Loading...
HomeMy WebLinkAboutPermit Building 2000-12-11 ., . . I Job# 00-01712-01 I Page 1 of 3 TRANS#:01-0004010 DATE: DEC 11 2000 AMT RECD:1 $ 1013.09 CHANGE: CASHIER: 004 ~ 225 North Fifth Street Springfield, OR 97477 CITY OF SPRINGFIELD, OREGON INDUSTRIAL PERMIT City Of Springfield Community Services Division Building Safety Job Number: 00-01712-01 Office: 726-3759 Inspection Line: 726-3769 Location Of Proposed Site: 5280 Highbanks Rd Spr Assessors Map#: 17022800 Lot: Block: Addition: Owner: Address: Tax Lot #: 00401 Subdivision: Monaco Coach 5280 Highbanks Road Phone Number: 541-678-6801 City/State/Zip: Springfield, OR 97477 Value: $137,913 Scope Of Work: Interior spray booth installation Install four pre-manufactured paint spray booths with associated mechanical, electrical and fire !:::.nrinklAr !=\v!=;tAm mnrlifi("'~tinn!:::. ;:I!:::, rAnIJi(f~ct. Contractor Type General Contr Electrical Contr Fire Mechanical Contr Quad Area: # Of Units: Constr. Type: Water Heater: Alteration Contractor Industrial Finishes & Systems Inc Po Box 2824, Eugene. OR 97402 Philips Electric Inc 1298 Bethel Dr, Eugene, OR 97402-2003 Omlid & Swinney Fire Sprinkler' 1265 N 35Th St, Springfield, OR 97478-5553 Comfort Flow Heating Co 1951 Don St Ste 0, Springfield, OR 97477-1993 Registration # 104682 Expiration Date 2/17/2001 Phone 541-485-1503 54438 9/19/2001 541-688-6121 62730 12/15/2001 541-741-1775 460 6/27/2001 541-726-0100 Office Use Land Use: Zoning Code: Bedrooms: Range: # Of Buildings: Occupancy Group: Heat Source: Sq. Footage: To request an inspection call the 24 hour recording at 726-3769. All inspections requested before 7:00 a,m. will be made the same working day, inspections requested after 7:00 a,m, will be made the following working day. Final Fire Final Building Rough Electrical Final Electrical Required Inspections I Buildinq I -When all Fire Department requirements have been met. - When all required inspections have been approved and the building is complete. Electrical -Prior to cover. - When all electrical work is complete. .. . Rough Gas Rough Mechanical Final Gas Final Mechanical I Job# 00-01712-01 I Required Inspections Mechanical - Prior to cover. - When all gas work is complete. -When all mechanical work is complete, Construction Types: Occupancy Groups: # Of Buildings: # Of Bedrooms: Handicap Access? D ,Area (Sq. r 0' t) I Main: Accessory: Fee Industrial Plan Review Total Plan Check Building Permit State Surcharge For Building Permit Building Administrative Fee Total Building Branch Circuits W/O Feeder or Service State Surcharge - Electrical Administrative Fee - Electrical Total Electrical Minimum Mechanical Permit Administrative Fee - Mechanical Vent Fan to One Duct More than 100,000 BTU Mechanical Issuance State Surcharge - Mechanical Total Mechanical Grand Total Plan Check Type Checked By Structural-C/I/P Fire Marshal-C/I/P Lome Pleger AI Gerard # Of Stories: Current Units: Census Code: Does not apply Total: Paid On Receipt# Plan Check 12/11/2000 0004010 Buildinn 12/11/2000 0004010 12/11/2000 0004010 12/11/2000 0004010 Electrical 12/11/2000 0004010 12/11/2000 0004010 12/11/2000 0004010 Mechanical 12/11/2000 0004010 12/11/2000 0004010 12/11/2000 0004010 12/11/2000 