Loading...
HomeMy WebLinkAboutPermit Building 2002-2-22 p'. . I Job# 02-00057-01 I . SPRINQFIELD ~ Page 1 of 4 TRANS#:01-0008120 DATE:FEB 22 2002 ANT RECD:2 $ 61.75 CHANGE: CASHIER:003 225 Fifth Street Springfield, OR 97477 CITY OF SPRINGFIELD, OREGON RESIDENTIAL PERMIT City Of Springfield Community Services Division Building Safety Job Number: 02-00057-01 Office: 726-3759 Inspection Line: 726-3769 Location Of Proposed Site: Assessors Map#: 17032514 Lot: 19 Block: I(Ofj 2438 Maia Lp ~/8 JCt,. 4(Jl'.1t. 't11#lr Tax Lot #: 04200 .COM,.,~J1fl9,'}j ,$;';4/ I ~ Subdivision: Maia Park '1lVy lQ~~i:rr~I(JQ~~~1t:746-5671 ~J;;~/i!rffl1J.q;~ /J~Hl, ~>>p01 Scope Of Work: Manufactured Home on Private Lot New '!J. OlVtD i'J~f$61 ,956 'Ii . Owner: John & Phyllis Myers P.O. Box 70344 Address: Contractor Type General Contr Electrical Contr Mechanical Contr Plumbing Contr Contractor to~;:E:IVIION" Registration # Expiration Date AI"".. Wrl1l ..One Gooden Harris9,rf"'dil!1lw,Clia!laa: '{}On1.66447 5/7/2002 1441 hwy 99n 'e~~fqe~9PteC/bl,:~requln 0090 'S'~:oO er, Ih r "'!}.f) es ~ Heritage Elec~~. You Tn 1-0010 oSe9tJl'j"lagon (iu t02/15/2004 1042 Horn La IfJiIrt~e~~ Ill7/WA throUgh aes are 8 tilit)! erl. ent COp' ~ etto Gooden Harrison c~sH\Mi9() er, (IVOt :e~Q11h", 9s<-00 rtlf,17/2002 1441 hwy 99n, EUgen~?~gl7~fl20n u~: ~he tet.ee rUles b 1_ 7-800 dlifJ1d/(, 'Plio ~ Gooden Harrison Construction -33<_<3<i~t!f~7;ca,?e 517/2002 1441 hwy 99n, Eugene, OR 97402 4). Ian Phone 541-689-7762 541-729-1500 541-689-7762 541-689-7762 To request an inspection call the 24 hour recording at 726-3769. All inspections requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following working day. Site Footing Foundation Slab Shear Wall Nailing Framing Hold Downs Installed Final Building Verify Ground Rod MH Electrical MH Service Final Electrical Required Inspections I BuildinR I - To be made after excavation but prior to selling forms.. -After trenches are excavated. -After forms are erected but prior to concrete placement - To be made after all inslab building service equipment, conduit piping, and other equipment iter -Before covering sheathing with finish materials. - Prior to cover. - When all required inspections have been approved and the building is complete. I Electrical -Install ground rod at footing, and call for inspection in conjuction with footing andlor foundation i ,- When blocking, setup, and plumbing inspections have been approved and the home is connect - When all electrical work is complete.. ~. . I Job# 02-00057 -01 I . Page 2 of 4 Required Inspections I Plumbing I - After home has been connected to water and sewer.. - Prior to filling trench. -Prior to filling trench. -Prior to filling trench. - When all plumbing work is complete. MH Plumbing Water Line Sanitary Sewer Line Storm Sewer Line Final Plumbing Rough Gas Gas Service , Final Gas Mechanical -After line is installed and line has been connected to a minimum of one appliance. Pressure te: - When all gas work is complete. I Manufactured Home I - When all blocking is complete. -After all required inspections are approved and porches, skirting, decks, venting, house numbel MH Set Up MH Final Zoning: LDR FloodPlain? 0 Wetlands? 0 Journal numbers 1 : ,Comments: 2: Overlay District: # of Street Trees: 3 Land Use: Single Family Dwelling Pave Driveway? 0 3: Additional Requirements: Glenwood Area? 0 Required Attachments: Source Locn: Material: Planner: Sam Gollah Urban Growth Boundary?D Quantity Of Fill: Supplier: Drainage: Floodway FEMA: X-White Construction Types:(VN) Wood Frame Occupancy Groups:Dwelling # Of Buildings: 2 # Of Bedrooms: 3 Handicap Access? 