Loading...
HomeMy WebLinkAboutPermit Miscellaneous 1984-8-20 . . ., '. -- :J morris.redden & associates August 20, 1984 * City of Springfield Development Coordination Board Reference: Taco Time International West Side of 3rd Between Main and South 'A' Street D.C. #84-18 To Whom It May Concern: The following information is submitted in response to your condi- tions of Board approval for the noted project. Our response will be in the same order as you have listed. 1. The proposed sanitary connection will be directly south of the proposed building location. Slight adjustments to this location might be necessarydueto connection location at the existing building. 2. Please refer to the revised site plan for the site drainage. We have noted to remove the existing storm box located by 3rd Street. We have added three (3) catch basins to pick up the ground water of the paved area. These catch basins will be connected in at the existing catch box. The building roof drainage will connect into the new storm drain lines, The ground area around the existing catch box will be raised to conform with the sidewalk level on 3rd Street. 3. The Owner/Developer has been notified of the water service connection fee and will be contact with your people. 4. The Owner/Developer has been notified of electrical service availability and will be in contact with Mr. Virgil Langley. 5. The sidewalks along South 'A' and Main Streets have been extended full width to the sidewalk along 3rd Street. Page 1 of 2 & LQS V'V\.~ ST archlta:ts/pIaMErs/a.LaJp.c. / 1310 coburg road / eugene, oregon 97401 / ,phone 503/342.6511 . . ", '. City of Springfield Development Coordination Board August 20, 1984 6. We have been in contact with the Planning Department concerning the required additions of street trees. The final decision was to add a total of six (6) trees; one tree along South 'A' Street, two trees along Main Street, and three trees along 3rd Street: The trees along South 'A' and Main will be located in planter areas within the sidewalk. We have enclosed a copy of the proposed landscape plan for this site. 7. We will not be adding any additional site lighting to the site. The building has approximately sixteen (16) incandescent fixtures around the outside. We feel this will be sufficient along with the existing street lighting. 8. We have incorporated a five (5) stall bicycle rack into the site plan. 9. We have added the two signs as requested with a note to coordinate size and location with your traffic engineer. 10. We have added a note to the drawings to verify if there are any existing underground fuel storage tanks still on site. If so, the tanks will be removed and the holes filled with compacted sand. This would be coordinated with your Fire Marshall office. We hope this be granted. near future. answers all of your concerns and that approval can We plan to submit for a building permit in the very Very truly yours, , (/~1r7v"'l t. ~~~. Kenton F. Affolter KFA:lp Enclosures cc: Taco Time International, Eugene, OR Page 2 of 2