HomeMy WebLinkAboutComments SUB 3/25/2008
~
SPRINGFIELD UTILITY BOARD
WATER SERVICE CENTER 202 South 18th Street Springfield, OR 97477-5240 Tel S41 7262396 Fax 541 7477348 WWW subutd com
March 25,2008
Molly Markanan
CIty of Spnngfield
225 N 5th Street
Sprmgfield, OR 97477
Date Received' '0 I~ II oCb
Planner: MEM
Dear Molly
SUBJECT
PARTITION TENTATIVE #SUB2008-00016 BRANDT-DRURY
Tax Map 17-02-34-44, Tax Lot 1200, 6595 Mam Street
The proposed development already has serVIces to all parcels If any addItIonal servIces may be reqUIred,
then the followmg comments apply
1 The proposed development IS wIthm the Spnngfield CIty lImIts and wIll receIve water servIce
from the Spnngfield UtIlIty Board (SUB) Our water mam IS located under the SIdewalk along
the north SIde of the property and can be easIly tapped If any new serVIces are deSIred.
2 All new water system facIhtIes and modIficatIons to water system facIhtIes both mSIde and
adjacent to the proposed development shall be placed m street nght-of-way at a locatIOn and
depth of bury that meets the standards 'ofthe SUB Water DIVISIon.
3 All water faCIlIty matenals shall be to a standard that must meet SUB Water DIVISIOn
specIficatIons
4 All workmanshIp shall be performed to meet or exceed SUB Water DIVISIon constructIOn
standards
5 SIze ofwaterlme and other faCIlItIes, mcludmg water meters, must meet the needs of the SUB
Water DlvlslOn and the long-range needs of the Clr; These needs mclude, but are Got lImIted ~o,
meter locatIOn and access, SIzes of water dIstrIbutIon and transmISSIon lmes, pumpmg faCIlItIes,
and commumcatIOn lmes
6 Please ask the developer to contact the SUB Water DIVISIon for detailed mformatIOn on the
matenals and constructIOn standards, detaIled costs for mstallIng SUB water faCIlItIes, and a
schedule of constructIOn ConstructIon expenses may be reduced WIth good plannmg of reqUIred
water facIlItIes, good tImmg of faCIlItIes mstallatIOn, and Jomt trench opportumtIes
7 All water: meters wIll be placed m publIc nght-of-way at a locatIOn IdentIfied by the developer
Each lot or parcel must have ItS own water servIce. . :::", ,,-,
S \SfTEPLAN\6595 MaIn Street partltlOn tentatIve 3-24-08 docx
.
/
,-'- ..
8 Water servIce facIlItIes wIll be mstalled upon collectIOn of development charges Development
polIcIes and charges IdentIfied m thIS letter are subject to change Actual charges wIll be those m
effect at the tIme water servIce IS requested.
9 Spnngfield has several wellhead protectIon areas Nmety percent of Spnngfield's dnnkmg water
comes from wells In every mstance, care shall be taken to prevent groundwater contammatIon
Contractors/developers/owners shall be responsIble for the safe handlIng and storage of
chemIcals, petroleum products, fertIlIzers, and the preventIon of groundwater and storm water
runoff contammatIOn
SpecIal reqUIrements may be necessary for groundwater protectIon at thIS development. Contact
Amy ChImtz at Spnngfield UtIlIty Board Water DIVISIOn for detaIls at 726-2396
PLEASE NOTE:
SUB development charges are paId dIrectly to SUB Water DIvIsIOn and
SUB ElectrIc DIvIsIOn
Smcerely,
j;t.
4k
Rebecca Templm, P E
Water Engmeenng SupervIsor - Water DIvIsIon
RATmk
cc MIchael Brandt-Drury, 7906 Thurston Road, Spnngfield, Oregon 97478
Stacy Salladay, Branch Engmeenng, Inc , 310 FIfth Street, Spnngfield, Oregon 97477
S \SITEPLAN\6595 Mam Street partition tentatIve 3-24-08 docx