0 rArea (Sq. r ..1) I Main: 1458 Accessory520 Fee Residential Plan Check Total Plan Check Garage/Carport State Surcharge For Building Permit 8% Building Administrative Fee Total Building Manufactured Home ServicelFeeder Branch Circuits With Feeder or Service State Surcharge - Electrical Flood Plain FEMA: 1161 of 2975 Private Garage/Carp/Stor # Of Stories: 1 Height(feet): 16 Current Units: Proposed Units:1 Census Code: New Mfg Home Total:1978 Paid On Receipt# Plan Check 01/16/2002 7789 Value/Quantity Fee Amount 12,956 $85.02 $8s..o2 Building 02/04/2002 7939 02/04/2002 7939 02/04/2002 7939 12,956 $130.80 $9..16 $10,46 $150..42 Electrical 02/04/2002 7939 02/04/2002 7939 02/04/2002 7939 2 1 $100.00 $3.00 $7.21 .. . . Job# 02-00057 -01 Page 3 of 4 Fee Paid On Receipt# Value/Quantity Fee Amount r Electrical 8% Admin Fee - Electrical 02/04/2002 7939 $8.24 Total Electrical $118.45 Plumbing State Surcharge - Plumbing 02/04/2002 7939 $15.54 Water Service Footage 02/04/2002 7939 100 $59.00 Sanitary Sewer Footage 02/04/2002 7939 100 $59.00 Storm Sewer Footage 02/04/2002 7939 100 $59.00 Manufactured Home Connection 02/04/2002 7939 1 $45.00 8% Administrative Fee - Plumbing 02/04/2002 7939 $17.76 Total Plumbing $255.30 Mechanical One to Four Outlets 02/22/2002 8120 1 $4.00 Minimum Mechanical Permit 02/22/2002 8120 $41.00 8% Administrative Fee - Mechanical 02/22/2002 8120 $3.60 Mechanical Issuance 02/22/2002 8120 $10.00 ' State Surcharge - Mechanical 02/22/2002 8120 $3.15 ' Total Mechanical $61.75 Manufactured Home Manufactured Home Setup Fee 02/04/2002 7939 49,000 $160.00 Manufactured Home State Issuance 02/04/2002 7939 1 $30.00 State Surcharge For Manufactured Hom, 02/04/2002 7939 $11.20 Manufactured Home Administrative Fee 02/04/2002 7939 $12.80 Total Manufactured Home $214..00 System Development Residential - Single Family - Storm 02/04/2002 7939 2,953 $806.16 Residential Improvement MWMC 02/04/2002 7939 1 $34.83 MWMC Administrative Fee 02/04/2002 7939 1 $10.00 SDC Administrative Fee 02/04/2002 7939 $145.07 Residential Sanitary MWMC 02/04/2002 7939 1 $332.86 Residential - Improvement 02/04/2002 7939 1 $659.76 Residential- Reimbursement 02/04/2002 7939 1 $155.13 Sanitary Sewer SDC Reimbursement 02/04/2002 7939 24 $512.88 Sanitary Sewer SDC Improvement 02/04/2002 7939 24 $389.76 Total System Development $3,046.45 Willamalane SDC Manufactured Home - Willamalane 02/04/2002 7939 1 $1,000.00 Total Willamalane SDC $1,000.00 Planning Planning Plan Review 02/04/2002 7939 1 $50.00 Total Planning $50..00 Permits wlo Srchg Address Assignment 02/04/2002 7939 1 $8.00 Total Permits wlo Srchg $8.00 Grand Total $4,989..39 Plan Check Type Checked By Date Completed Comment Initial Review-Res Lisa Hopper 01/17/2002 .- . , . . Job# 02-00057-01 I Page 4 of 4 Plan Check Type Checked By Date Completed Comment Engineering-Res Steve Templin 02/04/2002 Planning-Res Sam Gollah 01/29/2002 Structural-Res Bob Barnhart 01/29/2002 By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Ore90n pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project I further~ are to ens e that address is ~a e f I the approved et pi, inS .....1 ":--:--l \ I Signature I required inspections are requested at the proper time, that each eet, that the permit card is located at the front of the propery, and the " on the site at all times during construction. -. 2-2:Z-01- Date ~ -