Loading...
HomeMy WebLinkAboutPermit Building 1993-5-12 . COM M ERCIALlI N DUSTRIAL PERMIT APPLICATION ~ . JOB NUMBER 98~?'=2'/ INS~ECTION LINE, 726.3769 OFFICE: 726.3759 , 225 Fifth Street, Springfield, Oregon 97477 LOCATION OF PROPOSED WORK: 5'2~~ .AI/~A.h'~~ ASSESSORS MAP: / 7"W1!72.-:2!!ft-~ h. TAX LOT ~""'.:::'/ OWNER ,A-?~/~R j~~ AD~RESS: 9???~ _~~ ;J"9 CITY: p1~#?..lY~ L/r?- STATE: DESCRIPTION OF WORK: .R'~nA:,)";..~ NEW ~ REMODEL ADDITION, (' NAME ARCHITECT:~.t ~~ ~..., ., CONTRACTOR'S NAME GENERAL: ~~~~ PHON'" '?~/-//2tt:> 7f./1-//// ~ . ZIP, 9?tT7"..Q: -I ?/#? ~~.""'.~ ~~ DEMOLISH OTHER VALUE: ADDRESS PHONE J111~'~ 'r ADDRESS CONST, CONTRACTOR # EXPIRES PHONE PLUMBIN'" MECHANICA' ' ELECTRI,CA' . I PLUMBING I NO, FEE CHARGE I Single Fixture I Relocated Bldg. Inew Ii x, addtl) I Water Service It. I Sanitary Sewer It, I Storm Sewer It. Backflow Device MECHANICAL Nt' """ I r""~<ll Furnace/burner & vent <100,000 BTUs Furnace/burner & vent > 100,000 BTUs Floor furnace and vent Suspended wall or floor mounted unit healer Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent System apart from AC or htg. Mechanical exhaust hood and duct Permit Issuance $10,00 TOTAL PERMIT TOTAL PERMIT - OFFICE USE - HANDICAP ACCESS' QUAD AREA- LAND USE: FLOOD PLAIN' ZONING: UY\ \ LIGHTING POWER BUDGET: # OF BLDGf' # OF UNIT'" OCCY GROUP' # OF STORIES: CONSTR. TYP'" HEAT SOURCE: WATER HEATER' S9, FTG MAIN SQ, FT. ~.e.~~' $ISQ, FT, VALUE /2 J!.._'" r X SQ, FTG ACCESS_ SQ, FTG OTHER X X TOTAL VALUE OF PROJECT PLAN CHECK F"" RCPTN OAT" BY I BUILDING PERMIT 15% State Surcharge I MECHANICAL 15% State Surcharae I PAVING ~2 $e::> ~c:r I PLUMBING I 5% State Surcharae I FENCE VALUE $ SIDEWALK I DEMOLITION a/~ -:;~f/' /?c::? I T I L FT, SUBTOTAL PERMITS I SYSTEMS DEVELOPMENT r, CURBCUT , FT, TOTAL PERMIT FEES I EXCLUDING ELECTRICA' ~7,1S -./~./3" 6REQUIRED INSPECTIONS · It is the responsibility of the permit holder to see that all Inspections are made at the proper time. To request an inspection, call 726.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will b~ made the same working day, requests made after 7:00 a.m. will be made the foll?wing work day. SITE INSPECTION: To be made after excavation, but prior to setup of forms. UNDERSLAB PLUMBING, , ELECTRICAL & MECHANICAL: To be made before any work Is covered. ROUGH PLUMBING, ELECTRICAL & MECHANICAL: No work is to be covered until these inspections have been made and approved. PAVING: After gravel is in place but prior to placing asphalt or concrete. k. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel in place, but prior to placing concrete. FIREPLACE: Prior to placing facing materials and before framing Inspection. SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special Inspector shall be employed by the Ownerl Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. ATTIC DRAFT STOPS & CURTAIN WALLS CONCRETE SLAB: To be made after all Inslab building service equipment, conduit, piping, accessories and other ancillary equipment items are in place but before any concrete Is placed. FRAMING: To be made alter the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. STRUCTURAL CONCRETE: In excess of 2500 PS,I. (306 a,1) x STRUCTURAL WELDS: Performed on the job, (2722 f) UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor insulatlon, decking or floor sheathing. INSULATION & VAPOR BARRIER: To be made after all insulation and required vapor barriers are in place but before any lath or gypsum board Interior wall covering is applied, FIRE & SEPARATION WALL: Located and constructed according to plans. HIGH STRENGTH BOLTING: During all bolt installation and tightening operations, (306 a,6) UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. SPRAYED ON FIREPROOFING: U,B,C, Standards 43.8. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork, (306 a,11'& Chapter 29) POST & BEAM: To be made prior to Installatlon of floor Insulation, decking or floor sheathing. LATH AND/OR GYPSUM BOARD: To be made alter all lathing and gypsum board, interior and exterior, Is in place but before any plastering is applied or before gypsum board joints and fasteners are taped and finished. GLU.LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed, (2501 U.B.c, STDS, 25.10,11), FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sheathing. STRUCTURAL MASONRY: (306 a,7) MASONRY: Steel location. bond beams grouting or verticals in accordance with UBC 2415, SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. "In addition to the inspec- tions specified, the Building Official may make or require other Inspections of any construction work to ensure compliance with the Building, City or Development Code. ROOF SHEATHING AND NAILING: Prior to Installing any roof covering. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. ------------------------------------------------------- FINAL ELECTRICAL SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish Inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting this inspection. FINAL PLUMBING FINAL MECHANICAL FINAL BUILDING: Requested after the final plumbing, eiectrlcal, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. FINAL FIRE DEPARTMENT ADDITiONAL COMMENT~' DATE ~../2-<3? VALIDATION: / // AMOUNT ~VE( - ~ 0' RECEIPT .' ?? 7b~ DATE PAID: RECEIVED BY' ~y2~ 9:3 /"/,~' , ~- /..-r