HomeMy WebLinkAboutPermit Building 1996-5-2
SPRINQFIELD
~-
Page 1
RESIDENTIAL PERMIT APPLICATION
CITY OF SPRINGFIELD
COMMUNITY SERVICES DIVISION
BUILDING SAFETY
Job Number: 960386
225 North Fifth Street
Springfield, OR 97477
Office: 726-3759
Inspection Line: 726-3769
*
Location of Proposed Work: 3858 LONG RIDGE DR
Assessors Map #: 18020613
Lot: 2 Block:
Tax Lot #: 10002
Subdivision: 93-05-71
OWner: LARRY LEMOIGNE
Address: 3853 JASPER ROAD
Phone #: 747-2857
City/State/Zip: SPRINGFIELD, OREGON 97478
Describe Work: S.F. RESIDENCE
NEW
Const.
Contractor Contractor # Expires Phone
General: KIDDER 0054321 08/28/96 484-5236
13 76 Brickly Rd Eugene OR 974010000
PI urnbing: CAMERON 0000843 07/07/96 344-1462
303 S Van Duyn Eugene OR 974010000
Mechanical: MARSHALLS 0025790 12/23/96 747-7445
4131 E St Springfield OR 974780000
Electrical: BINNS ELECTRIC 0073 762 06/06/96 687-1362
210 Wallis Str Unit #C Eugene OR 97
QUAD AREA: 5RSC
# OF UNITS: 1
CONSTR. TYPE: VN
WATER HEATER: E
SQ FOOTAGE: 1353
OFFICE USE --
LAND USE: 1111
ZONING CODE: LDR
# OF BDRMS: 3
RANGE: E
# OF BLDGS: 1
OCCY GROUP: R3
HEAT SOURCE: WH
INSUL PATH: PI
TO request an inspection, call the 24 hour recording at 726-3769.
All inspections requested before 7:00 a.m. will be made the same working day,
inspections requested after 7:00 a.m. will be made the following work day.
REQUIRED INSPECTIONS ---
SITE - To be made after excavation but prior to setting forms.
FOOTING - After trenches are excavated.
FOUNDATION - After forms are erected but prior to concrete placement.
UNDERFLOOR PLUMBING - Prior to insulation or decking.
UNDERFLOOR MECHANICAL - Prior to insulation or decking.
POST AND BEAM - Prior to floor insulation or decking.
INSULATION - Floor; prior to decking wall/Ceiling; Prior to coVer
STORM SEWER LINE - Prior to filling trench.
SANITARY SEWER LINE - Prior to filling trench.
WATER LINE - Prior to filling trench.
ROUGH PLUMBING - Prior to cover.
ROUGH MECHANICAL - Prior to cover.
ROUGH ELECTRICAL - Prior to cover.
ELECTRICAL SERVICE - Must be approved to obtain permanent power.
FRAMING - Prior to cover.
INSULATION - Floor; prior to decking Wall/Ceiling; Prior to cover
DRYWALL - Prior to taping.
FINAL PLUMBING - When all plumbing work is complete.
FINAL MECHANICAL - When all mechanical work is complete.
FINAL ELECTRICAL - When all electrical work is complete.
FINAL BUILDING - When all required inspections have been approved and
the building is complete.
SPAINQFIELD
Job Number: 960386
Lot Faces: S
Topography: 2
Solar Approved: Y
N
House 48
Garage 53
Item
Main
Garage
Total Value
Building Permit Fee
Surcharge/Admin
TOTAL FEE
Lot Sq. Ft.: 20000
Total Height: 17.5
Lot Type: INTERIOR
Setbacks
S W E
30 150 12
40 180
Page 2
Lot Coverage: 7 %
Setbk From NPL: 55
BUILDING PERMIT ---
Square Feet x
993
360
$/square Feet
64.16
16.27
--- SYSTEMS DEVELOPMENT CHARGE (SDC) ---
= Value
63,711.00
5,857.00
69,568.00
343.00
27.44
(Al
370.44
(B)
900.57
Systems Development Charge is due on all undeveloped properties within the City
limits and the Citys Urban Growth Boundry which are being improved.
Item
Fixtures
Plumbing Permit
Surcharge/Admin
TOTAL CHARGE
Exhaust Hood
Vent Fan
Dryer Vent
Mechanical Permit
Issuance
Surcharge/Admin
TOTAL PERMIT
Surcharge/Admin
WILLAMALANE SDC
~~l1peR.."'.n'": :.::....1.....:.~.....:.'-~-""' .
