COMMERCIAL/INDUSTRIAL SPR'NOF'ELO JOB NUMBER ()\o..D.1~-J
PERMIT APPLICATION ~ ~
....- INSPECTION LINE' 726,3769
225 Fifth Street, Springfield, Oregon 97477 .-... t@ OFFICE: 726,3759
LOCATION OF PROPOS~ WORK: '3'11/3;....,{;T'TtJA/ ft:ht)/(7J!~mllY /Yt1I?'O~ I)
ASSESSORS MAP: 1/ t2'Y JJ :;. , TAX LOT 6b. rr__u~~_.
7-9"6~.
(J7 "--7__~
ZIP L?f.77 _q.
OWNER' (S~-L1J7 Z5'C:;;P.
ADDREss:/;,Y-105" i;/f; U~"Y/O/lt!
CITY: < a/'//)q , STATE: r:JP
/ ~ -
DESCRIP~ON OF WORK: OG'7~~ t. ~ ~J'Cl"ne E1FS
li.~ ..J
NEW J<:: REMODEL \J ADDITION DEMOLISH OTHER
PHONE:
VALU~~]ID.J ,J)
ARCHITECT: Gr~iJ A/LQt' IX; /lt3};;Ii!{(k411i w~1'J/7}:IJ
CONTRACTOR'S NAME 17... ,() ADDRESS ;7 . ~/f1' CONTRACTOR' EXPIRES PHO~~
GENERAL: 1':~lllDti?- "rrW;.e- tl!t- . S1/~'lffl)
PLUMBING:
MECHANICAl'
ELECTRICAL:
.. PLUMBING
NO I FEE CHARGE
Single Fixture
Relocated Bldg, I
(new fix, addtll
Water Service I
, It.
Sanitary Sewer I
It.
Storm Sewer I
It.
Backflow DevIce I
I
I
I
I
I
TOTAL PERMIT
I
~o I
MFCHANICAL
Furnflcc/burner & vent
< 100,000 BTUs
Furnace/burner & vent
> 100,000 BTUs
Floor furnace and vent
Suspended wall or floor
mounted unit heater
Appliance Vent
sepiHatc
Stat ionary evap.
cooler
Vent Fdn/Singre
duct
Vent System apart
from AC or htg.
Mechanical exhaust
hood and duct
Permit Issuance
TOTAL PERMIT
- OFFICE USE -
HANDICAP ACCESS:
OUAD AREk
LAND U~.'
FLOOD PLAIN:
. OF BLDGS:
, OF UNIT~'
ZONING:
LIGHTING POWER BUDGET:
OCCY GROUP:
CONSTR. 1'YPE:
HEAT SOURCE:
WATER HEATER:
, OF STORIES:
SQ. FT.
SISQ, FT.
VALUE
SQ. FTG MAIN
SO. FTG ACCES~
SQ, FTG OTHER
X
X
X
TOTAL VALUE OF PROJECT
PLAN CHECK FEE --1D,~3
RCPT'
DATE
BY _.
I BUILDING PERMIT
15% Stale
Surcharoe 2'\.
I MECHANICAL
15% State
SurcharQe
1 PAVING
d\~,~
. ~-
PLUMBING
DEMOLITION
"
5% State
Surcharoe
FENCE
VAlliE .~
1 SID~EWALK-
FT,
I CURBCUT
,"
, lJ\r'l II\(lr ~
'~~L' .
PERMITS
I SYSTEMS
DEVELOPMENT
FT,
I
f'EE_ _._,CHARGi
--- --- I
I
I
I
--I.
I
I
I
I
510.00 J
I
\ ?11),dJ
I
\~ -J...
---tL..LJ_
I
I
TOTAL PERMIT FEES
EXCLUDING ELECT RIC^L
05,t6.___~
.
.
REQUIRED INSPECTIONS
It Is the responsibility of the. permit holder 10 see Ihat all Inspections are made at the proper time. To request an insp~ctlon, call
726,3769 (recorder), state your Cily designaled job number, job address, type ollnspecllon requested and when you Will be ready
for Inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m, will be made
the following work day.
SITE INSPECTION: To be
made 'afte"r~'excavation, but~. \~'\
, prior to setup of forms. .
ROUGH PLUMBING, ___:. ,. ....
ELECTRicAL &., ",
MECHANICAL: No work Is to
be covered until these
insp~ctlons have been made
and approved.
