HomeMy WebLinkAboutPermit Building 1996-4-9
SPRINGFIELD
~-
Page 1
COMMERCIAL/INDUSTRIAL PERMIT APPLICATION
CITY OF SPRINGFIELD Job Number: 960223
COMMUNITY SERVICES DIVISION
BUILDING SAFETY
225 North Fifth Street
Springfield, OR 97477
Office: 726-3759
Inspection Line: 726-3769
Location of Proposed Work: 3443 HUTTON WAY
Assessors Map #: 17032220
Tax Lot #: 00803
Owner: SYCAN B CORP
Address: 3405 BALDY VIEW LANE
Phone #: 746-8444
City/State/Zip: SPRINGFIELD, OREGON 97477
Description Of Work: MARIOTT MOTEL
NEW
Value:
3,800.00
Name
Architect: GREG ALLWITE
Address
Phone
206-431.7960
Contractor
Canst.
Contractor #
Expires
Phone
General:
MEGA PACIFIC
PO Box 82186 Portland
AMERICAN HEATIN
1339 SE Gideon Street
0063108
OR 972820186
0033135
Portland OR 9
01/16/97
238-3772
Mechanical:
06/18/96
239-4600
PLUMBING
NO,
438
Fee
Charge
4,380,00
85,00
55,00
490,00
20.00
55,00
Single Fixture
Sanitary Sewer
Water Service
Storm Sewer
2 BACKFLOW DEVICES
183' FIRE LINE
362
186
3085
ft,
ft,
ft.
TOTAL PERMIT
5,085.00
--- MECHANICAL ---
No,
Fee
Charge
60.00
9,00
438,00
18,00
33.00
60.00
14,50
10,00
146
Furnace/burner & vent < 1000,000 BTUs
Mechanical exhaust hood and duct
Vent Fan/Single Duct
3 AC UNITS
11 APPLIANCE VENTS
10 HP UNITS
VENT SYSTEM & GAS
Permit Issuance
TOTAL PERMIT
642,50
HANDICAP ACCESS: Y
# OF UNITS: 116
-- OFFICE USE
QUAD AREA: lCNW
ZONING CODE: CC
LAND USE: 5300
Item
Square Feet
x
$/Square Feet
=
Value
SPRINGFIELD
/~I'~
Job Number: 960223
Page 2
Sq, Ftg Main
60466
3,019,000.00
TOTAL VALUE OF PROJECT
3,019,000,00
Plan Check Fee:
5,319.00 Rec #: 20428 Date: 02/20/96 Rec By: DON MOORE
BUILDING
Surcharge/Admin
MECHANICAL
Surcharge/Admin
PAVING VALUE
PLUMBING
Surcharge/Admin
FENCE VALUE
SIDEWALK
CURBCUT
PLAN REVIEW OVERPAY
2,970,00
5,111,50
408,93
642,50
50,61
691,75
5,085,00
406,80
5,00
54.55
15.55
-1,996,53
214,000,00
SUBTOTAL PERMITS
SYSTEMS DEVELOPMENT
...v~ -:Z~I t:>5"?" 6
~ "'* 7Y2.a9
111,27~
..1.,
ap#;JY~~~2tl;;
REQUIRED INSPECTIONS
10,475,66
100,802,~-i"
TOTAL PERMIT FEES EXCLUDING ELECTRICAL
It is the responsibility of the permit holder to see that all inspections are
made at the proper time, To request an inspection, call 726-3769
(recorder), state your City designated job number, job address, type of
inspection requested and when you will be ready for inspection. Requests
received before 7:00 a.m. will be made the same working day, requests made after
7:00 a,m will be made the following work day,
Special Inspections: In accordance with
a special inspector shall be employed by
construction of any following 11*11 work.
shall be furnished to Building Safety,
Section 306 of the State Specialty Code
the Owner/Contractor during
A copy of the special testing reports
In addition to the inspections specified, the Building Official may make or
require other inspections of any construction work to ensure compliance with
the Building, City or Development Code.
TEMPORARY POWER
UNDERGROUND ELECTRICAL - Prior to Cover,
UNDERGROUND PLUMBING - Prior to filling trench.
FOOTING - After trenches are excavated,
FOUNDATION - After forms are erected but prior to concrete placement,
SLAB - To be made after all inslab building service equipment, conduit
piping, and other equipment items are in place but prior to concrete
ROUGH PLUMBING. Prior to cover,
ROUGH MECHANICAL - Prior to cover.
ROUGH ELECTRICAL - Prior to cover,
ELECTRICAL SERVICE - Must be approved to obtain permanent power.
FRAMING - Prior to cover.
INSULATION - Floor; prior to decking Wall/Ceiling; Prior to cover
SPRINGPIELD
~.
Job Number: 960223
Page 3
DRYWALL - Prior to taping,
CURB CUT - After forms are erected but prior to placement of concrete.