0004010 12/11/2000 0004010 12/11/2000 0004010 Date Completed Comment 12/11/2000 11/22/2000 . Page 2 of 3 Height (feet): Proposed Units: Value/Quantity 137,913 137,913 6 4 4 Fee Amount $337.03 $337.03 $518,50 $36.30 $15,56 $570.36 $45,00 $3,15 $1,35 $49.50 $.00 $1,26 $12,00 $30.00 $10.00 $2.94 $56.20 $1,013.09 . . I Job# 00-01712-01 I Page 3 of 3 By signature. I state and agree that I have carefully examined the completed application and do hereby certify that all information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon. I further state that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that the project address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during construction, ~ Signature '7 ~ ~4-.--- o /:2. -//-C.?O Date , A=;1.'~'.::l'~'J' , bmilted has the following The following prolect as su ire specifiC land use zOning, and does not requ . approval . J.-.1-1 , Zoning 9-!4'a}"! ----B-::l' - ~~ 7lUioQlift\<9 Signature - 225 FIFTH STREET SPRINGFIELD, OREGON INSPECTION REQUEST: OFFICE: 726-3759 1.. LOCATIO~'p~ I~SrALLATION j'/) J 5;:?RO f-llah6anl::-s 'lOctA LEGAL DES~PTION I7GJ2. Z!:S'M/. a-:? l./?> / ~LECTRICAL PERMIT APPLICATION 3. COMPLETE FEE SCHEDULE BELOII City Job Number /?/J-/?/7/2.. 'CO/ A. New Residential-Single or Multi-Family per dwelling unit. Service Included: , JOB DESqu:~ION..u &1 -f'j)4T J:5{"j{")T.b5 - tJ-RQ-uc>[/-- <!- (rCL<.-/7- S ' Permits are non-transferable and expire if work is not started within 180 days of issuance or if work is suspended for 180 days. 2. CONTRACTOR INSTALLATION ONLY Electrical Contractor Philins Electric Address 1 ?QA "Rp...."pl nr;'mo, City __ EUQ'ene Phone(S411 hRR-h171 Supervisor License Number 771qq Expiration Date 10/01/01 Items Cos t Sum 1000 sq.ft. or less Each additional 500 sq. ft or portion thereof Each Manuf'ld Home, or , Modular 'Dwelling' Service or Feeder B. Services or ~eeders Installation, Alterations or Relocation: 200 amps or less 201 amps to 400 amps 401 amps to. 600 amps 601 amps to 1000 amps Over 1000 amps/volts Reconnect Only $ 85.00 $ 15.00 ,$ 40.00 $ 50.00 ' $ 60.00 $100.00 $130.00 $300.00 $ 40.00 Constr Contr. Number 26-34C C. Temporary Services or Feeder's Installation, Alteration or Relocation Expiration Date 10-01-01 .,:;gnature of superViC.Electrician '" ".v) ~)fll1l:'nHJ.ps' D. Ow';ers Name II /()n t1 cO L..Oc{ c. h Address Cf /3;;20 Ji.-Jdus-lr/a/ lA..1y Ci ty (' /'lbu.. (' f Phone' OIINER INS.{IALLATION The installation is being made on proper ty I own whi ch is no t: in tended for sale, lease or rent. owners Signature: . --------------------------------- DATE: /;2~II'&.o RECEIPT #: ~/..a::>o.~'::>/?> RECEIVED BY: ..;;j-:-~ 200 amps' "OT less 201 amps to 400 amps Over 401 to 600 amps Over 600 amps or, 1000 volts Branch Circuits $ 40.00 $ 55.00 $ 80.00 see liB" above .' New, Alteration or Extension Per Panel Miscellaneous (Service/feeder -Each installation ,Pump or irrigation Sign/Outline Lighting Limited Energy/Res Limlted Energy/Comm One Circuit / Each Add it ional Circuit or with ServicJ- 'or Feeder Permit ~ E. 5. SUBTOTAL OF ABOVE ) 7% State Surcharge 3% Administrative Fee TOTAL 3/'00 $35.00 .J $ 2.00 /C). cJQ no t included) $ 40.00 '$ 40.00 $ 20.00 $ 36.00 if.5- 00 <f.50 49.50