Loading...
HomeMy WebLinkAboutApplication APPLICANT 4/3/2008 TENTATIVE SITE PLAN REVIEW APPLICATION PRE-SUBMITTAL CHECKLIST Engineer: Jesse Jones Case#: PRE2008-0002l PUBLIC WORKS ENGINEERING o Site Assessment of Existing Conditions Complete Incomplete See PW Note(s) ~ ~ L8J ~ 0 ~ ' t o ~ 2 ~ I7i'fI tS:J ~ ~ r;t L8J o L8J o RevIsed 10/25/07 Prepared by an Oregon licensed Landscape Architect or Engineer Vicinity Map The name, location, and dimensions of all existing site features including buildings, curb cuts, trees and impervious surface areas, clearly indicating what is remaining and what is being removed. For existing structures to remain, also indicate present use, size, setbacks from property lines, and distance between buildings The name, location, dimensions, direction of flow and top of bank of all watercourses and required riparian setback that are shown on the Water Quality Limited Watercourse Map on file in the Development Services Department The 100-year floodplain and floodway boundaries on the site, as specified in the latest adopted FEMA Flood Insurance Rate Maps or FEMA approved Letter of Map Amendment or Letter of Map Revision The Time of Travel Zones, as specified in SDC 3.3-200 and delineated on the Wellhead Protection Areas Map on file in the Development Services Department Physical features including, but not limited to trees 5" in diameter or greater when measured 4 V2 feet above the ground, significant clusters of trees and shrubs, riparian areas, wetlands, and rock outcroppings Soil types and water table information as mapped and specified in the Soils Survey of Lane County. A Geotechnical Report prepared by an Engineer must be submitted concurrently if the Soils Survey indicates the proposed development area has unstable soils and/or a high water table Date ~e8@~VOO:~ /.200 g Plaflfl@fi AL T o Improvement and Public Utilities Plan must be in compliance with the regulations of SDC Sections 5.17-100, 4.1-100, 4.2-100, and 4.3-100 and must include the following information: Complete Incomplete See PW Note(s) I8l D D I8l 3 M<' ~~ [gJ D ~~ D t8l 4 Prepared by an Oregon licensed Civil Engineer Location and width of all existing and proposed easements Location of existing and required power poles, transformers, neighborhood mailbox units, and similar public facilities Location and size of existing and proposed utilities on and adjacent to the site, including sanitary sewer mains, stormwater management systems, water mains, power, gas, telephone, and cable TV. Indicate the proposed connection points 0 Grading and Paving Plan Complete Incomplete See PW Note(s) t8l D Prepared by an Oregon licensed Civil Engineer t8l D Planting plan prepared by an Oregon licensed Landscape Architect where plants are proposed as part of the stormwater management system [gJ D Roof drainage patterns and discharge locations t8l D Pervious and impervious area drainage patterns I8l D The size and location of stormwater management systems components, including but not limited to: drain lines, catch basins, dry wells and/or detention ponds; stormwater quality measures; and natural drainageways to be retained l23J 0 Existing and proposed spot elevations and contours lines drawn at 1 foot intervals (for land with a slope over 10 percent, the contour lines may be at 5 foot interva Is) 0 t8l 5 Amount of proposed cut and fill o Stormwater Management System Study - provide four (4) copies of the study with the completed Stormwater Seoping Sheet attached. The plan, calculations, and documentation must be consistent with the Engineering Design Standards and Procedures Manual. Complete Incomplete See PW Note(s) ~ 0 Revised 10/25/07 Scoping Sheet and attached Storm water Management System Study H/~ I Date ReceIVed:~/ 2oo~ Planner: Al PW Notes: 1. Provide clarification of existing conditions. Site plan does not match current site conditions. 2. Provide the name, location, dimensions, direction of flow and top of bank of all watercourses and required riparian setback that are shown on the Water Quality Limited Watercourse Map on file in the Development Services Department. 3. Provide a 7.0' P.U.E. along the Gateway St. and Game Farm Road East frontage. 4. Clarify which existing utility lines are being abandoned and which remain. Specify the size of pipes you are proposing to connect to. Identify all existing or proposed public sidewalks, ramps and pedestrian access ways on plans. 5. Provide proposed amount of cut and fill on the plan set. Additional comments not related to the completeness of ~he application: · The trash enclosure must be covered, hydraulically isolated and drained to the sanitary sewer. Please confirm that the trash enclosure IS be covered and hydraulically isolated. I · Coordinate with aDaT to verify the outfall of swale #1 into th1e existing ditch on aDaT right of way is acceptable. · General plan sheet cleanup (to be discussed at meeting) Date Necelved: 1/ ~/).~~{_,__ Planner: Al -T7 Revised 10/25/07