SIDEWALK - After excavation is complete, forms and sub-base material
in place,
ROUGH GRADING - After gravel is in place but prior to placing concrete
FINAL PLUMBING - When all plumbing work is complete,
FINAL MECHANICAL - When all mechanical work is complete,
FINAL ELECTRICAL. When all electrical work is complete,
FINAL FIRE - When all Fire Department requirements have been met,
been met,
CONC SLAB/SUB: PRIOR TO/FOLLOWING POUR
INSUL-V,B,/SUB: TO BE CALLED FOR AT SAME TIME AS SUB FRAMING INSPECT
MECH/SUB: FOLLOWING ROUGH MECHANICAL APPROVAL, PRIOR TO COVER
FINAL/SUB
FINAL SITE PLAN - After all requirements have been met for Minimum
Development Standards or from the Development Agreement,
FINAL BUILDING - When all required inspections have been approved and
the building is complete,
--- ADDITIONAL COMMENTS ---
DRC #95-11-209, PLANNER IS LAUREN LEZELL
SITE PLAN REVIEW JOURNAL #95'11-209, LAUREN LEZELL
Plans Reviewed By: LORNE PLEGER
Building Site Reviewed By: LISA HOPPER
Date: 04/03/96
By signature, I state and agree, that I have carefully examined the completed
application and do hereby certify that all information hereon is true and
correct, and I further certify that any and all work performed shall be done
in accordance with the Ordinances of the City of Springfield, and the Laws
of the State of Oregon pertaining to the work described herein, and that
NO OCCUPANCY will be made of any structure without permission of the
Community Services Division, Building Safety, I further certify that only
contractors and employees who are in compliance with ORS 701,055 will be
used on this project,
I further agree to ensure that all required inspections are requested at the
proper time, that project address is readable from the street, that the
permit card is located at the front of the property, and the approved set
of plans will remain on the site at all times during construction,
tAr'l~ ~~ H~
I
Lf -Cf'-C(1tJ
Date
--- VALIDATION
Date Paid:
~ jc//?
7"'~~b
-;z?; .::;'~5': :2b
; .
-~~
Receipt Number:
Amount Received:
Received By:
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE
(COMMERCIAL / INDUSTRIAL)
Name or Company: SYCAN B CORP
Location: 3443 HUTTON WAY
Developement Type: C Building Size:
Job No,: 960223
Lot Size:
1. STORM DRAINAGE
Impervious Sq Ft 1,0 X 94606
Page 1
Sq Ft
0,210
Per Sq Ft $19,867,26
.3Jt~ /~#- ~ 'U7.1I.
X
2. SANITARY SEWER
Number Of PFUs
(see Page 2)
- CITY
l.0 X 892
X
43,43
Per PFU
3. TRANSPORTATION
Number Of Units
1,0 X 116 X
X Trip Rate
0,420 X
X
Cost Per Trip
437,93
$21,335,95
Transportation Total
4. SANITARY SEWER - MWMC
Number Of PFUs
892
X
X
Per PFU + MWMC Admin Fee
18,750 + 10,00
MWMC CREDIT If Applicable (see Page 2)
TOTAL - MWMC SDC
SUBTOTAL - (Add Items 1, 2, 3 & 4)
5. ADMINISTRATIVE FEES
Base Charge (Subtotal Above) X
0.50
TOTAL SDC
;::"'~#t-M'
Reviewed By: TROY MCALLISTER
t/E"~~
Date: 04/03/96
$38,739, 56 -p~
$21,335,95~
$16,735,00
$675.40
$16,059, 60 ~;t11r /Y~
$96,002.37
$4,800,12~~~
$100,802.49
~~"~c
7~7y.:?_?
Job Number: 960223
FIXTURE UNIT CALCULATION TABLE
Fixture Type
Bathtub
Drinking Fountain
Floor Drain
Interceptors For Grease/Oil/Solids/Etc
Inteceptors For Sand/Auto Wash/Etc
Laundry Tub/Clotheswasher
Clotheswasher . 3 Or More
Receptor For Refrigerator/Water Station/Etc
Receptor for Commercial Sink/Dishwasher/Etc
Shower, Single Stall
Shower, Gang
Sink, Bar, Commercial, Residential Kitchen
Urinal, Stall/Wall
Wash Basin/Lavatory, Single
Water Closet, Public Installation
Water Closet, Private
Miscellaneous
TOTAL FIXTURE UNITS
Number of
New Fixture
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
Page 2
Unit Fixture
Equivalent Units
2 0
1 0
2 0
3 0
6 0
2 0
6 0
1 0
3 0
2 0
0 .
2 0
2 0
1 0
6 0
4 0
0
0
CREDIT CALCULATION TABLE: Based on assessed value. If improvements occured
after annexation date, credits are calculated separately.
(calculations are by $1000)
Year Annexed: 1969
Credit For Parcel Or Land Only If Applicable:
Improvement (if after annexation date) :
194,640
X
3,47
675,40
o
X
3,47
0.00
CREDIT TOTAL =
$675.40
(If land value is multiplied by 1 then the parcel/land credit is not accurate,)