Loading...
HomeMy WebLinkAboutPermit Building 1996-5-2 SPRINQFIELD ~- Page 1 RESIDENTIAL PERMIT APPLICATION CITY OF SPRINGFIELD COMMUNITY SERVICES DIVISION BUILDING SAFETY Job Number: 960386 225 North Fifth Street Springfield, OR 97477 Office: 726-3759 Inspection Line: 726-3769 * Location of Proposed Work: 3858 LONG RIDGE DR Assessors Map #: 18020613 Lot: 2 Block: Tax Lot #: 10002 Subdivision: 93-05-71 OWner: LARRY LEMOIGNE Address: 3853 JASPER ROAD Phone #: 747-2857 City/State/Zip: SPRINGFIELD, OREGON 97478 Describe Work: S.F. RESIDENCE NEW Const. Contractor Contractor # Expires Phone General: KIDDER 0054321 08/28/96 484-5236 13 76 Brickly Rd Eugene OR 974010000 PI urnbing: CAMERON 0000843 07/07/96 344-1462 303 S Van Duyn Eugene OR 974010000 Mechanical: MARSHALLS 0025790 12/23/96 747-7445 4131 E St Springfield OR 974780000 Electrical: BINNS ELECTRIC 0073 762 06/06/96 687-1362 210 Wallis Str Unit #C Eugene OR 97 QUAD AREA: 5RSC # OF UNITS: 1 CONSTR. TYPE: VN WATER HEATER: E SQ FOOTAGE: 1353 OFFICE USE -- LAND USE: 1111 ZONING CODE: LDR # OF BDRMS: 3 RANGE: E # OF BLDGS: 1 OCCY GROUP: R3 HEAT SOURCE: WH INSUL PATH: PI TO request an inspection, call the 24 hour recording at 726-3769. All inspections requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following work day. REQUIRED INSPECTIONS --- SITE - To be made after excavation but prior to setting forms. FOOTING - After trenches are excavated. FOUNDATION - After forms are erected but prior to concrete placement. UNDERFLOOR PLUMBING - Prior to insulation or decking. UNDERFLOOR MECHANICAL - Prior to insulation or decking. POST AND BEAM - Prior to floor insulation or decking. INSULATION - Floor; prior to decking wall/Ceiling; Prior to coVer STORM SEWER LINE - Prior to filling trench. SANITARY SEWER LINE - Prior to filling trench. WATER LINE - Prior to filling trench. ROUGH PLUMBING - Prior to cover. ROUGH MECHANICAL - Prior to cover. ROUGH ELECTRICAL - Prior to cover. ELECTRICAL SERVICE - Must be approved to obtain permanent power. FRAMING - Prior to cover. INSULATION - Floor; prior to decking Wall/Ceiling; Prior to cover DRYWALL - Prior to taping. FINAL PLUMBING - When all plumbing work is complete. FINAL MECHANICAL - When all mechanical work is complete. FINAL ELECTRICAL - When all electrical work is complete. FINAL BUILDING - When all required inspections have been approved and the building is complete. SPAINQFIELD Job Number: 960386 Lot Faces: S Topography: 2 Solar Approved: Y N House 48 Garage 53 Item Main Garage Total Value Building Permit Fee Surcharge/Admin TOTAL FEE Lot Sq. Ft.: 20000 Total Height: 17.5 Lot Type: INTERIOR Setbacks S W E 30 150 12 40 180 Page 2 Lot Coverage: 7 % Setbk From NPL: 55 BUILDING PERMIT --- Square Feet x 993 360 $/square Feet 64.16 16.27 --- SYSTEMS DEVELOPMENT CHARGE (SDC) --- = Value 63,711.00 5,857.00 69,568.00 343.00 27.44 (Al 370.44 (B) 900.57 Systems Development Charge is due on all undeveloped properties within the City limits and the Citys Urban Growth Boundry which are being improved. Item Fixtures Plumbing Permit Surcharge/Admin TOTAL CHARGE Exhaust Hood Vent Fan Dryer Vent Mechanical Permit Issuance Surcharge/Admin TOTAL PERMIT Surcharge/Admin WILLAMALANE SDC ~~l1peR.."'.n'": :.::....1.....:.~.....:.'