Loading...
HomeMy WebLinkAboutComments SUB 3/4/2008 03/04/2008 09.40 FAX 7477348 , r' d WSC FAX ~ 003/004 " SPRINGFIELD UTILlTY BOARD \\ATrIl5[1l\ let CL" rLl< 202 South 18th Street Springfield. OR 97477-5240 Tel 541 7262396 Fax 541 7477348 www subutd com March 4, 2008 Molly Markanan CIty of Spnngfield 225 N. 5th Street Spnngfield, OR 97477 Date Received: Planner: MEM ,tJjof3 Dear Molly: SUBJECT: PARTITION TENTATIVE #SUB2008-00007 THIENES / AMlGOS ill Tax Map 17-02-34-32, Tax Lot 202, North A Street, East of 58th Street LIsted below are our cvuuuents for the above referenced develop~~t proposal: 1. The proposed development is WItlun the Spnngfield CIty hmlts and Will receIve water service from the Springfield Utility Board (SUB). There is an eXisting 8" waterhne located along the frontage of North A Street to serve these propertIes. 2. All new water system faclhties and modifications to water system faclhties both inside and adjacent to the proposed development shall be placed m street nght-of-way at a 10ca1:J.on and depth of bury that meets the standards of the SUB Water rhVlslon. 3. All water facIlIty materials shall be to a standard that must' meet SUB Water DIviSIOn speCIficatIons. 4. All workmanshIp shall be performed to meet or exceed SUB Water DiVIsion construction standards. 5 Size ofwaterlme and other faclhhes, mcluding water meters, must meet the needs of the SUB Water Division and the long-range needs ofthe City. These needs mclude, but are not hroited to, meter location and access, sizes of water dlstnbu1:J.on and transmission lines, pumping facihtIes, and communIcation lines. 6 Please ask the developer to contact the SUB Water DIvision for detailed informatIOn on the matenals and constructIon standards, detaIled costs for msta1lmg SUB water faclh1:J.es, and a schedule of construction. ConstructIon expenses may be reduced with good planmng ofrequrred water facilities, good timing offacihties installatIon, and Jomt trench opportumtIes. 7. All water meters wIll be placed m publIc right-of-way at a location identified by the developer. Each lot or parcel must have Its own water service. 8. Water SerVIce faclhtIes WIll be installed upon collection of development charges. Development polICIes and charges Identified m tlus letter are subject to change. Actual charges WIll be those ill effect at the time water service is requested. S:\SITEPLAN\North A Street, East of 58th partlt10n tentattve 3-3-08.docx 03/04/2008 09:40 FAX 7477348 ;. -o'l WSC FAX ~ 004/004 9. Spnngfield has several wellhead protection areas. Nmety percent of Spnngfield's drinkmg water comes from wells In every mstance, care shall be taken to prevent groundwater contanunatIon. Contractors/developers/owners shall be responsible for the safe handling and storage of chermcals, petroleum products, fertihzers, and the preventu;m of groundwater and storm water runoff contarmnahon. SpeCIal reqUlrements may be necessary for groundwater protection at tlus develut'Hient. Contact Amy Chinitz at Springfield Utihty Board Water DiVISIon for detaIls at 726-2396. 10. Backflow prevention devices Will be reqUITed for tlus service. Please contact Chuck DaVls at 726-2396 pnor to installing water service. Chuck can help in the selection of the most economIcal device and location. Water seTVlce will not be prOVIded until a backflow plan has been subnutted to SUB Water Engmeering and "Pt'~oved fqr installatIon. PLEASE NOTE: SUB development charges are paid directly to SUB Water DivlSlon and SUB Electric DiviSIOn. smcer7 /4k ---z;. h.:- Rebecca Templin, P.E. Water Engmeering Supervisor - Water DIVIsion RATmk CC' Ron Thienes, Amigos III, LLC, P,O. Box 25 Walterville, Oregon 97489 James A. Branch, P.E., P.L S., Branch Engineenng, Inc., 310 Fifth Street, Springfield, Oregon 97477 S'\SITEPLAN\North A Street, East of58lh partltton tentallve 3-3-08 docx