Loading...
HomeMy WebLinkAboutPermit Building 1995-10-18 ~, .:-......n l.b"/"-L 7 ~.?"r&;:- :</6 ...47AZAV- ~ - - ~ -?~ , '/ DESCRIPTION OF WORK .:1?~<:?~ )~..-:,,~~ 4-/~#V..cL~ ~~?"'l:"" ~>:-:.S~~~ VALUE:_~~~ COMMERCIALlINDUSTRIAC. . PERMIT APPLICATION ~ 225 Fifth Street, Springfield, Oregon 97477 LOCATION OF PROPOSED WORK: -:2.,4;;" ~""".A-' ~~ ASSESSORS MAP' /?-C:>'"3'- ?<;"-~.:? OWNER' ADDRESS: CITY' STATF' NEW REMODEL ADDITION DEMOLISH NAME ADDRESS ARCHITECT' CONTRACTOR'S NAME ."ADDRESS , r'.o~~~ GENERAL:/./"w~ ';'"":3:::..:-"..- c.', ~.....:t:;:?:.:: ~"d1:'~ . .r.,1'. r - - r PLUMBING' MECHANICAL: ELECTRICAl' PLUMBING I Nn I I I 1/'7/871 ., . 1 I 1 I I 1 1- 1 1 1 1 I I NO. FEE CHARGE Single Fixture Relocated Bldg. Inew Ilx. addtl) Water ServIce Sanitary Sewer It. fl. It. Storm Sewer - Backflow Device '. TOTAL PERMIT . , JOB NUMBER qs--/.6 './..t:... .. INSPECTION LINE: 726.3769 OFFICE: 726.3759 TAX LOT: a:::> ~~ PHONF' /P-? ~ . ZIP: OTHER PHONE CONST. CONTRACTOR' EXPIRES PHONE ~Y~5'. ... /c>-c:;;~ ~g~-~/ .. -* : ... MECHANICAL I ("HARG] I I I I, J I 1 I I $10.00 j I eee Furnace/ burner & vent <100.000 BTUs Furnacel burner & vent > 100.000 BTUs Floor furnace and vent Suspended wall or floor mounted unit heater Appliance Vent separate Stationaryevap. cooler Vent Fan/Single duct Vent System apart from AC or htg. Mechanical exhaust hood and duCI . I TOTAL PERMIT Permit Issuance - OFFICE USE - QUAD AREA' LAND USE: . OF BLDGS' . OF UNIT~' OCCY GROUP' CONSTR, TYPF' . OF STORIEQ. , HEAT SOURce, SQ. FT, $/SQ, FT. SQ, FTG MAIN X SQ, FTG ACCES~ SQ, FTG OTHER X X PLAN CH ECK FEr RCPP OAT" I BUILDING PERMIT /~:.?O ' PLUMBING 15% State -1:;~ 5% State Surcha~Qe SurcharQe MECHANICAL 1 FENCE VALUE $ 5% Stale I I SIOEWAL~ SUfcharae FT. I PAVING I 1 CU RBCUT FT. HANDICAP ACCESS: FLOOD PLAIN: ZONING: LIGHTING POWER BUDGET: WATER HEATER' VALUE .:..,','.;,:L . " TOTAL VALUE OF PROJECT . BY , DEMOLITION SUBTOTAL' " PERMITS, SYSTEMS , DEVELOPMENT [, I " TOTAL P'ERMIT FEES EXCLUDING ELECTRIC^L //2.97 . REQUIRED INSPECTIONS . '1 \ It is the responsibility of the permit holder to see that all inspectIons are made at the proper time, To request an inspection, call 726.3769 (recorder), state your City designated job number, Job address, type of Inspection requested and when you will be ready for Inspection. Requests received before 7:00 a.m, wilt be made the same working day, requests made after 7:00 a,m, will be made the following work day, SITE INSPECTION: To be made after excavation, but prior to setup of forms, UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work Is covered. ROUGH PLUMBING, , " ELECTRICAL & " . MECHANICAL: No work Is to_ be covered until these " "- inspections have been made and approved. PAVING: After gravel Is In place but prior to placing asphalt or concrete. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel In place, but prior to placing concrete, FIREPLACE: Prior to placing facing materials and before framing Inspect.ion. SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a speCial Inspector shall be employed by the Ownerl Contractor during 'construction of the following work. A copy of the special testing reports shall be furnished to the Building Division, ATTIC DRAFT STOPS & CURTAIN WALLS CONCRETE SLAB: To be made after all Inslab building service equIpment, conduit, piping, accessories and other ancillary equipment items are In place but before any concrete Is placed, FRAMING: To be made after the roof, all framing, fire blocking and bracing are In place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. STRUCTURAL CONCRETE: In excess of 2500 P.S,I, (306 a.1) STRUCTURAL WELDS: Performed on the job. (2722 f) UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. INSULATION & VAPOR- : BARRIER: To be made alter all Insulation and required vapor barriers are In place but before any lath or gypsum board Interior wall covering is applied. HIGH STRENGTH BOLTING: During all bolt installation and tightening operations. (306 a.6) '..... SPRAYED ON FIREPROOFING: U.BC, Standards 43-8. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to Installation of floor Insulation, decking or floor sheathIng, FIRE & SEPARATION WALL: Located and constructed according to plans. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork, (306 a,11 & Chapter 29) POST & BEAM: To be made prior to Installatlon of floor Insulation, deckIng or floor sheathing. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, Interior and exterior, Is In place but before any plastering Is applied or before gypsum board Joints and fasteners are taped and finished. GLU.LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Bulldlng"Dlvlslon before beams are placed, (2501 U,BC, STDS. 25-10,11). STRUCTURAL MASONRY: (306 a,7) y fi:?,o/q ;?~~ ~ 4~/'--~r/&I!f/_ K '(5.' :P~. 'In ~tc1t~;;'eb. tlons specified, the Building Official may make or require' CURB AND APPROACH other Inspections of any ROOF SHEATHING AND APRONS: After forms are constructIon work to ensure NAILING: Prior to installing erected but prIor to placing compliance with the Building, ____an~~~coverlng.__________~oncret~______________~~~~Develo~e~~~~_ FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sheathing. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavatlng complete and form work and sub.base material In place, MASONRY: Steel location, bond beams grouting or vertlcals in accordance with UBC 2415. FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2'days in advance of the date you wish Inspection, All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting this InspectIon. FINAL BUILDING: Requested after the final plumbing, eiectrical, mechanical and Fire Department inspections are made and approved, No 9ccupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. . FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL ADDITIONAL COMMENTS' PLANS REVIEWED BY DATe By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all Information herein Is true a'nd correct, and I further certify that any and all work performed shall be done In accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division, I further certify that only contractors and employees "who are In compliance with GRS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address Is readable from the street, that the permit card is located at the fronI of the property, and the approved set of plans will remain on the site at all times during con~tlon/ . Slgnaturo /<</A.;~ Date--J.11 - /,11- 9.~- DATE PAID' /O~~S- RECEIVED BY: ~ VALIDATION: AMOUNT RECEiVED' //7./fi'? /~/~ RECEIPT ,"