-~-""' . PLUMBING PERMIT --- 2 MECHANICAL PERMIT - - - 3 --- MISCELLANEOUS PERMITS --- TOTAL MISCELLANEOUS PERMITS (Excluding Electrical) unless otherwise noted TOTAL AMOUNT DUE (A, B, C, D, and E combined) Fee 160.00 160.00 12.80 (C) 172.80 4.50 9.00 3.00 16.50 10.00 1. 33 (D) 27.83 0.00 1,000.00 :2. ~.l- (El 1,043.20 . ~,''3~.~. ~4- 2~7/,~4 Job Number: 960386 Page 3 --- BUILDING VALUE, PLAN CHECK AND BUILDING PERMIT --- This permit is granted on the express condition that the said construction shall, in all respects, conform to the Ordinance adopted by the City of Springfield, including the Development Code, regulating the construction and use of buildings, and may be suspended or revoked at any time upon violation of any provisions of said ordinances. Plan Check Fee: 213.20 Date Paid: 03/21/96 Received By: Plans Reviewed By: DON MOORE Date: 04/10/96 Building Site Reviewed By: LISA HOPPER Receipt Number: 20782 - - - ADDITIONAL COMMENTS PATH 1 NEED DRAINAGE PLAN SEPTIC TANK LAYOUT AND PERMIT FACILITIES PERMIT FOR ASPHALT MAT WATER AGREEMENT WITH SUB DRIVEWAY REQUIRED TO BE PAVED 5 STREET TREES REQUIRED COPY OF LANE COUNTY By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project, I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. /9--- ~. ,) J.,/f, Date Signature - -- VALIDATION Date Paid: 21-t-t' 3 S"/7~~ ?.-I71,~4 -~ Receipt Number: Amount Received: Received By: I , i"f . '" 't CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE (RESIDENTIAL) Name or Company: LARRY LEMOIGNE Location: 3858 LONG RIDGE DR Developement Type: R Building Size: Job No.: 960386 Lot Size: l. STORM DRAINAGE Impervious Sq Ft 1978 X 0.210 Per Sq Ft = 2. SANITARY SEWER - CITY Number Of PFUs 0 X 43.43 Per PFU (see Page 2) 3. TRANSPORTATION Number Of Units 1 X X Trip Rate 1.010 X X Cost Per Trip 437.93 $442.31 Transportation Total 4. SANITARY SEWER - MWMC Number Of PFUs o X X Per PFU + MWMC Admin Fee 18.750 MWMC CREDIT If Applicable (see Page 2) TOTAL - MWMC SDC SUBTOTAL - (Add Items 1, 2, 3 & 4) 5. ADMINISTRATIVE FEES Base Charge (Subtotal Above) X 0.50 TOTAL SDC Reviewed By: TROY MCALLISTER Date: 03/27/96 Page 1 Sq Ft $415.38 $0.00 $442.31 $0.00 $0.00 $0.00 $857.69 $42.88 $900.57 )" , \ '" c , SPRINGFIELD Job Number: 960386 Page 2 FIXTURE UNIT CALCULATION TABLE Fixture Type Bathtub Drinking Fountain Floor Drain Interceptors For Grease/Oil/Solids/Etc Inteceptors For Sand/Auto Wash/Etc Laundry Tub/Clotheswasher Clotheswasher - 3 Or More Receptor For Refrigerator/Water Station/Etc Receptor for Commercial Sink/Dishwasher/Etc Shower, Single Stall Shower, Gang Sink, Bar, Commercial, Residential Kitchen Urinal, Stall/Wall Wash Basin/Lavatory, Single Water Closet, Public Installation Water Closet, Private Miscellaneous TOTAL FIXTURE UNITS Number of New Fixture Unit Equivalent Fixture Uni ts 1 o o o o 1 o o o 1 o 1 o 2 o 2 o 2 1 2 3 6 2 6 1 3 2 2 o o o o 2 o o o 2 o 2 o 2 o 8 o 2 2 1 6 4 18 CREDIT CALCULATION TABLE: Based on assessed value. If improvements occured after annexation date, credits are calculated separately. (calculations are by $1000) Year Annexed: Credit For Parcel Or Land Only If Applicable: Improvement (if after annexation date) : o X 0.00 = 0.00 o X 0.00 0.00 CREDIT TOTAL = $0.00 (If land value is multiplied by 1 then the parcel/land credit is not accurate.)