Loading...
HomeMy WebLinkAboutComments SUB 3/25/2008 ~ SPRINGFIELD UTILITY BOARD WATER SERVICE CENTER 202 South 18th Street Springfield, OR 97477-5240 Tel S41 7262396 Fax 541 7477348 WWW subutd com March 25,2008 Molly Markanan CIty of Spnngfield 225 N 5th Street Sprmgfield, OR 97477 Date Received' '0 I~ II oCb Planner: MEM Dear Molly SUBJECT PARTITION TENTATIVE #SUB2008-00016 BRANDT-DRURY Tax Map 17-02-34-44, Tax Lot 1200, 6595 Mam Street The proposed development already has serVIces to all parcels If any addItIonal servIces may be reqUIred, then the followmg comments apply 1 The proposed development IS wIthm the Spnngfield CIty lImIts and wIll receIve water servIce from the Spnngfield UtIlIty Board (SUB) Our water mam IS located under the SIdewalk along the north SIde of the property and can be easIly tapped If any new serVIces are deSIred. 2 All new water system facIhtIes and modIficatIons to water system facIhtIes both mSIde and adjacent to the proposed development shall be placed m street nght-of-way at a locatIOn and depth of bury that meets the standards 'ofthe SUB Water DIVISIon. 3 All water faCIlIty matenals shall be to a standard that must meet SUB Water DIVISIOn specIficatIons 4 All workmanshIp shall be performed to meet or exceed SUB Water DIVISIon constructIOn standards 5 SIze ofwaterlme and other faCIlItIes, mcludmg water meters, must meet the needs of the SUB Water DlvlslOn and the long-range needs of the Clr; These needs mclude, but are Got lImIted ~o, meter locatIOn and access, SIzes of water dIstrIbutIon and transmISSIon lmes, pumpmg faCIlItIes, and commumcatIOn lmes 6 Please ask the developer to contact the SUB Water DIVISIon for detailed mformatIOn on the matenals and constructIOn standards, detaIled costs for mstallIng SUB water faCIlItIes, and a schedule of constructIOn ConstructIon expenses may be reduced WIth good plannmg of reqUIred water facIlItIes, good tImmg of faCIlItIes mstallatIOn, and Jomt trench opportumtIes 7 All water: meters wIll be placed m publIc nght-of-way at a locatIOn IdentIfied by the developer Each lot or parcel must have ItS own water servIce. . :::", ,,-, S \SfTEPLAN\6595 MaIn Street partltlOn tentatIve 3-24-08 docx . / ,-'- .. 8 Water servIce facIlItIes wIll be mstalled upon collectIOn of development charges Development polIcIes and charges IdentIfied m thIS letter are subject to change Actual charges wIll be those m effect at the tIme water servIce IS requested. 9 Spnngfield has several wellhead protectIon areas Nmety percent of Spnngfield's dnnkmg water comes from wells In every mstance, care shall be taken to prevent groundwater contammatIon Contractors/developers/owners shall be responsIble for the safe handlIng and storage of chemIcals, petroleum products, fertIlIzers, and the preventIon of groundwater and storm water runoff contammatIOn SpecIal reqUIrements may be necessary for groundwater protectIon at thIS development. Contact Amy ChImtz at Spnngfield UtIlIty Board Water DIVISIOn for detaIls at 726-2396 PLEASE NOTE: SUB development charges are paId dIrectly to SUB Water DIvIsIOn and SUB ElectrIc DIvIsIOn Smcerely, j;t. 4k Rebecca Templm, P E Water Engmeenng SupervIsor - Water DIvIsIon RATmk cc MIchael Brandt-Drury, 7906 Thurston Road, Spnngfield, Oregon 97478 Stacy Salladay, Branch Engmeenng, Inc , 310 FIfth Street, Spnngfield, Oregon 97477 S \SITEPLAN\6595 Mam Street partition tentatIve 3-24-08 docx