLAB: To be
made after all inslab building
service equipment, conduit,
piping, accessories and other
ancillary equi pment items are
C;nt>.lace but before any
cjcrete is placed.
UNDERGROUND: Plumbing,
.... electrical, gas; sa1nitary sewer,
storm sewer, water and
d ral nage Ii nes. To be made
prior to covering or filling
trenches.
FRAMING: To be made after
the roof, all framing, fire
blocking and braclng are in
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
STRUCTURAL WELDS:
Performed on the job. (2722 f)
.INSULATION & VAPOR
BARRIER: To be made after ail
insulation and required vapor
barriers are In place but'
before any lath or gypsum
board Interior wall covering Is
applied.
HIGH STRENGTH BOLTING:
During all bolt Installation and
tightening operations. (306
a.6)
SPRAYED ON
FIREPROOFiNG: U.BG.
Standards 43.8.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to Installation of
floor Insulation, decking or
floor sheathing.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork. (306 a.11 &
Chapter 29)
GLU:LAM BEAMS: Inspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.B.C.
STDS. 25-10,11).
POST & BEAM: To be made
prior to Installation of floor
Insulation, decking or floor
sheathing.
LATH AND/OR GYPSUM
BOARD: To be made after ail
lathing and gypsum boar'd,
'Interior and exterior, is in
place but before any
plastering Is applied or before
gypsum board Joints a'nd
, fasteners are taped and
finished.
STRUCTURAL MASONRY: (306
a.7)
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to Installation of
decking or floor sheathing.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material In
place.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
UBC 2415.
*In addition to the'inspec-
tions specified, the Building
Official may make or require
CURB AND APPROACH other inspections of any
ROOF SHEATHING AND APRONS: After forms are construction work to ensure
NAILING: Prior to Installing erected but prior to placing compliance with the Building,
6ariY)rOOf covering. concrete. City or Development Code.
---/'----------------~--------------------------------
....FINAL PLUMBING SITE PLAN REVIEW BOARD: Must be requested 2 days In advance
of the date you wish Inspection. All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesting this inspection.
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department Inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been Issued by the Building Division
and posted on the premises.
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENTS:
PLANS REVIEWED BY
DATF
By signature, I state and agree, that I have carefully ex.amined the completed application and do hereby certify th?t all Information
herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in compliance with OAS 701.055 will.be used on' this project.
I further agree to ensure that all required Jnspecti00s' a:e requested at the proper time, that project address Is readable from the
street, that the permit card Is located at the front of the property, and the approved set of plans will remain on the site at all
times durJng constructl~n. /
Signature J1q0/~ Date-PJ-17
VALIDATION:
:/
AMOUNT RECEIVED'
'RECEIPT ..
J- 7, OJ)
tl3...tlo 1
DATE PAID: _J:I'&/'1'! - "-
RECEIVED BY' 'J {;J~