PAVING: After gravel Is In
place but prior to placing
. asphalt ~r concrete.
SPECIAL INSPECTIONS: In accordance
Section 306 of the State Specialty Code
.. a special in~pe'ctor,shall'beempIOyed
by the\Owner/ Contractor during
construction of ' the fOllowing work. A
copy of .the special testing reports shall
be furnished to the Building Division.
UNDERSLAB PLUMBING,
ELECT~ICAL &. .
MECHANICAL: To be made
before any work Is covered.
ATTIC DRAFT STOPS &
CURTAIN WALLS
vl
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel In place, but
prior to placing concrete.
FIREPLACE: Prior to placing
--.----. facing materials and before
.. /f/am~ng Inspec~!on, ,... .
, V,' FRAM.ING: To be made -atte'r
the roof, all framing, fire
blocking and bracing are In
place and all pipes, chimneys
and vents arB complete and
th,e !ou,gh ele9.trl,cal, plumbing
. . . 8.nd, mechanical. are approved.
"
STRUCTURAL CONCRETE: In
, ~xcess of 2500 P.S.!. (306 a.1)
S.TRUCTURAL WELOS:
Performed on the job. (2722 f)
'.' I "J
CONCRETE SLAB: To be
made after all Inslab building
service equipment, conduit, .
pi ping, accessories. and other
~:anClllary equipment items Bre
"in place but before"any
concrete is placed.
'HIGH STRENGTH BOLTING:
:. D'urlng all boll Installation and
tightening operations. (306
, a,6)
. "
INSULATION & VAPOR
BARRIER: TO'De made after all
insulatlon'.and required vapor
barriers are In place but
before any lath or gypsum
board Interior wall covering Is
applied.
FIRE & SEPARATION WALL:
Located and constructed
according to plans,
;:., UNDERGROUND: Plumbing,.
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches.
SPRAYEO ON
FIREPROOFING: U.B.C.
Standards 43,8.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork. (306 a.n &
Chapter 29)
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to Installation of
floor insulation, decking or
Iloor sheathing.
GLU,LAM BEAMS: Inspection
Certificate by an approved
egency. furnished to the City's
Building Division before
beams are placed. (2501 U.B.C.
STDS. 25-10,11).
LATH AND/OR GYPSUM
'BOARD: To be made after ell
lathing and gypsum board,
interior and exterior, Is In
place but before any
plastering Is applied or before
gypsum board Joints and
fasteners are taped and
finished.
POST & BEAM: To be made
prior to Installation of floor
insulation, decking or floor
sheathing.
STRUCTURAL MASONRY: (306
e.7)
FLOOR INSULATION &
VAPOR BARRIERS: To be
made, prior to Installation of
decking or floor sheathing.
SIDEWALK & ORIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub.base material In
place.
MASONRY: Steel location,
bond beams grouting or
verticals In accordance with
UBC 2415.
'In eddltlon to the Inspec-
tions specified, the Building
Official may make or require
other Inspections of any'
construction work to ensure
compliance with the Building,
City or Development Code.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
ROOF SHEATHING AND
NAILING: Prior to Installing
any roof covering.
SITE PLAN REVIEW BOARD: Must be reques,ted 2 days In advance
of the date you wish Inspection. All project conditions such as
landscaping, parking lot st,lplng, etc. must be completed before
requesting this Inspection,
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department Inspections are made and
approved, No occupancy of the premises can be made until a
Certificate of Occupancy has been Issued by the Building Division
and posted on the premises,
FINAL PLUMBING
J
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENTS'
PLANS REVIEWED BY IOiY\ 111 I(U Pf4t+- DATE ( 0, r / . 40
By signature, I stfte and agree, that I have carefully examIned the completed application and do hereby certify that aI/Information
herein is true and correct, and I further certify that any and all work performed shall be done In accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein: and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety DivIs on. I rther certify that only contractors and employees
who are In compliance with ORS 701.055 will be used on this proJec
i further agree to ensure that all required inspectlo
street, that the permit card Is located at the f
tImes during COA. _H.-.- ,-,-
..~
t t roper time, that project address Is readable from the
the approved set of plans will remain on the site at all
Date~~$_
DATE PAID: !J (o,~G((/7
RECEIVED BY: t1j [;/')0 )'
.SlgnalLJf
-
-/
-:'OUNT RECEIV~p :-)5. T6
RECi:IPT ': U--06~
-