PLUMBING PERMIT ---
2
MECHANICAL PERMIT - - -
3
--- MISCELLANEOUS PERMITS ---
TOTAL MISCELLANEOUS PERMITS
(Excluding Electrical)
unless otherwise noted
TOTAL AMOUNT DUE
(A, B, C, D, and E combined)
Fee
160.00
160.00
12.80
(C)
172.80
4.50
9.00
3.00
16.50
10.00
1. 33
(D)
27.83
0.00
1,000.00
:2. ~.l-
(El
1,043.20
. ~,''3~.~. ~4-
2~7/,~4
Job Number: 960386
Page 3
--- BUILDING VALUE, PLAN CHECK AND BUILDING PERMIT ---
This permit is granted on the express condition that the said construction
shall, in all respects, conform to the Ordinance adopted by the City of
Springfield, including the Development Code, regulating the construction and
use of buildings, and may be suspended or revoked at any time upon violation
of any provisions of said ordinances.
Plan Check Fee: 213.20 Date Paid: 03/21/96
Received By:
Plans Reviewed By: DON MOORE Date: 04/10/96
Building Site Reviewed By: LISA HOPPER
Receipt Number: 20782
- - - ADDITIONAL COMMENTS
PATH 1 NEED DRAINAGE PLAN SEPTIC TANK LAYOUT AND PERMIT
FACILITIES PERMIT FOR ASPHALT MAT
WATER AGREEMENT WITH SUB
DRIVEWAY REQUIRED TO BE PAVED
5 STREET TREES REQUIRED
COPY OF LANE COUNTY
By signature, I state and agree, that I have carefully examined
the completed application and do hereby certify that all information hereon
is true and correct, and I further certify that any and all work performed
shall be done in accordance with the Ordinances of the City of Springfield,
and the Laws of the State of Oregon pertaining to the work described herein,
and that NO OCCUPANCY will be made of any structure without permission of the
Community Services Division, Building Safety. I further certify that only
contractors and employees who are in compliance with ORS 701.055 will be
used on this project,
I further agree to ensure that all required inspections are requested at the
proper time, that each address is readable from the street, that the permit
card is located at the front of the property, and the approved set of plans
will remain on the site at all times during construction.
/9---
~.
,) J.,/f,
Date
Signature
- -- VALIDATION
Date Paid:
21-t-t' 3
S"/7~~
?.-I71,~4
-~
Receipt Number:
Amount Received:
Received By:
I
,
i"f . '"
't
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE
(RESIDENTIAL)
Name or Company: LARRY LEMOIGNE
Location: 3858 LONG RIDGE DR
Developement Type: R Building Size:
Job No.: 960386
Lot Size:
l. STORM DRAINAGE
Impervious Sq Ft 1978 X 0.210 Per Sq Ft =
2. SANITARY SEWER - CITY
Number Of PFUs 0 X 43.43 Per PFU
(see Page 2)
3. TRANSPORTATION
Number Of Units
1 X
X Trip Rate
1.010 X
X
Cost Per Trip
437.93
$442.31
Transportation Total
4. SANITARY SEWER - MWMC
Number Of PFUs
o
X
X
Per PFU + MWMC Admin Fee
18.750
MWMC CREDIT If Applicable (see Page 2)
TOTAL - MWMC SDC
SUBTOTAL - (Add Items 1, 2, 3 & 4)
5. ADMINISTRATIVE FEES
Base Charge (Subtotal Above) X
0.50
TOTAL SDC
Reviewed By: TROY MCALLISTER
Date: 03/27/96
Page 1
Sq Ft
$415.38
$0.00
$442.31
$0.00
$0.00
$0.00
$857.69
$42.88
$900.57
)"
,
\
'"
c
,
SPRINGFIELD
Job Number: 960386
Page 2
FIXTURE UNIT CALCULATION TABLE
Fixture Type
Bathtub
Drinking Fountain
Floor Drain
Interceptors For Grease/Oil/Solids/Etc
Inteceptors For Sand/Auto Wash/Etc
Laundry Tub/Clotheswasher
Clotheswasher - 3 Or More
Receptor For Refrigerator/Water Station/Etc
Receptor for Commercial Sink/Dishwasher/Etc
Shower, Single Stall
Shower, Gang
Sink, Bar, Commercial, Residential Kitchen
Urinal, Stall/Wall
Wash Basin/Lavatory, Single
Water Closet, Public Installation
Water Closet, Private
Miscellaneous
TOTAL FIXTURE UNITS
Number of
New Fixture
Unit
Equivalent
Fixture
Uni ts
1
o
o
o
o
1
o
o
o
1
o
1
o
2
o
2
o
2
1
2
3
6
2
6
1
3
2
2
o
o
o
o
2
o
o
o
2
o
2
o
2
o
8
o
2
2
1
6
4
18
CREDIT CALCULATION TABLE: Based on assessed value. If improvements occured
after annexation date, credits are calculated separately.
(calculations are by $1000)
Year Annexed:
Credit For Parcel Or Land Only If Applicable:
Improvement (if after annexation date) :
o
X
0.00 =
0.00
o
X
0.00
0.00
CREDIT TOTAL =
$0.00
(If land value is multiplied by 1 then the parcel/land credit is not accurate.)